BRIDGE SCRAPER UPGRADES Scraper Chain & Rake Car Rail - better perfomance for your reclaimer WE DISCOVER POTENTIAL Want better performance from your reclaimer? FLSmidth has redesigned important elements of the reclaimer system to increase reliability and optimise maintenance, cost and time. 2 New scraper chain for greater reliability The redesigned chain and scraper blades are now even more robust, specifically to increase reliability, reduce maintenance and prolong the lifetime of your entire scraper chain system. The new chain assembly includes important updates that improve its strength and reliability – helping us to achieve our goal of preventing damage and fatigue failures. Why upgrade the scraper chain? Upgrading an existing scraper system with a sturdier chain and blade will increase the system’s lifetime and improve reliability. Your operations benefit from: 1. Chain link 2. Chain roller 3. Hollow section • • • Reduced downtime thanks to simpler, faster maintenance procedures Lower component replacement costs Improved overall performance of your installation Robust features We have doubled the number of guide rollers for the scraper blades to ensure the chain retains its path. This lowers the wear on chain links, chain guides and bearings. To minimise internal stresses and reduce the risk of cracks, the outer chain link has been strengthened thanks to a new design without bends or welds. Instead, it is fabricated from a single steel plate and bolted to the chain links – with the bolts also functioning as hubs for the chain rollers. The chain links are fitted with a hollow section. This improves the chain’s overall stiffness, resulting in a better locking assembly and reducing fatigue failures caused by repetitive impacts. The hardness and hardening depths for the chain roller, chain pin and bushing have also been optimised. Efficient upgrade process An upgrade can be performed quickly and with minimum effort. During the upgrade, most of the reclaimer remains untouched and only the scraper chain, blades, shaft, chain guide and lubrication system need changing. The typical process involves: 1. Scraper chain 2. Scraper blade 3. Guide roller Fast installation Your bridge reclaimer can be installed and back in service typically within 2-3 weeks – which can be achieved within a normal maintenance stop. 1. Removing the existing chain system and guides 2. Installing new shafts and sprocket wheels 3. Re-fitting and re-aligning shafts and chain guide system 4. Assembling new scraper chain and scraper blades 5. Replacing the lubrication system 6. Commissioning the new installation 3 Design features With FLSmidth’s newly designed scraper chain and blades, you can prolong the lifetime of your entire scraper chain system. Scraper blade Scraper chain Drive shaft and hub and sprockit wheel , Chain guide , , Intermediate shaft 4 A rake car rail system that lasts longer The redesigned rake car rail setup increases the lifetime of the system and eases future maintenance procedures. In your future rail replacements, downtime will be reduced. 5 4 2 Upgrading the rail increases the lifetime of the entire rake car rail system, while reducing downtime and maintenance costs. Your operations benefit from: • • • 1 3 1. Rail Why upgrade the rake car rail? 2. Clamps 3. 4. Rubber pad Supporting structure Reducing the wear of rails and wheels Easy alignment of rail system No welding is required for replacement of new rails A rubber pad fitted below the rails ensures constant, full contact with the wheel, providing better support – meaning smoother operation and less system wear. Efficient upgrade process When the new rail system has been installed, your own team can easily perform any necessary future replacements. The system uses stock quality rails, which are normally readily available from your local supplier. In a typical process, your team will: 1. Remove the existing rails by gouging 2. Prepare the top surface of the main girder 3. Weld flat bars to the main girder top surface 4. Mount the rail fixing accessories 5. Align and install the new rails 6. Dismantle rake car wheels and guide rollers 4 2 3 1 Replacing worn-out rails in the future will take no more than approximately one day. Longer life, easier maintenance FLSmidth has redesigned the rake car rail. The new design increases the lifetime of the rake car rail system and eases maintenance procedures. 6 1. Guide rollers 2. Buffer 3. Rail cleaner 4. Rake car boogie Design features FLSmidth’s new rake car rail increases the lifetime of rails, while reducing downtime. Main girder Rake car rail, supporting stucture and rail fixing accessories , , , , , Rake car Rake car wheels, guide rollers and rail cleaner Scraper chain system 7 Project Centre Denmark FLSmidth A/S Vigerslev Allé 77 DK-2500 Valby Copenhagen Tel: +45 3618 1000 Fax: +45 3630 1820 E-mail: [email protected] Project Centre USA FLSmidth Inc. 2040 Avenue C Bethlehem, PA 18017-2188 Tel: +1 610-264-6011 Fax: +1 610-264-6170 E-mail: [email protected] Project Centre India FLSmidth Private Limited FLSmidth House 34, Egatoor, Kelambakkam (Rajiv Gandhi Salai, Chennai) Tamil Nadu – 603 103 Tel: +91-44-4748 1000 Fax: +91-44-2747 0301 E-mail: [email protected] flsmidth.com/linkedin flsmidth.com/twitter flsmidth.com/facebook flsmidth.com/instagram Copyright © 2017 FLSmidth. ALL RIGHTS RESERVED. FLSmidth is a (registered) trademark of FLSmidth. This brochure makes no offers, representations or warranties (express or implied), and information and data contained in this brochure are for general reference only and may change at any time. C 10-17 000-87-ENG flsmidth.com/youtube