HIRA Practice FINAL HIRA Practical Activity • Conduct a full HIRA on the scenario in the picture (a rotating shaft between two machine components) Notes Identified Hazard Initial Risk Evaluation Persons at Risk S P R Accept Residual Risk? Residual Risk Controls (Include existing and proposed) S P R Y/N Confirm Complete