PART No: " DESCRIPTION 708101 Serial No. CAT AD30 (C15) TRUCK - DPF REPLACEMENT PARTS SCHEDULE (2X) DXR1-UP SR7004 8N-2729 E81510 E81523 223-1732 262-0630 VB127C 708101 PARTS SCHEDULE 9N-1941 B81536 221-1470 (3X) VB0188 1W-6100 E82365 335-4538 B80862 218-2887 SR7004 8N-2729 (2X) (2X) E78643 237-8279 HDC6250 ***DPF84079 229-8912 DPF78182-I PART NO. DESCRIPTION QTY VB127C E81523 B81536 SR7004 E81510 VB0188 E82365 B80862 E78643 HDC6250 DPF78182-I GSKT77399 VB0400 DPF78182-F B84009 T78722 B83758 V-BAND CLAMP EXHAUST COUPLING RETAINER SEAL RING ENGINE PIPE ASSY. V-BAND CLAMP ENGINE PIPE ASSY. RETAINER EXHAUST COUPLING H/DUTY CLAMP 1 1 3 4 1 1 1 2 1 2 DPF INLET MODULE GASKET SEAL V-BAND CLAMP DPF FILTER MODULE DPF OUTLET BOX 1 2 2 1 1 TAIL PIPE ASSY. DPF BRACKET ASSY. 1 1 ***DPF84079 - DPF GROUP ASSY: GSKT77399 VB0400 237-5451 DPF78182-F GSKT77399 237-5450 B84009 VB0400 B83758 237-5451 HDC6250 229-8912 T78722 COMPANY DRAWING REF. DATE ACQUIRED AD30 PAPER SIZE SHEET No: A3 1 2 CURRENT -.A THIS DRAWING IS THE COPYRIGHT OF MAMMOTH AND MAY NOT BE COPIED IN PART OR FULL WITHOUT THE WRITTEN PERMISSION OF MAMMOTH -.A PXR -.0 REV. PXR By Updated part numbers 9/01/2018 DESCRIPTION 23/02/2017 DATE FABRICATION PROOFING PROJECT NAME REVISION P: +1300 310 340 F: +1300 310 350 E: [email protected] PO Box 1860, Canning Vale DC, 6155 JOB DETAILS 218-2894 STATUS INITIAL/SIGNATURE DRAWN PXR CHECKED LJD APPROVED RD DATE 23/02/2017 DESIGN STATUS MAMMOTH DWG TEMPLATE REV. 1 MAY.14 PART No: DESCRIPTION 210555 Serial No. CAT AD30 (C15) TRUCK - DPF INSULATION PARTS SCHEDULE DXR1-UP 204563 204564 204562 204560 204561 204565 204559 204566 204568 210557 204567 COMPANY DRAWING REF. DATE ACQUIRED AD30 PAPER SIZE SHEET No: A3 2 2 CURRENT -.A THIS DRAWING IS THE COPYRIGHT OF MAMMOTH AND MAY NOT BE COPIED IN PART OR FULL WITHOUT THE WRITTEN PERMISSION OF MAMMOTH - - See Sheet1 - REV. BY DESCRIPTION DATE FABRICATION PROOFING PROJECT NAME REVISION P: +1300 310 340 F: +1300 310 350 E: [email protected] PO Box 1860, Canning Vale DC, 6155 JOB DETAILS 210558 STATUS INITIAL/SIGNATURE DRAWN PXR CHECKED LJD APPROVED RD DATE 23/02/2016 DESIGN STATUS MAMMOTH DWG TEMPLATE REV. 1 MAY.14