PV Expansion Project
20 Nov 20
Page 1 of 5
7.
PO/Contractor:
QA-QDR-001
QUALITY DAILY REPORT
Area/Location: AEHL - workshop
BONAO
AEHL/267939
Completed Work:
Yes
No
Report No:
QA-MEC - 055
Homologation
Inspection Checklist / Specification /or drawing used:
RESULTS:
Follow-up Required
Satisfactory
Description of the work inspected: The homologation of the welders according to AWS D1.1 It is carried out in
the AEHL workshop in BONAO, the welders were examined by means of the plate specimens in the positions (2G, 3G,
4G). The inspection was under the standards of the determined WPS.
Base metals, welding consumables, and furnace were verified to meet applicable specification requirements.
See photos attached for references and drawings.
Observations/Deficiency:
-----------------------------------------
Marcos De La Cruz
9/9/2021
Report prepared by:
Eng. Manager/QA Lead:
Date / Signature
Date/Signature
Person Notified of deficiency:
Name / Signature
Recommended Corrective Action:
Title
--------------------------------
Corrective Actions implemented and Accepted:
Marcos De La Cruz 9/9/2021
Name/Signature/Date
Eng. Manger-QA Lead/Signature/Date
*P1/5*
PV Expansion Project
20 Nov 20
Page 2 of 5
PHOTOS AND DRAWINGS
WELDING PROCESS.
*P2/5*
PV Expansion Project
20 Nov 20
Page 3 of 5
*P3/5*
PV Expansion Project
20 Nov 20
Page 4 of 5
FINAL TEST RESULT
*P4/5*
PV Expansion Project
20 Nov 20
Page 5 of 5
*P5/5*