D C B C re FU 0.4 Roping 2:1 100 D/sheave 100 CW sheave 100 1200 mm x HD 2000 mm Cabin CW 800 mm x CD 1300 mm Door OP 600 mm x OPH 2000 Speed 0.4 OH Pit mm (m/s) 2.0 (KW) ≥3300 (mm) ≥300 (mm) 380V 3phase 5wire,50Hz,fluctuation ±7% Support Force (N) R1 R2 R3 R4 P1 P2 P3 P4 45000 34000 P ci si on Hoistway Liight Per≤7000 CAR&CWT.RAIL BRACKET SPACING≤2000 FU JI The work that the owner and the construction party should complete 1.The constrution and waterproofing of pit about the shaft and machine room; 2.The dynamic power from the receving box,piping of lighting earth line project and including the main switch; 3.Reserved hole about each exists and machine room floor; 4.The filling and whitewash project after finishing theinstallation about elevators door frane; 5.Machine room door,ventilation,lighting and the cinder and concreate on the floor after finishing the construction; 6.Piping and wring about the emergency call from machine room to management room; OH ≥3300 Rise H Others: In accrodance with the provising og the building ordinance,it is not allowed to arrange water pipe,electricity pipe, wind pipe in the shaft that are inprespective with the elevator. 5F 4F 3F 300 1F -1F Drawing -2F Drawing No. -3F Pit Approver FT-J 400 -11- Manufacturing no. ≥300 Project name FUJI PRECISION B ∅ ∅ m/s HW 2F 50 Pit Depth ≥300 FU Pit plan Side open Speed Shaft Power 300 JI Pr e Rise=H HD=2000 E Finished floor HW=1200 ∅ ∅ T/sheave car sheave 700 CH=2200(Ceiling net height2050) OH ≥3300 Pr e JI FU 840 io is If there is interference, you need to knock on the wall By others ec 200 Door type Machine 28800 17200 Finished floor P1 150 30 2-200×200 OVERHEAD HEIGHT The hook(15kn,indicate on the hook) Note:Can't break into the elevator shaft 876 400 n HD=2000 CD=1300 587 840 876 726 DOOR OPENING HEIGHT 284 284 78 Hoistway plan D OPH OH / 4 4 CW=800 HW=1200 WALL OPENING WIDTH 600 600 CAR DBG=920 200 ROP TJJ 400 / 0.4 3 600 P2 OP=600 400 kg base station remaining stations lighting 78 load 100 Wx400 H Bottom box Lop 100 Wx500 H ∅50 hole No bottom box 3 ci si on E direction Doorway schematic Facing Hoistway WT DBG=680 re 500 HW=1400 CAR HEIGHT DOOR OPENING WIDTH ci si on wall ROP=800 Overhead plan 600 Shaft wall 100 / CWT DBG DISTANCE BETWEEN COUNTERWEIGHT GUIDE RAILS Finished floor OP=600 HW=1200 F/P/D CAR DBG DISTANCE BETWEEN CAR GUIDE RAILS Lop hole (See table) 150 Shaft Thickness≤50 R2 type CAR INSIDE DEPTH 800 ec is 400 700 OPH=2000 OH ≥3300 JI HD=2000 FU 876 350 246 R2 CAR INSIDE WIDTH CD CH 2 2 210 200 840 R1 Net height=2100 429 500 R1 CW HOISTWAY DEPTH Left and right load beam Door beam Pr 50 ≥350 The hook HOISTWAY WIDTH HD OP 1 600 Controller 1 600 500 HW 200 Schematic diagram of hook 400 Other io n Brick & Concrete 1300 Concrete Technical Requirement JI P Control cabinet size Hoistway Structure 200 Steel belt traction MRL Home elevator A NOTE A