The potential of R+D for cost reduction Solutions for Logistic AEE Technical conferences Madrid, December 1-2 | 2010 Juan Ruiz-Jarabo Pacallet Managing director ENERCON GmbH Sucursal en España CONTENTS • ENERCON AND THE LOGISTICS CHALLENGE • FREIGHT BENCHMARKING • COMPETITIVENESS THROUGH R+D 2 Filename: © Copyright ENERCON GmbH. All rights reserved. WHY LOGISTICS? COST REDUCTION FREIGHT BENCHMARKING QUALITY STUDY DAMAGE SUSTAINABILITY REDUCTION 3 Filename: © Copyright ENERCON GmbH. All rights reserved. ENERCON at a GLANCE Fundada en: 1984 Plantas de producción: Aurich (sede), Emden y Magdeburg en Alemania Suecia, Brasil, Turquía, Portugal, Canadá Superficie dedicada a la producción: 463.000 m² Personal dedicado a I+D: alrededor de 180 ingenieros Oficinas comerciales: 16 oficinas internacionales Centros de mantenimiento: más de 160 centros Service Potencia: 22 GW Aerogeneradores instalados a nivel mundial: 17.072 Aerogenerador más potente del mundo: E-126 – 7,5 MW 4 Filename: © Copyright ENERCON GmbH. All rights reserved. A fecha de: 09.2010 EXPORT: GLOBAL SCALE LOGISTICS More than 65% of the production is for export markets 3,000 Potencia instalada en MW 2,500 MW en el extranjero MW en Alemania 2,000 1,500 1,000 500 19 91 19 92 19 93 19 94 19 95 19 96 19 97 19 98 19 99 20 00 20 01 20 02 20 03 20 04 20 05 20 06 20 07 20 08 20 09 0 5 Filename: © Copyright ENERCON GmbH. All rights reserved. GLOBAL MARKET vs CENTRALIZED PRODUCTION 6 Filename: © Copyright ENERCON GmbH. All rights reserved. PRODUCTION PLANTS • BLADES, 8 factories • GENERATOR, 5 factories • ASSEMBLYING, 5 factories • ELECTRICAL COMPONENTS, 4 factories • TOWERS, 7 factories • FOUNDRY, 1 factor 7 Filename: © Copyright ENERCON GmbH. All rights reserved. PRODUCTION PLANTS • BLADES, 8 factories • GENERATOR, 5 factories • ASSEMBLYING, 5 factories • ELECTRICAL COMPONENTS, 4 factories • TOWERS, 7 factories • FOUNDRY, 1 factor 8 Filename: © Copyright ENERCON GmbH. All rights reserved. CONTENTS • ENERCON AND THE LOGISTICS CHALLENGE • FREIGHT BENCHMARKING • COMPETITIVENESS THROUGH R+D 9 Filename: © Copyright ENERCON GmbH. All rights reserved. FREIGHT BENCHMARKING 10 Filename: © Copyright ENERCON GmbH. All rights reserved. ENERCON’s PHILOSOPHY • Full integration of the whole supply chain (In-house spedition) • Great expertise in all transport modes • Purchase and use of our owns transport modes •Long-term partnership with our providers © Michael Garri – by bahnbilder.warumdenn.net • 9 logistic hubs in 7 countries are monitored by 100 qualified staff 11 Filename: © Copyright ENERCON GmbH. All rights reserved. SUPPLY CHAIN MANAGEMENT SYSTEM • Planning, organisation and real-time monitoring • Drawing of logistic-network • Early identification of narrow access • 97% availability EPK: spare parts replacement • Damage rate: 0,3 % • ENERCON‘s Quality System 12 Filename: © Copyright ENERCON GmbH. All rights reserved. BENCHMARKING STUDY: SHORT – MEDIUM DISTANCE equivalent CO2 tons 10.000 5.000 0 Train Inland water vessel HGV 13 Filename: © Copyright ENERCON GmbH. All rights reserved. CONTENTS • ENERCON AND THE LOGISTICS CHALLENGE • FREIGHT BENCHMARKING • COMPETITIVENESS THROUGH R+D 14 Filename: © Copyright ENERCON GmbH. All rights reserved. 1. BEST OPTION: ENERCON RAILWAY LOCOMOTIVES Freya Fresena Two-way vehicle Vossloh G1000 Filename: Siemens ER20 © Copyright ENERCON GmbH. All rights reserved. 15 CASE STUDY: CONNECTING FACTORIES WITH HARBOUR 1 Foundry GZO Georgsheil 2 3 Factory Aurich Logistic center Emden 16 Filename: © Copyright ENERCON GmbH. All rights reserved. NETWORK OF THE ENERCON RAILWAY Hub Aurich/Emden Schwerin Bremerhaven Hamburg Bremen Meppen Hub East MD Hub West Geseke HM Sprotta Nachterstedt/ Dessau Hoym Leipzig Aalen Riesa Siegen Total tonnage ca. 1.000.000t/year Korb Blaubeuren Hub South Ummendorf Herberttingen Sachsenheim Italien Filename: © Copyright ENERCON GmbH. All rights reserved. 17 2. EFFICIENCY: E-SHIP 1 Designed for the transport of ENERCON cargo with maximum energy efficiency Filename: © Copyright ENERCON GmbH. All rights reserved. 18 E-SHIP 1: FEATURES Length: Width: Hold depth: 130 m 22.5 m 9.3 m Speed: 17,5 kn (32 km/h) Load capacity: 9700 tdw Categorisation: Germanischer Lloyd 100 A5 E3 The E-Ship 1 is the most modern cargo ship in the world today! 19 Filename: © Copyright ENERCON GmbH. All rights reserved. E-SHIP 1: REACHING ENERCON SUSTANIBILITY STANDARD With E-Ship 1 transport on sea is very energy efficient and therefore extremely environmental friendly…. …like its cargo! 20 Filename: © Copyright ENERCON GmbH. All rights reserved. Thanks for your attention ! Edición: ENERCON GmbH Sucursal en España Calle Fernando el Santo 15 ▪ 28010 Madrid ▪ España Ronda de Auguste y Louis Lumière 23, Edificio 21 A, Parque Tecnológico ▪ 46980 Paterna (Valencia) ▪ España www.enercon.de Copyright: © ENERCON GmbH. Sin nuestra expresa autorización, queda terminantemente prohibida la reproducción total o parcial de este documento, así como su uso indebido y/o su exhibición o comunicación a terceros. De los infractores se exigirá el correspondiente resarcimiento de daños y perjuicios. Quedan reservados todos los derechos inherentes, en especial los de patentes, de modelos registrados y estéticos. Derecho de realización de cambios: La empresa ENERCON GmbH se reserva el derecho a modificar este documento y el contenido descrito en el mismo en cualquier momento y sin previo aviso, 21 en especial en lo que se refiere a la mejora y ampliación del mismo Filename: © Copyright ENERCON GmbH. All rights reserved.