Welcome to the Public Scoping Meeting! ¡Bienvenidos a la Reunión de Alcance para el Público! We welcome you to the supplemental public scoping meeting for the ACEforward program This is an Open House with displays on ACE, ACEforward planning, and the Environmental Review Process. Please sign in, visit the displays, and feel free to ask questions. Staff is available at every “display station” for conversation about the different topics of the ACEforward program. Thank you for coming! Bienvenidos a la Reunión de Alcance para el Público para el programma ACEforward. Esta Reunión tendrá estaciones con diferentes temas sobre el ACE, planificación de ACEforward y el proceso de Evaluación del medio ambiente. Por favor registrase, visite las estaciones, y siéntase cómodo haciendo preguntas. Personal está disponible en cada estación para hablar sobre los diferentes temas del ACEforward. ¡Gracias por venir! Everything in life depends on a good connection. May_2016_ACE_Forward_Boards_HC YB.indd 1 www.acerail.com 5/23/2016 9:55:06 AM Vision For The Future Goals/ Objectives for 2019 and 2023 1.Improve the existing ACE service between Stockton and San Jose with •added frequencies, •reduced travel time, and •improved service reliability. Current , 2016 2.Extend service to additional Central Valley communities – downtown Modesto in the near term and downtown Merced subsequently 3.Integrate ACE into a unified northern California Rail service extending to and connecting with the high-speed rail system 2019 2023 4.Provide connectivity and accessibility to Oakland and Oakland International Airport; maximize intermodal connections with other rail services including BART 5.Enhance the quality of life in the San Joaquin Valley and Bay Area by providing an alternative to the automobile to relieve congestion along I-580, I-680, I-205 and SR-99 and reduce greenhouse gases Planning Principles • Make improvements to existing route shared with freight traffic to provide cost-effective solutions to enhance and expand service • Identify a menu of improvements and phase investments over time to allow for continual improvement • Develop new dedicated passenger corridor and/or track where feasible and cost-effective • Support emerging smart communities strategies in the San Joaquin Valley by developing downtown stations • Maximize opportunities for connectivity to rail and other public transport modes May_2016_ACE_Forward_Boards_HC YB.indd 2 5/23/2016 9:55:09 AM Schedule Activity Schedule ALTERNATIVES DESCRIPTION MAY 2016 IN-PROGRESS DESIGN AUGUST 2015 - MARCH 2016 FULL PACKAGE DESIGN MAY 2016 ADMINISTRATIVE DRAFT ENVIRONMENTAL IMPACT REPORT (EIR) JUNE 2016 DRAFT EIR + PUBLIC REVIEW LATE SUMMER/FALL 2016 FINAL EIR JUNE 2017 A SEPARATE ENVIRONMENTAL IMPACT STATEMENT (EIS) UNDER THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) IS BEING PREPARED BY THE FEDERAL RAIL ADMINISTRATION (FRA), EXPECTED 2017 May_2016_ACE_Forward_Boards_HC YB.indd 3 5/23/2016 9:55:12 AM ACE Today Fun ACE facts • • • • • • Current Service Area 4 round trip trains serving from Stockton to San Jose 4 trains in AM Westbound, 4 in PM Eastbound safely transports over a million passengers per year current operations are projected to reduce vehicle miles traveled by 43.5 million miles in 2015 current operations are projected to reduce CO2 by 24 million pounds in 2015 Equipment and Amenities • • One locomotive per 4-8 coaches • • • • Bike cars with 14 bike stalls Top speed 79 mph Tables with power outlets Wheelchair accessible Wi-Fi service Current , 2016 Diesel Locomotive Who pays for ACE? 2014/2015 Funding Sources ACE versus Car • Relax or work in 2.67% comfort on ACE versus sit in traffic 14.04% • Stress-free commuting From/To Lathrop Stockton 0:24 Pleasanton 1:13 Great America San Jose 1:58 2:12 ACE Stockton Lathrop Car (Peak) ACE Lathrop Pleasanton Car (Peak) ACE Great America Pleasanton Car (Peak) 2.67% Great America 14.04% 0:20 1:35 2:10 2:05 16.72% 4.37% SANTA CLARA VTA 1:34 1:48 1:20 1:55 1:50 2.67% 0:39 0:53 4.37% SAN JOAQUIN COUNTY MEASURE K ACE Service 2014/2015 Funding Sources 14.04% 0:45 0:14 0:20 16.72% CAR (Peak) = congested drive times are typical trips made in the peak 15-minute period of a midweek commute. However, congestion impacts can cause wide variability, often resulting in greater travel times. 50.16% 12.04% 16.72% 50.16% FARE REVENUES ACTC Measure B Loc $2,100,000 Local Transportaon Fare Revenues 50.16% $7,500,000 $653,529 San Joaquin County Measure K 12.04% $1,800,000 Santa Clara VTA Local 16.72% $2,500,000 Total $14,953 Fare Revenues 50.16% $7,500,000 ACTC Measure B Local 14.04% $2,100,000 San Joaquin County Measure K 12.04% $1,800,000 STA Funds 2.67% $400,000 Santa Clara VTA Local 16.72% $2,500,000 Local Transportaon Funds 4.37% $653,529 50.16% 0:50 Santa Clara VTA Loca $2,500,000 ACE Service 2014/2015 Funding Sources STA Funds 2.67% $40 12.04% 0:55 San Joaquin County M 12.04% $1,800,000 ACTC MEASURE B LOCAL passengers Car (Peak) Total funds: $14,953,529 Fare Revenues 50.16 • Socialize with fellow ACE 4.37% ACE Service 2014/2015 Funding ACTC Measure B Local 14.04% $2,100,000 STA Funds 2.67% $400,000 Total $14,953,529 Local Transportaon Funds 4.37% $653,529 May_2016_ACE_Forward_Boards_HC YB.indd 4 12.04% Total $14,953,529 5/23/2016 9:55:21 AM ACEforward More Reliable, Safer, Faster, and Nicer • • • • Safety improvements such as separate grade crossings, will translate into improved travel time More trains and more stations provide better transit options New trains and a better network: new DMU trains may be used as shuttles to connect BART and additional areas to ACE New equipment’s performance would not be affected by train length Potential Diesel Multiple Unit (DMU) Expanding ACE service will keep cars from clogging the increasingly burdened roadways and will help keep our skies blue: • • • • Upping ACE service to 6 round-trip trains translates to a 50% increase in capacity which is expected to be serving 2.2 million riders a year by 2020 2020: approx. 50 million pounds CO2 not emitted 10 round-trip trains to serve ACE = 150% increase in capacity expected to be serving 4.4 – 5.9 million riders a year by 2025 2023: approx. 111 – 233 million pounds CO2 not emitted ACEforward projected Riding Times ACEforward ACE From/ To Merced Turlock 0:22 Modesto 0:35 0:13 Stockton 1:21 0:59 0:46 Lathrop/ Manteca 1:02 0:40 Pleasanton 1:50 Great America San Jose Turlock Modesto ACEforward ACE ACEforward Lathrop/ Manteca Lathrop/ Manteca Stockton Stockton 0:27 0:19 0:19 1:28 1:15 1:13 1:07 0:54 0:48 2:23 2:01 1:48 1:53 1:40 1:34 2:42 2:20 2:07 2:12 1:59 1:53 ACE ACEforward Pleasanton Pleasanton 1:21 0:40 0:33 1:40 0:59 0:52 ACE ACEforward Great America Great America 0:19 0:12 ACEforward times in italics are estimates rounded to the nearest minute, assuming a 10% reduction in travel times achieved by improvements in applicable portions of the corridor. The extension to Modesto and Merced assumes a top travel speed of 79 mph on new track within the existing UPRR Fresno Subdivision right-of-way. Where allowed by the UPRR, potential operation at speeds up to 110 mph could be achieved in the long term with additional travel time savings. May_2016_ACE_Forward_Boards_HC YB.indd 5 5/23/2016 9:55:22 AM Improvement Examples Siding extensions accommodate longer freight trains, allowing ACE to pass by on the main track (such as on the right) without delay ACEforward improvements will address pinch points such as this one in the Alviso wetlands, where tracks are shared with two Amtrak lines and freight operations With sidings and double tracking, ACE can pass other trains – keeping ACE on time and allowing for an expanded schedule Station improvements will expand capacity and enhance passenger amenities Trackwork modifications or new alignments are proposed to replace track sections with tight curves that slow ACE down May_2016_ACE_Forward_Boards_HC YB.indd 6 Grade separations such as this one in Livermore will allow ACE to operate at faster speeds and remove delays to crossing traffic, while offering safety and noise reduction benefits 5/23/2016 9:55:29 AM Comment Station Your input is important to us! Please provide your scoping comments • On the ACEforward program via comment card or via [email protected]. Please Comment • The comment period is from May 9, 2016 until June 9, 2016. If received by June 9, 2016, your comments will be reviewed and incorporated, as appropriate, into the planning process. Thank you for coming! ¡Su opinión es muy importante para nosotros! Por favor proporciona sus comentarios sobre el Anteproyecto del programme ACEforward por medio de una tarjeta de comento o por [email protected]. El periodo comentario es del 9 de mayo hasta el 9 de junio del 2016. Por favor haga un Comentario. Si se reciben los comentarios el 9 de junio del 2016, se revisaran y serán integrados, según apropiado, en el planificación de ACEforward y el proceso de Evaluación del medio ambiente. Everything in life depends on a good connection. May_2016_ACE_Forward_Boards_HC YB.indd 7 ¡Gracias por venir! www.acerail.com 5/23/2016 9:55:31 AM