Comisión Federal de Electricidad
Tula Branch Gas Pipeline (Hidalgo)
point, usually a central power generation plant.
The branch to Tula will transport natural gas from the Cempoala-Santa Ana system to the Tula
power generation plant in the State of Hidalgo. It will have a capacity of 505 million cubic feet per
day (MCFD).
Project Details:
The project includes the design, engineering, supply, construction,
operation and maintenance. The approximate length of the branch is 17
km and 30-inch diameter.
The estimated project implementation period is 11 months.
Geographic location
State of Hidalgo
Veracruz
Polo
Generador
Tula
Hidalgo
Cempoala
(PGPB)
Hacia
Santa Ana
(PGPB)
Tlaxcala
Puebla
Relevant Facts:
Estimated investment: $50
million U.S. dollars
Capacity:
505 MCFD
Pre-bid Docs Publication:
June 27, 2014
Final Docs Publication:
July 24, 2014
Proposals Filing:
September 23, 2014
Awarding of Contract:
October 9, 2014
COD:
September 2015