The potential of R+D for cost reduction

Anuncio
The potential of R+D for cost reduction
Solutions for Logistic
AEE Technical conferences
Madrid, December 1-2 | 2010
Juan Ruiz-Jarabo Pacallet
Managing director
ENERCON GmbH Sucursal en España
CONTENTS
•
ENERCON AND THE LOGISTICS CHALLENGE
•
FREIGHT BENCHMARKING
•
COMPETITIVENESS THROUGH R+D
2
Filename:
© Copyright ENERCON GmbH. All rights reserved.
WHY LOGISTICS?
COST
REDUCTION
FREIGHT
BENCHMARKING
QUALITY
STUDY
DAMAGE
SUSTAINABILITY
REDUCTION
3
Filename:
© Copyright ENERCON GmbH. All rights reserved.
ENERCON at a GLANCE
Fundada en:
1984
Plantas de producción:
Aurich (sede), Emden y Magdeburg en Alemania
Suecia, Brasil, Turquía, Portugal, Canadá
Superficie dedicada a la producción:
463.000 m²
Personal dedicado a I+D:
alrededor de 180 ingenieros
Oficinas comerciales:
16 oficinas internacionales
Centros de mantenimiento:
más de 160 centros Service
Potencia:
22 GW
Aerogeneradores instalados a nivel mundial:
17.072
Aerogenerador más potente del mundo:
E-126 – 7,5 MW
4
Filename:
© Copyright ENERCON GmbH. All rights reserved.
A fecha de: 09.2010
EXPORT: GLOBAL SCALE LOGISTICS
More than 65% of the production is for export markets
3,000
Potencia instalada en MW
2,500
MW en el extranjero
MW en Alemania
2,000
1,500
1,000
500
19
91
19
92
19
93
19
94
19
95
19
96
19
97
19
98
19
99
20
00
20
01
20
02
20
03
20
04
20
05
20
06
20
07
20
08
20
09
0
5
Filename:
© Copyright ENERCON GmbH. All rights reserved.
GLOBAL MARKET vs CENTRALIZED PRODUCTION
6
Filename:
© Copyright ENERCON GmbH. All rights reserved.
PRODUCTION PLANTS
•
BLADES, 8 factories
•
GENERATOR, 5 factories
•
ASSEMBLYING, 5 factories
•
ELECTRICAL COMPONENTS, 4 factories
•
TOWERS, 7 factories
•
FOUNDRY, 1 factor
7
Filename:
© Copyright ENERCON GmbH. All rights reserved.
PRODUCTION PLANTS
•
BLADES, 8 factories
•
GENERATOR, 5 factories
•
ASSEMBLYING, 5 factories
•
ELECTRICAL COMPONENTS, 4 factories
•
TOWERS, 7 factories
•
FOUNDRY, 1 factor
8
Filename:
© Copyright ENERCON GmbH. All rights reserved.
CONTENTS
•
ENERCON AND THE LOGISTICS CHALLENGE
•
FREIGHT BENCHMARKING
•
COMPETITIVENESS THROUGH R+D
9
Filename:
© Copyright ENERCON GmbH. All rights reserved.
FREIGHT BENCHMARKING
10
Filename:
© Copyright ENERCON GmbH. All rights reserved.
ENERCON’s PHILOSOPHY
• Full integration of the whole supply chain (In-house spedition)
• Great expertise in all transport modes
• Purchase and use of our owns transport modes
•Long-term partnership with our providers
© Michael Garri – by bahnbilder.warumdenn.net
• 9 logistic hubs in 7 countries are monitored by 100 qualified staff
11
Filename:
© Copyright ENERCON GmbH. All rights reserved.
SUPPLY CHAIN MANAGEMENT SYSTEM
• Planning, organisation and
real-time monitoring
• Drawing of logistic-network
• Early identification of narrow access
• 97% availability EPK:
spare parts replacement
• Damage rate: 0,3 %
• ENERCON‘s Quality System
12
Filename:
© Copyright ENERCON GmbH. All rights reserved.
BENCHMARKING STUDY: SHORT – MEDIUM DISTANCE
equivalent
CO2 tons
10.000
5.000
0
Train
Inland water vessel
HGV
13
Filename:
© Copyright ENERCON GmbH. All rights reserved.
CONTENTS
•
ENERCON AND THE LOGISTICS CHALLENGE
•
FREIGHT BENCHMARKING
•
COMPETITIVENESS THROUGH R+D
14
Filename:
© Copyright ENERCON GmbH. All rights reserved.
1. BEST OPTION: ENERCON RAILWAY LOCOMOTIVES
Freya Fresena
Two-way vehicle
Vossloh G1000
Filename:
Siemens ER20
© Copyright ENERCON GmbH. All rights reserved.
15
CASE STUDY: CONNECTING FACTORIES WITH HARBOUR
1
Foundry GZO Georgsheil
2
3
Factory Aurich
Logistic center Emden
16
Filename:
© Copyright ENERCON GmbH. All rights reserved.
NETWORK OF THE ENERCON RAILWAY
Hub
Aurich/Emden
Schwerin
Bremerhaven
Hamburg
Bremen
Meppen
Hub East
MD
Hub
West
Geseke
HM
Sprotta
Nachterstedt/ Dessau
Hoym
Leipzig
Aalen
Riesa
Siegen
Total tonnage
ca. 1.000.000t/year
Korb
Blaubeuren
Hub South
Ummendorf
Herberttingen
Sachsenheim
Italien
Filename:
© Copyright ENERCON GmbH. All rights reserved.
17
2. EFFICIENCY: E-SHIP 1
Designed for the transport of ENERCON cargo with maximum energy efficiency
Filename:
© Copyright ENERCON GmbH. All rights reserved.
18
E-SHIP 1: FEATURES
Length:
Width:
Hold depth:
130 m
22.5 m
9.3 m
Speed:
17,5 kn (32 km/h)
Load capacity:
9700 tdw
Categorisation: Germanischer Lloyd 100 A5 E3
The E-Ship 1 is the most modern
cargo ship in the world today!
19
Filename:
© Copyright ENERCON GmbH. All rights reserved.
E-SHIP 1: REACHING ENERCON SUSTANIBILITY STANDARD
With E-Ship 1 transport on sea is very energy efficient and therefore extremely
environmental friendly….
…like its cargo!
20
Filename:
© Copyright ENERCON GmbH. All rights reserved.
Thanks for your attention !
Edición:
ENERCON GmbH Sucursal en España
Calle Fernando el Santo 15 ▪ 28010 Madrid ▪ España
Ronda de Auguste y Louis Lumière 23, Edificio 21 A, Parque Tecnológico ▪ 46980 Paterna (Valencia) ▪ España
www.enercon.de
Copyright:
© ENERCON GmbH. Sin nuestra expresa autorización, queda terminantemente prohibida la reproducción total o parcial de este documento, así como su uso
indebido y/o su exhibición o comunicación a terceros. De los infractores se exigirá el correspondiente resarcimiento de daños y perjuicios. Quedan reservados
todos los derechos inherentes, en especial los de patentes, de modelos registrados y estéticos.
Derecho de realización de cambios:
La empresa ENERCON GmbH se reserva el derecho a modificar este documento y el contenido descrito en el mismo en cualquier momento y sin previo aviso,
21
en especial en lo que se refiere a la mejora y ampliación del mismo
Filename:
© Copyright ENERCON GmbH. All rights reserved.