Americold CONSTRUCTION GUIDELINE SPECIFICATIONS V39 – 11-06-2024 Page |1 Revisions No. Description V13 Add Hallowell double tier lockers & sub-metering system to lighting, battery charging, offices and maintenance shop V14 Add Guard house drawing set V15 Update IT room, Roof Hatch, Cabinet and Corian Color and Lockers V16 Update IT room cut sheets in section 15.1D and wiremold raceway for office V17 Update water fountain in section 8.1F for office V18 Add Surge/voltage and phasing issues protection V19 Update IT room requirements V20 Add Building Signage V21 Add clarifying language around emergency generator and portable generator docking station (with Kirk Key access) V22 Add specification on Truck Stop and men’s bathroom, Safety, Humidity Sensor, and Network Cabling Standards. Removed section on Vestibules. V23 Updated the date on V22 V24 Add backup power on page 53 V25 Add On-Site Security Guards on page 14 V26 Add details on steel, floor, backup generator, window, flag pole, and man doors. V27 Update on Bollards on chapter 5.4 Date 5/29/2018 V28 V29 V30 V31 V32 V33 V34 V35 V36 V37 10/01/2020 01/14/2021 02/01/2021 02/04/2021 03/08/2021 03/23/2021 04/01/2021 02/08/2022 5/3/2022 3/24/2023 PBhandari PBhandari PBhandari PBhandari PBhandari PBhandari PBhandari PBhandari PBhandari NFletcher 8/31/2023 MDavies Update on Chapter 7.5 information on Floor Loop Updated 2.1 C, 5.1 D 2, 7.6 A and 8.2 G. Updated 1.4 Building Signage, 7.5.B, and 15.1 MDF Room Added on 2.4 Site Work – Miscellaneous Edited 6.3. e Membrane Roofing Added Pallet racking Spec in section 5.1 Added specification on Electrical conduits in Section 14.6.c Update 6.3. f Membrane Roofing Added Pipe labeling color code chart in Section 8.2 Projection signage removed. Door height notes updated to reference individual project documents. Truck stop and fencing clarified. NH3/Fire/Weather alarms clarified in section 11.1 V38 Chap 1 - Added AMC site trailer requirements, Chap 2 – clarified AC layout space, clarified guardhouse concrete guarding and overhead traffic lighting, clarified fence man gates and truck traffic gates, Chap 3 – added slab settlement criteria, clarified truck wheel curb stops, added slab flatness testing requirement, Chap 4 – added scrubber dump walls criteria, Chap 6 – clarified underfloor heat and insulation at freezer /dock wall, Chap 7 – clarified truck dock door motors, height and exterior numbering, clarify thermal window By SZhang 7/5/2018 SZhang 10/23/2018 SZhang 2/8/2019 SZhang 2/27/2019 4/22/2019 4/23/2019 7/1/2019 8/27/2019 SZhang SZhang SZhang SZhang KHarr 1/10/2020 PBhandari 01/16/2020 2/13/2020 04/06/2020 05/06/2020 PBhandari SZhang PBhandari PBhandari 06/25/2020 PBhandari Page |2 criteria, Chap 11 – clarify fire tank sizing to be without refill consideration, clarify GC FP engineer to size fire pumps, galvanized FP pipe okay, Chap 14 – confirm redundant fire pump, clarify underfloor heat, V39 Numerous edits throughout 11/6/2024 BOgunderu Page |3 CONSTRUCTION GUIDELINE SPECIFICATIONS Introduction Although these Construction Guidelines are not intended to be exhaustive or comprehensive specifications for the construction of the Project, they are nevertheless intended to convey the minimum level of design, construction and quality expected by AMERICOLD. In addition, while these guidelines cover a wide range of the specifications, systems, components and equipment, etc. found in the numerous projects that AMERICOLD regularly undertakes, AMERICOLD has made an effort to eliminate items that do not specifically apply to the Project. Each bidder shall carefully and thoroughly review this document and request information / clarification if any errors, omissions or superfluous items are discovered. AMERICOLD will provide a written response to all enquiries. Page |4 Table of Contents CONSTRUCTION GUIDELINE SPECIFICATIONS ........................................................................................ 4 Chapter 1 GENERAL CONDITIONS .............................................................................................8 1.1 Drawings................................................................................................................................. 9 1.2 Project Close-Out ................................................................................................................. 10 1.3 Construction Type ................................................................................................................ 10 1.3.1 Loading Docks - Truck and Rail ................................................................................... 10 1.3.2 Freezers ...................................................................................................................... 11 1.4 Building Signage ................................................................................................................... 11 Chapter 2 SITEWORK.............................................................................................................. 12 2.1 Concrete Paving ................................................................................................................... 12 2.2 Asphalt Paving – Heavy Duty (to be confirmed with Geo-Technical Report) ...................... 12 2.3 Asphalt Paving – Light Duty (to be confirmed with Geo-Technical Report) ........................ 13 2.4 Site work - Miscellaneous .................................................................................................... 13 2.5 Site Security- On-Site Security Guards ................................................................................. 14 2.6 Site Security - Guardshack.................................................................................................... 14 2.7 Site Security - Fencing .......................................................................................................... 17 2.8 Landscaping .......................................................................................................................... 17 Chapter 3 CONCRETE.............................................................................................................. 18 3.1 Freezer Floor Slabs ............................................................................................................... 18 3.2 Freezer Sub-Floors ............................................................................................................... 18 3.3 Truck and Rail Dock Floor Slabs ........................................................................................... 18 3.4 Locker Room Floor Slabs ...................................................................................................... 19 3.5 Exterior Electrical Component Slabs .................................................................................... 19 3.6 Floor Slabs – Miscellaneous ................................................................................................. 19 3.7 Concrete Curbs ..................................................................................................................... 20 3.8 Concrete – Miscellaneous .................................................................................................... 21 Chapter 4 MASONRY .............................................................................................................. 22 Page |5 4.1 Masonry – General ............................................................................................................... 22 Chapter 5 METALS.................................................................................................................. 23 5.1 Structural Steel ..................................................................................................................... 23 5.2 Steel Joists ............................................................................................................................ 24 5.3 Metal Deck ........................................................................................................................... 24 5.4 Metals - Miscellaneous ........................................................................................................ 25 Chapter 6 THERMAL AND MOISTURE PROTECTION ................................................................. 30 6.1 Insulated Metal Wall Panels................................................................................................. 30 6.2 Floor and Roof Insulation ..................................................................................................... 31 6.3 Membrane Roofing .............................................................................................................. 31 6.4 Miscellaneous ...................................................................................................................... 32 Chapter 7 DOORS ................................................................................................................... 32 7.1 Overhead Doors - General ................................................................................................... 32 7.2 Overhead Doors – Truck Docks ............................................................................................ 32 7.3 Overhead Doors - Rail Docks ................................................................................................ 33 7.4 Overhead Doors - Miscellaneous ......................................................................................... 33 7.5 High-Speed Freezer and Cooler Doors ................................................................................. 33 7.6 Personnel Doors ................................................................................................................... 36 Chapter 8 FINISHES ................................................................................................................ 38 8.1 Office / Welfare Area Finishes - General.............................................................................. 38 8.2 Paint – General ..................................................................................................................... 42 Chapter 9 SPECIALTIES ........................................................................................................... 44 9.1 Specialties – General ............................................................................................................ 44 Chapter 10 EQUIPMENT ........................................................................................................... 45 10.1 Equipment – General ........................................................................................................... 45 Chapter 11 FIRE PROTECTION ................................................................................................... 46 11.1 Fire Protection – General ..................................................................................................... 46 Chapter 12 PLUMBING ............................................................................................................. 48 12.1 Plumbing – General .............................................................................................................. 48 Page |6 Chapter 13 HVAC ..................................................................................................................... 50 13.1 Office / Welfare Areas.......................................................................................................... 50 13.2 Battery Rooms...................................................................................................................... 50 13.3 Engine Rooms ....................................................................................................................... 51 13.4 Humidity Sensor ................................................................................................................... 51 Chapter 14 ELECTRICAL ............................................................................................................ 51 14.1 Electrical Service .................................................................................................................. 51 14.2 Lighting ................................................................................................................................. 53 14.3 Power, Control and Signal Wiring ........................................................................................ 56 14.4 Dock Levelers and Dock Doors ............................................................................................. 58 14.5 Underfloor Heat System....................................................................................................... 58 14.6 Electrical - General ............................................................................................................... 59 Chapter 15 Information Technolgy (MDF/IDF and station Construction) ...... Ошибка! Закладка не определена. 15.1 Server/Main Distribution Frame (MDF) Room Construction ............. Ошибка! Закладка не определена. 15.2 Office/Welfare Area Construction ...............................Ошибка! Закладка не определена. 15.3 Warehouse/Dock Components ....................................Ошибка! Закладка не определена. 15.4 Hardware......................................................................Ошибка! Закладка не определена. Chapter 16 Security Systems .................................................................................................... 73 Chapter 17 Low Oxygen Fire Prevention System ....................................................................... 73 17.1 Room Construction .............................................................................................................. 73 Chapter 18 Network Cabling Standards .................................................................................... 74 18.1 General Guidelines ............................................................................................................... 74 18.2 Station Cabling ..................................................................................................................... 75 18.3 IDF/MDF Cabling .................................................................................................................. 76 Chapter 19 Safety .................................................................................................................... 76 19.1 Contractor Safety ................................................................................................................. 76 19.2 Hot Work Safety ................................................................................................................... 77 19.3 Visitor’s Safety...................................................................................................................... 77 Page |7 Page |8 Chapter 1 GENERAL CONDITIONS This guide is not an attempt by AMERICOLD to dictate an improper design, but only to convey to the General Contractor what is expected in the "end product". Should the General Contractor consider any specifications to be unsafe or inadequate for providing satisfactory results that they are unable to guarantee, it shall be their responsibility to bring this to the attention of AMERICOLD in writing. A. The General Contractor shall ensure that all work performed will be erected true, plumb and square, and exhibits the best standards of workmanship. B. The General Contractor shall be responsible for providing adequate ventilation and applying proper controls to prevent unsafe levels of carbon monoxide from building up in the workspaces. (Note: AMERICOLD will assist in the monitoring of these levels.) C. The General Contractor shall, at a point of approximately ten (10) weeks into the project, provide AMERICOLD with a listing of all Sub-Contractors and major suppliers. At the conclusion of the project, an updated “complete” listing is to be provided, which includes company name, contact person, address, phone number, and trade. D. The General Contractor is required to supply each Sub-Contractor with a complete copy of the AMERICOLD Construction Specifications and the appropriate project drawings. After each revision, updated drawings must be supplied to each Sub-Contractor. E. Location of all job and storage trailers shall be approved by the AMERICOLD Construction Manager. Trailers shall be located so they do not expose AMERICOLD assets to a fire risk from a burning trailer, nor interfere with AMERICOLD dock operations once the facility opens. F. The cost of performance bonds for the General Contractor and all Sub-Contractors must be included and itemized project quotes. G. The General contractor and all Sub-Contractors shall have Insurance Coverage for loss or damage of their tools and equipment as detailed in the AMERICOLD Construction Contract, a copy of which is enclosed in this package. H. The General Contractor must promptly bring all potential Change Orders to the attention of the AMERICOLD Construction Manager by completing the Change Order Form, exhibited in the Construction Contract, and obtain approval in writing before any funds are committed. AMERICOLD will not be liable for any cost related to any change without approval at the time of the change. I. The General Contractor shall include all quality control testing including geotechnical investigation and report, concrete testing, steel inspections, California Bearing Ratio Test (CBR), etc. A copy of all test reports shall be sent directly from the testing agency to the AMERICOLD Construction Manager as they are received. Page |9 J. The General Contractor and Refrigeration Contractor shall supervise the installation of the refrigeration system piping to ensure that all pipe penetrations through the walls are performed in accordance with AMERICOLD approved standards (Refer to Thermal and Moisture Protection, Section 7). K. AMERICOLD may choose the Refrigeration Contractor to do the job. This contractor will be contracted by the General Contractor and any applicable fee shall be included in the bid. The General Contractor will be responsible for including any items not covered in the Refrigeration Contractors bid. L. General Contractor is to provide the AMERICOLD Construction Manager with manufacturing information (Cut sheets) for all doors, mechanical, plumbing, and electrical equipment. M. There shall be regularly scheduled sub-contractor meetings held every two to three weeks depending upon the condition of the schedule. N. The General Contractor shall employ a full time, on-site Project Superintendent who will remain on the job site until the Project including punch list is totally complete. O. Project will be LEED accredited. P. General Contractor to provide AMERICOLD with trailer, bathroom facilities and conference room specifications. Q. General Contractor shall follow Americold Safety Guideline. R. The general contractor shall provide Americold with one 12-foot x 40-foot size trailer with two sets of stairs and internal unisex bathroom facilities. The trailer shall be connected to electrical power with overhead lighting, comfort heating, air conditioning and parking for 6 cars for the duration of construction. All internal furnishings and equipment shall be provided by Americold. 1.1 Drawings A. All Construction Drawings shall be stamped by a Professional Engineer licensed in the same State as the Project location. All fire protection, roof, insulation, electrical, and underground utilities elements shall be reviewed by Global Risk Consultants (GRC), and shall be approved by AMERICOLD before commencement of any work. B. General contractor must use Procore or similar software for document management. C. The Construction Drawing package shall include a cover sheet that includes, as a minimum, the following Project information: Project Name, Description, Location and Information Index of Drawings and Sheet Description All Applicable Building Codes and Ordinances Construction Type and Occupancy Classification List of Building Designer and all Contractors and Sub-Contractors D. Drawing shall be developed using BIM technology P a g e | 10 E. Drawing becomes property of AMERICOLD to use at their sole discretion. 1.2 Project Close-Out A. At the completion of the Project, three (3) full-size sets of As-Built drawings, plus three (3) compact disks or USB flash drives with all 2D and BIM drawings saved in AutoCAD and PDF format shall be provided to AMERICOLD. The AutoCAD drawings shall be saved in .dwg format. The drawings to be provided shall include all civil, architectural, structural, mechanical, electrical, plumbing, refrigeration and fire protection drawings, etc. Note: AMERICOLD regards As-Built drawings as drawings in which all changes have been properly updated and incorporated; clouded areas on the drawings are not acceptable. B. The As-Built drawings shall accurately depict and dimension the location of all underground utilities, such as underfloor electrical, water, sewer, storm drain, sprinkler, telephone and gas, etc. C. The General Contractor shall provide one (1) paper copy of the Owner’s Manual to the facility which will include service information on all equipment installed within the facility, all materials used on site and all warranty information. D. The General Contractor shall provide AMERICOLD with three (3) USB Flash Drives which contain a copy of the Owner’s Manual saved in PDF format. E. AMERICOLD's retainage policy is to retain 10% of work completed and 10% of materials stored on site. At a point near substantial completion of the project, a calculated amount will be held until the following items are 100% complete: Punch list As-Built drawings Owner's Manuals Final Certificate of Occupancy Roof Warranty Final Waivers of Lien Owners Acceptance Form F. The General Contractor shall, at the completion of the Project, provide AMERICOLD with an ALTA/ASCM Land Title Survey. 1.3 Construction Type 1.3.1 Loading Docks - Truck and Rail A. Truck dock exterior walls shall be constructed of UL Listed and / or FM approved pre-finished insulated metal panels (the wall manufacturer shall be approved by AMERICOLD). Cut sheets must be provided. Minimum R-Value should be 30 for 4” panels and 38 for 5” panels. P a g e | 11 B. Vertical dock levelers are utilized, the truck dock finished floor elevation shall be 50 inches above the truck pad elevation subject to the following parameters: a. b. c. d. 50" from truck pad to finished floor 36" from truck pad to bottom of pit floor 15" step down from finished floor into pit (1/2” slope from back of pit to front of pit) See drawing (Need reference C. A trailer restraint system will be inset into each dock, recessed hook style. D. Truck dock doors shall be arranged at 14 feet on center. E. Rail dock exterior walls shall be constructed of UL Listed and / or FM approved pre-finished insulated metal panels (the manufacturer shall be approved by AMERICOLD). F. Rail dock doors shall be arranged so that their centerlines will accommodate the type and size rail car servicing the facility. AMERICOLD will verify the rail car service. G. Rail dock doors shall be arranged on 88 feet on center to handle super-cars if centerline not specified by AMERICOLD. H. The minimum clear height of truck docks and rail docks shall be 28 feet (clear height is defined as the height above the finished floor to the underside of the lowest point of structural steel frame). I. Rail dock doors will be constructed with an exterior rail seal to maintain a cool environment between the dock and the rail car. Rail end stop barrier(s) shall be installed at the end of the line, if applicable. The position of the end stop barrier(s) will accommodate the alignment of the rail car door centerlines for the type and size rail car servicing the facility on the center of the rail dock doors. J. All rail shelters are to be (4) sided and inflatable. K. AMERICOLD requires all docks to be clear spanned. 1.3.2 Freezers A. Freezer walls shall be constructed of UL Listed and / or FM approved pre-finished urethane core insulated metal panels (the manufacturer shall be approved by AMERICOLD). Cut sheets must be provided. Minimum R-Value should be 38 (for a 6” panel).The minimum clear height in all freezers shall be 50 feet, unless otherwise indicated (clear height is defined as the height above the finished floor to the underside of the lowest steel frame structure component. B. All roofs shall slope at ¼-inch per foot, minimum. 1.4 Building Signage A. Utility outlet at every door exiting the building including emergency exist in freezers and coolers. B. AMC to supply building signs and locations – GC to install all signs. P a g e | 12 C. All welfare area fire extinguishers are to be recessed into the wall. D. All wire trays mounting on the floor must be at least 6” off the ground for easy cleanup E. All employee parking spots must have parking blocks. F. All truck parking spots must have 1,000# parking blocks pinned in at least 3 spots or 12” concrete curb Chapter 2 SITEWORK Note: The guidelines below shall be considered a minimum requirement regarding concrete and site work performance and quality by AMERICOLD. All concrete and site work design, detailing, reinforcing and specifications, etc. shall be certified by a Professional Engineer licensed in the State of the Project. 2.1 Concrete Paving A. The concrete truck pad shall extend 75 feet out from the face of the truck dock. B. Expansion Joint Z stripes to be use between the slabs to prevent damage during expansion and contraction cycles C. The concrete strength shall be 4,000 PSI. D. Concrete aprons shall be 8 inches thick with rebar or fiber (Fiber design approved by Americold and approved vendor. E. All joints and saw cuts in concrete shall be caulked. F. The truck pad shall not exceed a 2% grade away from the dock. G. All construction joints shall have lead transfer dowels. H. All swales into retention ponds are to be concrete with large stones embedded in concrete to break up water flow. I. Dolly Pad thickness shall be 12 inches thickness before rebar and 8 inches top concrete layer. 2.2 Asphalt Paving – Heavy Duty (to be confirmed with Geo-Technical Report) A. 8-inch crush and run base. B. Tack coat at base. C. 3-1/2-inch bituminous asphalt binder. D. 1-1/2-inch asphalt topping, type D or E. P a g e | 13 2.3 Asphalt Paving – Light Duty (to be confirmed with Geo-Technical Report) A. 6-inch crush and run base. B. 2-inch bituminous asphalt binder C. 1-1/2-inch asphalt topping type D or E. 2.4 Site work - Miscellaneous A. No grade in truck travel areas shall exceed 4%. Should an area with a steeper grade be required, it shall be brought to the attention of the AMERICOLD Construction Manager in writing, prior to the commencement of work, during the design phase. B. The design shall encompass the materials, equipment and methods of fabrication to complete the excavating and back filling, soil compaction, paving, landscaping and all site utilities. C. Any slope greater than 3:1 shall require a concrete retaining wall. D. Contractor to provide all testing of back filled and built-up areas that require compaction shall meet the Geotechnical reports recommended procedures, and shall be verified by an independent testing laboratory. Test results shall be furnished to the AMERICOLD Construction Manager immediately upon completion. E. No spoil dirt or excess excavation material shall be spread on the site without the written approval of the AMERICOLD Construction Manager. F. All pavement design shall be verified by a Professional Engineer licensed in the State of the Project. G. Install 16-inch heavy duty parking stops in all tractor/trailer parking spaces, with the rebar epoxied in place. Parking stops shall resist 1,000 lbs of horizontal force. 12” continuous concrete curb acceptable as an alternate design. P a g e | 14 H. Install sod or concrete flues to prevent erosion at all areas subject to potential water run-off. I. A covered break area shall be installed in the vicinity of the main entryway. The location will be finalized with the AMERICOLD Construction Manager. It will consist of a canopy and two allweather tables. J. All inlets (flues/curb inlet/ drains into retention areas must be concrete. K. For high rise automation projects, include all cost to supply a temporary laydown area sufficient to meet the needs of the Americold automation contractor (100,000 sq. ft.). Automation contractor to supply the size of the area needed and description of materials being stored. The G.C will be required to maintain the areas subgrade throughout the project so not to cause schedule delays, delivery delays or damage to materials due to bad subgrade. 2.5 Site Security- On-Site Security Guards A. General Contractors shall provide on-site Security Guards around the clock coverage for the period of 4 months prior to acceptance/go-live for conventional builds. B. General Contractors shall provide on-site Security Guards around the clock coverage for the period of 8 months prior to acceptance/go-live for high bay, rack supported builds. This should coincide with peak quantities of materials onsite that are likely to be stolen (i.e. steel, copper, office finishes, equipment, etc.). 2.6 Site Security - Guardshack A. General Contractor shall supply a centralized guardshack for site entrance unless specifically excluded from scope of the project. B. Guardshack shall be similar to Porta-King model following and have space for up to 3 associates, uni-sex bathroom, and climate controlled. C. Connections to water and sewer/septic shall be included D. Connections to power shall be included E. Additional underground conduit for AMERICOLD fiber connectivity shall also be included from the MDF room F. (3) Flag poles are provided G. Provide Power at the base of all electrical pole, all concrete barrier to be conduit. H. Concrete guarding around the building is provided. I. Red/Green traffic light control is provided for inbound and outbound traffic and shall be mounted to light bar above the lane except stated otherwise. P a g e | 15 P a g e | 16 P a g e | 17 2.7 Site Security - Fencing A. General Contractor shall include perimeter fencing to secure overall lot, unless specifically excluded from scope of the project. B. New fencing shall be supplied around finished construction area and tied into any existing perimeter fencing to reduce overall linear footage of C. New fencing shall be 6’ in height, chain-link, with 3 strands of barbed wire across the top at an angle facing outward. a. Vinyl fencing may be a required substitute in certain areas depending on local code requirements for civil/landscaping permitting. D. Man, gates to be provided every 400’ of fencing, manual operation, and connected to the access control system as required by the POS. E. Manual slide gates to be provided at truck entrances F. At truck and trailer parking, fencing to be set back minimum of 15’ from paving 2.8 Landscaping P a g e | 18 A. All landscaping required by the authorities having jurisdiction shall be included in the Project. In areas where there are no landscaping requirements, AMERICOLD will provide landscape plans or suggestions regarding the type of planting to be included. B. Shrubs and bushes shall be planted in the area of the office / welfare entrance, as directed by AMERICOLD. C. All areas should be graded and hydro-seeded to allow for mowing, unless local requirements allow substitute materials to minimize long-term maintenance. D. General Contractor should carry landscaping as an allowance in their pricing. Chapter 3 CONCRETE Note: The guidelines below shall be considered a minimum requirement regarding concrete performance and quality by AMERICOLD. All concrete design, detailing, reinforcing and specifications, etc. shall be certified by a registered Professional Engineer licensed in the State of the Project. 3.1 Freezer Floor Slabs A. Concrete strength shall be 4,000 PSI. B. Concrete slab shall be 8 inches thick (minimum). C. Reinforcing shall be installed in the upper half of the concrete slab, subject to the certification of a Professional Engineer licensed in the State of the Project. D. A 6-mil Poly slip-sheet shall be installed between the wear slab and the top of the insulation. E. Prefer engineered floor quality to be used in the freezer, (i.e. Kalman Monorock or Frick floor slabs) with Type K cement. The location of construction joints shall be planned so that they are not in the traffic aisles, and that they cross the traffic aisles in as few locations as possible. These types of floors should continue to shine/sheen with traffic over time. F. All construction and expansion joints exposed to traffic should be armored. G. All construction joints and expansion joints must be caulked. H. Floor slab settlement requirements shall be 1” total settlement with 1/2” differential settlements in 50.’ 3.2 Freezer Sub-Floors A. Freezer sub-floors (mud slab) shall be 3 to 4 inches thick (minimum), unreinforced. 3.3 Truck and Rail Dock Floor Slabs A. Concrete strength shall be 4,000 PSI. P a g e | 19 B. Concrete slab shall be 7 inches thick (minimum). C. A 6x6x6/6 welded wire mesh shall be installed in the upper half of the slab, subject to the certification of a Professional Engineer licensed in the State of the project. D. Install two (2) layers of six Mil Poly slip-sheet between the sub-grades and wear slab of the truck dock. E. Shrink compensation slab to be used on the rail and truck dock, (i.e., Kalman Monorock or Frick floor slabs) with Type K cement. The location of construction joints shall be planned so that they are not in the traffic aisles, and that they cross the traffic aisles in as few locations as possible. These types of floors should continue to shine/sheen with traffic over time. F. All construction and expansion joints exposed to traffic should be armored. G. All construction joints and expansion joints must be caulked. 3.4 Locker Room Floor Slabs A. Concrete strength shall be 3,000 PSI. B. Concrete slab shall be 4 inches thick (minimum). C. Concrete slab shall be sealed and polished. 3.5 Exterior Electrical Component Slabs A. A transformer slab will be poured to manufacturer requirements. B. The location of the transformer slab will be coordinated with the Electrical Sub-Contractor and approved by the AMERICOLD Construction Manager. C. An emergency generator slab will be poured to manufacturer requirements. D. The location of the emergency generator slab will be coordinated with the Electrical SubContractor and approved by the AMERICOLD Construction Manager. 3.6 Floor Slabs – Miscellaneous A. No turn-down slabs shall be allowed in finished temperature-controlled space floors. B. Supplier should explicitly notify AMERICOLD when and where non-engineered floors are specified. C. Dock leveler pits shall be constructed in accordance with Loading Docks - Truck and Rail Construction Details, Paragraph 1.3.1.b). D. Non-automated: floor slabs shall be placed and finished to meet the following flatness and levelness tolerances, unless otherwise specified, as measured using ASTM #E1155 standard testing method for determining flatness and levelness using the Face-number system: Local Overall P a g e | 20 Ff 35 40 Fl 30 35 E. Automated (to be confirmed with automation supplier): high bay Automated Storage and Retrieval System (ASRS) crane floor slabs shall be placed and finished to meet the following flatness and levelness tolerances, unless otherwise specified, as measured using ASTM #E1155 standard testing method for determining flatness and levelness using the Face-number system: Local Overall F. Flatness testing to be slab pour. If any slab fails to removed and replaced. Ff 100 100 Fl 50 50 conducted within 24 hours of every meet the minimum local, it shall be G. Any cracks that appear in the concrete floors, or in the concrete truck apron will either have to be cut out and re-poured, or treated with a structural-type epoxy. The AMERICOLD Construction Manager will determine which course of action to take (cracks longer than 4 feet will require an additional three (3) year warranty). H. All concrete construction joints shall be doweled. I. All concrete shall be strength tested by a reputable testing laboratory and shall include: 1. One (1) set of tests for all concrete placed in one (1) day, and one (1) set of tests for each 100 yards of concrete placed, if more than 100 yards of concrete is placed in one (1) day. 2. All test cylinders shall be taken stored (cured), and shall be tested as recommended by the ACI Manual of concrete application. 3. Five (5) test specimens shall be considered a set. One (1) of the specimens shall be tested at seven (7) days; and three (3) specimens shall be tested at twenty-eight (28) days. Reserve one (1) for 56 day breaks. I. The design of all concrete shall be certified by a Professional Engineer licensed in the state of the Project. J. Design spec’s must be approved and filed with AMERICOLD 3.7 Concrete Curbs A. Concrete curbs are required in freezers for any exposed walls not covered by racking. Curbs shall be 48 inches tall with 45 degree sloped tops; the vertical face of the curbs shall align with the face of any adjoining building columns. P a g e | 21 B. All walls on the truck docks and rail docks shall be protected by continuous concrete curbs that are 48 inches tall with 45 degree sloped tops; the vertical face of the curbs shall align with the face of any adjoining building columns. C. No concrete curbs are required in the Engine Room. D. Where curbs are specified In the Battery Room and Maintenance Shops, a 16-inch curb shall be installed. The vertical face of the curbs shall align with the face of any adjoining building columns. This should be 16” to a 12” face E. The minimum curb length shall be 2 feet (measured along the vertical face of the curb), unless the protected wall is less than 2 feet. F. No curb shall be less than 6 inches thick or as thick as the column, whichever is greater. G. Install one (1) layer of 4 mil Poly sheeting between all curbs and walls. H. All curbs shall have a vertical chamfer joint at the mid-point between building columns and at any plumbing or electrical pipe, for crack control. I. Any exposed insulated metal wall panel area 40 inches or wider that is not protected by storage racks shall be protected by a guard posts or a curb. J. A 100-foot length of curb on the dockside of the freezer shall have a 12-inch, 10GA galvanized metal plate installed in the bottom of the curb in the area where MHE will be parked. K. All curbs shall have a 1.5-inch x 1.5-inch galvanized metal 45-degree angle attached to the wall at the top of the curb, for the curb to finish to and to receive caulk. L. Control joints to be provided. M. Expansion joints in bracing to be provided. 3.8 Concrete – Miscellaneous A. All exposed concrete foundation walls shall be vibrated and rubbed to an acceptable smooth finish. Honeycombing is not acceptable. B. All interior and exterior concrete joints shall be caulked (caulking material to be approved by AMERICOLD). C. The General contractor shall install a 2-foot concrete “rat run” around the exterior of the entire facility. This run can be substituted with stone where site landscaping allows and approved in writing by the AMERICOLD Construction Manager. D. All rat runs shall form a continuous boundary around all emergency exit stairs. E. All steps constructed of concrete shall be finished with safety grooves the entire width of the steps F. Main exterior entrances to welfare areas shall be wide enough to accommodate a double door entrance. This includes the width of all stairs descending to ground level. P a g e | 22 G. An American with Disabilities Act (ADA) compliant access ramp will be installed for all entrances above grade. A small vehicle truck ramp can be purposed for this if the design is compliant with ADA specifications. This substitution shall be approved in writing by the AMERICOLD Construction Manager. H. Stair treads to be approved by Americold. Chapter 4 MASONRY 4.1 Masonry – General A. Interior walls at the Engine Room, Maintenance Shop and Battery Room shall be constructed of grout filled, 12-inch concrete masonry units (CMU), precast concrete or tilt–up concrete. The wall between the Battery Room / Maintenance Shop and Truck Dock shall incorporate a 6-inch EPS liner panel on the dock side of the concrete block wall. P a g e | 23 B. IMP wall paneling will be acceptable in areas of maintenance that do not include ammonia storage or refrigeration equipment. Any IMP wall substitution vs. CMU should be called out and approved by AMERICOLD. C. Interior walls between the Office / Welfare area and all general traffic areas and hallways shall be constructed of sheet rock, or other sound dampening material, covered by Fiberglass Reinforced Plastic (FRP) in an off-white/gray color scheme. This wall type holds up in industrial settings and is easier to clean vs. re-paint frequently. AMERICOLD will approve the paint type and color. D. All interior walls are to be full height (to deck) and insulated to reduce noise. E. The conference room, if in the design, will have only painted gypsum walls, not FRP panels. F. All exterior concrete masonry unit walls shall be split face colored CMU (color and texture to be approved by AMERICOLD) G. If applicable, a Low Oxygen System room will be constructed as outlined in Section 18. If required room of CMU will be provided. H. Scrubber dump wall to be 6' HIGH CMU WALLS W/ CONC. SLOPED CAP. PAINT W/ EPOXY PAINT, FLOOR FINISH IS EPOXY COATING Chapter 5 METALS 5.1 Structural Steel The structural steel design shall encompass the supply, fabrication and erection of the building framing and bracing, opening framing, shipping, painting, testing and inspection, welding and all related accessories, and miscellaneous metal. The AMERICOLD Construction Manager shall be provided with all shop drawings and criteria. A. All structural steel is to be ordered Primer White (Note: The color of the primer used on the roof joists and structural steel shall be determined by project team ). B. All primed or painted metal that is damaged by both shipping and handling or by field welding shall be cleaned, a rust-inhibiter applied, and the paint touched up. C. All structural steel and decking shall be clean and completely free of any dirt and mud. D. Structural steel on the truck dock shall be designed to support spare pallet storage on racking above the dock doors. Install two (2) continuous 6-inch steel channels attached to the roof joist for attaching the spare pallet storage racks. 1. The above-dock storage rack shall be supplied and installed by the General Contractor. Each bay Should be wide enough to support (3) stacks of (12 pallets each) weighing up to 1000# per stack. 2. Each bay of above-dock storage rack weighs approximately 1,056 lbs. P a g e | 24 E. All condensers, in any installed ammonia systems, shall be equipped with galvanized steel catwalks around all sides, top and bottom. F. All condensers shall be equipped with oversized man doors. G. All condensers must be approved by AMERICOLD prior to placing the order. H. The General Contractor shall install catwalks with OSHA-compliant guardrails/handrails around all evaporators in the coolers and/or freezers. a. This is not required for penthouse evaporator unit installations. I. If required, the General Contractor shall install OSHA-compliant (minimum three (3) horizontal bars, 42-inches high) guardrails/handrails around the roof perimeter. The guardrail/handrail will be placed 6 feet back from the edge of the roof. a. Guardrails/handrails shall only be installed on roof levels that have equipment mounted and expectation of traffic for maintenance when mounted within 20’ from edge of the roof. b. Roof guardrails/handrails stub-ups will be installed prior to the installation of roof insulation and membrane. J. If applicable, the non-enclosed Rail Dock shall have a hot dip galvanized OSHA-compliant (minimum three (3) horizontal bars, 42-inches high) guardrail/handrail along the exposed edge to the tracks. The guardrail/handrail will not obstruct the dock plate placement. K. All freezer and cooler type man doors are to outfitted with hinge closers (no surface mounted closers). L. Every single and double select rack pallet position will have pallet support beams. M. All second level locations of select racks will have wire decking installed and secured with tec screws to protect first level locations from falling product. 5.2 Steel Joists A. All roofs shall slope at 1/4-inch per foot, minimum. B. The selection of steel joists for truck dock and rail dock roofs shall be coordinated with the Electrical Engineer to ensure that there is adequate depth for the lighting fixtures to be protected within the joist. 5.3 Metal Deck A. Metal roof deck for all areas shall be 22 GA with G-90 galvanizing. B. All roof decking shall be screwed in place. Welding or shot type fasteners are not permitted. Alternate methods other than welding will be accepted as alternate pricing. C. Flutes in the roof deck shall to be designed to run perpendicular to the slope of the roof. P a g e | 25 5.4 Metals - Miscellaneous A. Install a continuous hot-dip galvanized angle iron around the perimeter of the dock leveler pit and the rail dock. B. Vertical Dock Levelers: Attach a 3 x 3 x 10 x 3/8-inch angle to the 84-inch-high 6-inch diameter bollard at every dock door to receive a fixed head light fixture. The steel angle shall be coped to fit a 6-inch diameter pipe. (The LED dock light is supplied and is installed by the General Contractor.) C. For non- penthouse unit installations, the General Contractor shall provide steel platforms, steel grate walkways and hand-rail systems to support the condenser, at the top and bottom of the condenser. (The Refrigeration Sub-Contractor shall provide condenser weight and dimensions). Platforms shall meet all OSHA standards. The condenser support shall be designed as follows: 1. Condenser stands shall be constructed of hot-dipped galvanized steel. 2. Condenser stands shall be properly sized to fit the condensers, and allow for the installation of a four-sided work platform around the top and bottom of the condenser. 3. Condenser mounting location(s) and stand design(s) shall be approved by the AMERICOLD Construction Manager. 4. The General Contractor shall install a 1-1/2-inch diameter galvanized pipe windsock pole, mounted to a condenser stand and extending at least 10 feet above the top of at least two condensers, if multiple condensers are installed. D. A system of structural channels or tubing shall be used for the mounting of overhead door tracks and counterbalance spring assemblies (wood of any type will not be permitted). E. A steel ships ladder shall be installed in the Maintenance Shop to provide access to temp controlled room or outside access as directed by the project team , equipped with an oversized roof hatch (large enough to provide access for a person in a SCBA suit). Additional ships ladders shall be installed to provide access to each different roof elevation on the building. The exterior ladders shall be hot-dip galvanized steel. All ladders shall be OSHA approved with basket guard hoops where required (minimum 6 foot height). F. Exterior ladders above the roof must be provided for personnel access between all building roofs. P a g e | 26 P a g e | 27 P a g e | 28 G. Rail dock doors shall be guarded by 6-inch diameter Schedule 40 steel pipe bollards set into the concrete at least 18 inches below the finished floor. Bollards shall be filled with concrete and fitted with a steel weld cap on top. All welds shall be ground smooth and polished. H. Doors into the freezer from the truck dock shall be guarded. P a g e | 29 I. Doors into the freezer from the rail dock shall be guarded. J. The bollard edge should be at least 2” inside the door jam so as to direct vehicle into the doorway and away from the door jams. K. 6-inch diameter guard posts with three (3) 6-inch steel channel shall be installed at any entrance doors to the truck dock, and in front of any electrical panels. L. Goalpost bollards for freezers and the dock side of high-speed doors shall be U-type 6-inch diameter Schedule 40 steel pipe, solid pipe welded to the top and at the imbed.. M. The General Contractor shall supply embeds and bollards in front of all quick charge battery chargers. The AMERICOLD Construction Manager shall determine the quick charger locations. Do not install racking or storage areas. N. All bollard are to be galvanized, non-painted metal, except for rail dock installations. Rail dock installations will utilize pre-fab, yellow bollards with built-in LED light. O. Where piping crosses a walkway, a crosswalk stair is required and shall be constructed of hotdip galvanized steel or aluminum. AMERICOLD shall approve the location, design and material of the crosswalk stair. P. Guards on both sides of the overhead door to the Battery Room from the dock shall be U-type 6inch diameter Schedule 40 steel pipe, similar to guards on the freezer door. Q. Where applicable, the General Contractor shall provide one (1) welded metal ladder for accessing each blast cell ceiling area, with one (1) guardrail on one side of the ceiling area opposite the fans. All ladders shall be OSHA approved with basket guard hoops, If applicable add safety cable, minimum 6 foot height). R. All downspouts on the truck dock shell be protected by steel guards (see AMERICOLD drawing) S. The General Contractor shall install a 3’11” deep continuous canopy above all truck dock doors and the drive-in ramp door, and a canopy over all personnel doors. The canopy shall be fabricated with pre-finished standing seam, Mansard style metal roof deck, with a closed soffit. Note: Canopies are not required over emergency exit doors; a standard drip edge may be utilized. Depth may be re-evaluated based on local codes and fire protection considerations. a. Default color should be ‘Regal Blue’ per the Firestone materials color guide, but should be approved by the AMERICOLD Construction Manager). b. http://firestonebpco.com/assets/2013/03/metal-color-selection-chart-item-1185-pdf2.pdf T. All overhead door openings shall have the jam and header wrapped with 10 GA galvanized steel, caulked on the top, bottom and sides. All voids are to be foamed before covering with 10 GA Galvanized steel U. All exterior steps, platforms and hand rails that are fabricated out of metal shall be galvanized steel. V. Empty pallet storage is to be built by General Contractor W. All miscellaneous steel in dock will be galvanized. P a g e | 30 Chapter 6 THERMAL AND MOISTURE PROTECTION 6.1 Insulated Metal Wall Panels A. UL Listed and / or FM approved Insulated Metal Panel Manufacturers approved by AMERICOLD include: 1. Metl-Span 2. True Core with polystyrene 3. Advanced Insulation 4. Kingspan 5. All other proposed manufacturers shall require the written approval of AMERICOLD. B. Panel Construction 1. IMPs shall be sandwiched with pre-painted 26 GA with G-90 galvanized steel skin. 2. All interior and exterior panel surfaces shall have an embossed finish. 3. The panel finish coat shall be USDA and FDA approved. 4. The steel skin shall be bonded to an insulation core with a two (2) component-type urethane adhesive on a continuous in-line process. 5. Exterior joints shall be tongue and groove design. 6. Panels shall be full height; double-stacking of panels shall not be permitted, unless required for ASRS building construction requirements (Face caulking will be required in a situation where stack joints is used). 7. All panels indicating any deformations (i.e.: telegraphing, oil canning, board joints, etc.) will be rejected. C. Insulation 1. Insulation density to be not less than one pound per cubic foot. 2. The General Contractor shall provide AMERICOLD with certified test results on the insulation foam used. 3. All freezer walls shall be 6-inch thick insulated metal panels and have an R-value of 38. 4. All truck dock and rail docks walls shall be 5-inch thick insulated metal panels (minimum). 5. All Blast Cell walls (where applicable) shall be 6-inch thick insulated metal panels. D. Approvals 1. The General Contractor shall submit all IMP specifications to Global Risk Consultants (GRC) for review, prior to installation, through the AMERICOLD Construction Manager P a g e | 31 6.2 Floor and Roof Insulation A. Floor insulation shall be 7-inch extruded polystyrene, comprised of one (1) layer of 3-inch and one (1) layer of 4-inch polystyrene, with staggered joints. 40 psi material to be used. B. A 10 mil poly vapor barrier shall be installed between the sub-floor and the underside of the insulation. C. For non- automated conventional MHE projects, freezer floor insulation shall extend out from the center line of freezer doors 8'-0" x 16'-0" wide. Underfloor heat must extend out into the dock 8'X16' at MHE door D. For automated MHE projects, the underfloor heating system and underfloor insulation shall extend under the truck or rail dock slabs for a minimum of 15 feet from the face of the freezer wall at all freezer and cooler doors across the entire length of the freezer wall between these openings. E. A 3-inch thick, 4-foot wide (continuous) horizontal strip of extruded polystyrene insulation shall be installed along all foundation walls at cooled areas. F. A 4 mil poly slip-sheet shall be installed between the wear slab and the top side of the insulation. G. Freezer roofs shall be insulated with three (3) layers of 3-inch-thick polyisocyanurate with fire retardant covering insulation. H. Truck dock and rail dock roof shall be insulated with two (2) layers of 3-inch-thick isocyanate insulation. I. Isocyanate insulation shall have a minimum compressive strength of 15 PSI on all roofs. The compressive strength of the specified floor insulation shall be submitted to the AMERICOLD Construction Manager for approval. J. All floor and roof insulation shall be inspected by the AMERICOLD Construction Manager at each stage of the installation. No additional layers or coverings may be installed without AMERICOLD approval. K. The General Contractor shall submit all roof installation materials to Global Risk Consultants (GRC) for review, prior to installation, through the AMERICOLD Construction Manager. 6.3 Membrane Roofing A. All roofs shall be comprised of a 60 mil Carlisle or Firestone single-ply, mechanically attached white thermoplastic polyolefin (TPO) system with 10-year warranty (minimum). A 20-year warranty shall to be furnished as an alternate. B. A continuous walk board system shall be installed, running from the roof access ladders and hatches to each refrigeration control valve group, around the condenser(s) and in any other regular traffic area. The layout and materials shall be approved by AMERICOLD. C. Install 5X5 Dens deck between insulation and TPO D. All metal trim, gutters, and downspouts, etc. shall be .050-inch pre-finished aluminum. The gutter size shall not exceed 9-inches wide. P a g e | 32 E. No pitch pans are permitted. F. All roofs must be FM approved. All roofing materials and methods must be reviewed, approved and accepted by Global Risk Consultants and Americold before installation can start. Any impact to the projects schedule must be identified up front. G. No open face downspouts allowed on any facility. All downspouts are to completely be closed and heat traced as needed - with a manual control switch to turn on and off and a light to indicate when the system is on. 6.4 Construction Manager Miscellaneous A. Install plastic splash blocks under all downspouts. B. Downspouts may not discharge onto any area used as a walkway, ramp or step, etc Chapter 7 DOORS 7.1 Overhead Doors - General A. Overhead doors shall be min. of 3-inch-thick EPS core with 26 GA steel skin, AMERICOLD preferred truck door is Haas 3-inch-thick EPS core with 26 GA steel skin. B. R-value of 18 should be provided. C. Overhead doors shall be vertical lift type with: 1. Steel angle mounted 3-inch heavy-duty tracks and rollers. Angle mount shall be attached with screws/bolts; NO welding or fab-lock fasteners will be accepted. 2. Spring type stops at the top of the vertical tracks. 3. This is not needed on vertical lever installations 4. Interior locking devices – location to be approved by AMERICOLD. (only needed if door motors are not installed 5. One insulated glass window – Window to be located very close to operator’s panel. 6. All overhead doors shall be equipped with a motor hoist. 7. Cables shall be attached to the second panel from the bottom of the door. This is not needed on vertical leveler installations. 8. Doors shall be installed with an extra lift in their opening position, so that the doors rest approximately 8 inches above the door opening. 7.2 Overhead Doors – Truck Docks A. Truck dock door openings shall be 10 feet wide x 11 feet 10 inches tall referencing from the dock leveler pit depth and 10 feet 6 inches referencing from the finish floor. P a g e | 33 B. Provide 24” tall numbering system over all dock doors. C. Doors shall allow for trailer doors to be opened from the loading dock. 7.3 Overhead Doors - Rail Docks A. Rail dock door openings shall be 12 feet wide x 12 feet tall. B. Rail dock overhead doors shall be the same brand and design as the truck doors. 7.4 Overhead Doors - Miscellaneous A. The door opening between the Battery Room and truck dock shall be 8 foot 6 inches wide x 16 feet tall, height should be verified for each project. Ensure door size fits MHE 7.5 High-Speed Freezer and Cooler Doors A. All openings between the truck dock and freezers or coolers, and any opening from freezer to freezer or cooler to cooler, shall be equipped with automated high-speed, roll-up or bi-parting doors with the following included: 1. 115-volt thermostatic controlled electric heaters. 2. Locking device. 3. A limit switch to sense when the manual single slide doors are fully open and control the operating circuit of the Auto Clear bi-parting door. B. All freezer and cooler openings shall be equipped with Rytec, Rite Hite, Enviro doors, or Assay Abloy (where applicable). Permissible door types include insulated fast roll up doors, fast open breakaway bi-parting doors and fast open curtain type doors. Door type and style must be approved by AMERICOLD before orders are placed: 1. Freezer and cooler doors shall be 8 feet wide, verify opening height on each project. 2. Floor loops shall be utilized in all new construction. Never Fail loops by Rytec or systems of similar/greater quality shall be used.” ( Opening location must be approved by Americold Construction Manager). P a g e | 34 P a g e | 35 P a g e | 36 3. Construction Manager Doors shall be equipped with cycle counters. 4. Push buttons for personnel ingress/egress shall be installed for both directions of travel. (To be approved by the project team) 5. Control boxes and disconnect switches shall be mounted outside all doors on the dock above the protective curb, immediately adjacent to the guard post, mounted approximately 5 feet above finished floor. 6. All doors shall be equipped with soft start, dual speed, 480V, 3Phase motors. The opening contactor coil shall be interlocked with a spring arm limit switch which is mounted to detect that the manual slide (night door) door is closed, and disconnects the circuit so the door cannot open, but the heater will continue to work. 7. The door installer shall coordinate with a Rytec, Rite Hite or Enviro representative to assist in the startup of the doors. C. The door from the truck dock to the battery charger room shall be an AMERICOLD approved fast roll-up door with a close warning audible alarm and LED lights on the side of the door. The door shall be 8 feet wide, verify height in project documents. NOTE: the installer shall install all remote wiring in EMT conduit. NO FLEX SHALL PENETRATE THE WALL. D. All overhead engine room doors shall be 10 feet wide (minimum) with a chain hoist for opening. E. Airlock doors, if required based on automation design, and conveyer entry doors shall be 66 inches wide (minimum). 7.6 Personnel Doors A. All personnel doors from warm to cool areas from offices to the dock shall be FRP cooler type doors, with kick plates, hinge closers, panic bars on the inside, pull handles with a lock on the outside, and view windows, unless otherwise approved in writing by AMERICOLD. B. All freezer personnel doors must come equipped with (Kason 1097) or similar. C. All interior personnel doors shall have kick plates and door closers. (Where possible hinge type closers). All personnel doors going into welfare areas or inside the office/welfare areas are required to have windows for safe entrance and exit. The exceptions to this are the following doors – Restrooms, Locker rooms, Mop closets and storage rooms. D. All cooler and freezer type doors are to have the following items – Kick plates on both sides, hinged door closers and emergency panic hardware. E. Where approved for use, all hollow metal doors shall have foam filled cores with Thermopane view windows. In cooler areas, doors and frames shall be fabricated with FRP painted in accordance with AMERICOLD specifications and keyed to AMERICOLD key system on site. F. General contractor architect shall provide specifications for thermally broken and heated window frames for Americold approval. G. Miscellaneous: P a g e | 37 1. AMERICOLD and the General Contractor shall jointly select the types of door hardware. 2. All access doors used by AMERICOLD employees are to be equipped with electronic strike plates to accommodate access card entry. 3. The General Contractor shall supply a master re-keying of all locks at the conclusion of the Project. The key system shall have a grand master key and sub-masters for the office area and maintenance shop area. 4. All lock and passage sets shall be heavy duty, Cal Royal with Schlage C cylinders, approved by AMERICOLD. 5. All lock and passage sets shall be Lever style Cal Royal, unless otherwise require by code. 6. All emergency exit doors from freezers or coolers shall be high sill type. No sweep type doors shall be permitted. H. The Battery Room shall be equipped with one (1) 3 foot wide x 7 foot tall personnel door from the truck dock, and one (1) 3 foot wide x 7 foot tall personnel door into the machine room. I. All Blast cells, where applicable, shall be equipped with a 2 foot 6 inch wide x 6 foot 8 inch tall personnel door on each side of the overhead door. The personnel doors shall be metal with foam filled cores and door closers, approved by AMERICOLD. J. All doors and windows facing the truck dock, shall be heated and thermally protected to avoid condensation build up. K. All high traffic personnel doors shall be equipped with adjustable door closers (Hinge closers are preferred all cooler freezer type doors) kick plates, panic bars, and view windows. L. All engine room doors shall be equipped with panic bars, and door closers. The doors shall swing in the direction of egress. M. All exterior doors shall be cooler style FRP doors equipped with hinge closers, kick plates and panic bars. N. All exterior doors and doors providing access to office areas shall be equipped with electronic strike plates, conduit and pull strings for a pass card system to be installed by AMERICOLD. O. All exterior door (except emergency exit doors in the freezer) must have electronic strike plates, wiring, conduits and pull strings for security pass card system. P. The conference room door, if in the design, can be made of solid core wood. Q. The IT Room door specification is outlined in section 15.1.B. P a g e | 38 Chapter 8 FINISHES 8.1 Office / Welfare Area Finishes - General A. On all exterior walls, install 2 inches of extruded polystyrene insulation board to the underside of the roof or floor deck, with 4 inches of batt insulation between metal studs. B. All gypsum board shall receive a light roll-on texture prior to painting. approved-12 Wiremold raceway 092900 CraneComp-GlasbordWlPnls-FRP-2pgs for offices 7.30.18.pdf (003).pdf C. At all private offices, administrative, conference rooms and work rooms, the metal stud framing and gypsum board shall be extended tight to the underside of the roof deck for soundproofing purposes. All interior partitions shall be filled with fiberglass batt insulation between the metal stud framing. Bathroom/locker room need to have sold ceilings throughout. D. Install pressure-treated, fire-retardant wood blocking in the break room wall to support a 46inch to 90-inches TV monitor (support from 6’ to 8’). Coordinate the location of the monitor with AMERICOLD Construction Manager. E. The break room shall include a kiosk area for employees, comprised of wing walls, a standup height counter for a computer screen and keyboard, and a counter below for a printer. AMERICOLD shall approve the design and detail drawings. (The location of the kiosk is to be determined by AMERICOLD) F. At least one water fountain in the office and one in the breakroom must be equipped with the Hydro Boost bottle filling station with a filter (Halsey Taylor HTHB-HAC-RF-NF HydroBoost Bottle Filling Station Retrofit Kit for HAC 115V Water Coolers, Non-Filtered, Non-Refrigerated). P a g e | 39 G. For all common walk areas, welfare areas and most offices, walls should have Fiberglass Reinforced Plastic (FRP) Light gray, or similar coating/covering approved by AMERICOLD, instead of painted sheet rock or other wall construction. This avoids wall from getting dirty requiring repainting or other deep cleaning. H. Conference room, if applicable: a. The conference room, if in the design, will have only painted gypsum walls, not FRP panels. b. The conference room will be finished with carpet tiles. The color scheme will be approved by the AMERICOLD Construction Manager. I. All walk areas and bathrooms will have Stonehard or similar floor finish. No VCT tiles or carpeting is accepted unless otherwise noted. Carpeting in conference rooms only. J. No laminate finishes will be used for horizontal surfaces such as vanities and countertops. An engineered stone solution shall be used. AMERICOLD to approved both type and color K. Grommet holes shall be drilled every 3 feet in engineered stone countertops for wire passage. L. Electrical troughs will be installed along the wall below the countertop in conjunction with the grommet holes. M. Wall based network terminations will be on dual-port faceplates. N. Support Structure can have laminate finish if hidden underneath the engineered stone countertop. O. All cabinets are lockable drawers. P. The color of cabinets and Corian shall be as following. P a g e | 40 P a g e | 41 Q. Lockers shall be installed to account for all associates (number and layout approved by AMERICOLD prior to placing order). Lockers will be two-tiered with vented doors. They will sit directly on the floor with a metal panel to block debris from reaching the area underneath. R. HALLOWELL DOUBLE TIER LOCKERS a. MODEL: HDV – 2 TIER – b. 12*18*72/78 c. CLOSED BASE d. NUMBERED e. HALLOWELL GARY f. FILLER PIECES AT ENDS AND CORNERS g. ( )6’ LONG BENCH WITH PEDESTALS h. FACTORY ASSEMBLED S. Install wireless multipoint energy sub-metering in Offices including 2 subsystems (Lighting and HVAC). T. All welfare and office areas will have a Stonehard or equivalent finish. No polished concrete. P a g e | 42 8.2 Paint – General A. The General Contractor shall paint the Engine Room and Motor Control Center (MCC) electrical panel room floors with the Tennant HTS Coating System. Four colors shall be used: 1. Red for walkways 2. Gray for all other areas 3. Yellow to border all color changes. 4. Dark Gray on machine bases and housekeeping pads. The AMERICOLD Construction Manager shall approve the walkway layout and color selections. B. All Engine Room concrete masonry unit walls shall be primed, and painted with two (2) coats of a washable gray paint to a height of 5 feet above the finished floor, and two (2) coats of a washable white paint from 5 feet to the underside of the roof deck. C. All exterior steel shall be galvanized. D. All guard posts shall be galvanized. E. All truck parking spaces at the truck dock shall be striped with three (3) coats (minimum) of yellow highway grade paint. F. All trailer drop spaces shall be striped with three (3) coats (minimum) of yellow highway grade paint. G. All trailer drop spaces shall be identified with a 24-inch-high number. The numbers shall be painted with three (3) coats (minimum) of yellow highway grade paint. Americold will provide numbering system. H. Automobile parking spaces shall be striped at each automobile location with two (2) coats (minimum) of highway grade paint. Handicap accessible parking shall be clearly delineated. I. All exposed ammonia piping, included in scope of project, shall be primed with a Sherwin Williams rust inhibitor, and painted with two (2) coats of Sherwin Williams’ industrial exterior paint. J. All the piping should be labelled according to the following color code chart. P a g e | 43 P a g e | 44 Chapter 9 SPECIALTIES 9.1 Specialties – General A. Toilet partitions panels shall be floor-mounted with stainless steel finish. (No ceiling-hung systems are permissible). The toilet partitions shall be installed complete with doors, latches, coat hooks, bumpers and roll paper holders. AMERICOLD may opt to supply paper and towel dispensers, and this will be decided by AMERICOLD Construction Manager. Embossed finish is preferred of flat. Urinal modesty panels are to be at least 3’ B. Restrooms shall be equipped with Excel high air velocity, wall-mounted hand driers with stainless steel aluminum diamond plate deflectors (Dyson Blade hand drier), contractor is to install paper towel and toilet paper dispensers supplied by AMERICOLD. C. Install Kohler Steward Hybrid High Efficiency urinal ¾” top spud model number 5244-ET-0 for Men’s restroom. D. Install one (1) soap dispenser per wash basin. (dispenser supplied by AMERICOLD) E. Install a 16 inch wide x 20 inch high mirror in all single occupant restrooms. Install a mirror the full length of the wash basin counter in multi-occupant restrooms. F. Install one (1) stainless steel sanitary napkin dispenser receptacle provided in all ladies restrooms. G. All eye wash / showers located in temperature-controlled areas shall be supplied with tempered water in compliance with OSHA specifications. The General Contractor shall pressure wash all walls, steel, racking and floors, etc. before turning the facility over to AMERICOLD. P a g e | 45 Chapter 10 10.1 EQUIPMENT Equipment – General A. The AMERICOLD Construction Manager shall approve the selections of the hydraulic or vertical dock levelers, dock seals, rail shelters, and swing arm loading lights, etc. for the Project. The General Contractor shall provide the AMERICOLD Construction Manager with a delivery schedule for this equipment. B. The General Contractor shall be responsible for the unloading, storage/protection (rust), storage and installation of the levelers, seals, shelters, and loading lights. The General Contractor shall be responsible for seating the levelers in the pits. AMERICOLD will work with the General Contractor to schedule installation. C. The General Contractor shall install the number and type of fire extinguishers required to comply with the local fire department regulations. The AMERICOLD Construction Manager and local Fire Inspector shall approve the fire extinguisher types, sizes, and mounting locations. Fire extinguishers in the office area shall be mounted in recessed cabinets in the wall. The General Contractor shall provide AMERICOLD with as-built drawings indicating the location of all fire extinguishers. D. The General Contractor shall install 3D fire extinguisher signs at all fire extinguisher locations. No stick-on signs are permissible. E. The General Contractor install secure poles at two (2) locations on the property for the installation of wind socks. Poles to be mounted on Condenser unit as delineated in paragraph 5.4.C.4. F. All engine room areas shall be fenced with at least one (1) man gate with an emergency exit panic bar (quantity depends on size and/or local code requirements) and one (1) sliding gate for access to the overhead door, if the engine room is separate from the main structure, or has vessels located outside the engine room. G. All mechanical integrity inspections shall be provided to AMERICOLD prior to engine room startup. H. An emergency stop to shut off all power to the engine room shall be provided at the exit door to the Engine Room. Prior to installation, the General Contractor shall submit the equipment design to insurer for review and comment. P a g e | 46 Chapter 11 11.1 FIRE PROTECTION Fire Protection – General A. The fire protection system shall include all design, equipment, material, fabrication and installation, and required testing. These shall include, but not be limited to, valves, sprinkler heads, piping, electrical devices (tamper switches, flow switches, alarm bells, signs, etc.) and a fire pump if required. The General Contractor shall submit all fire system drawings to Global Risk Consultants (GRC) for review, prior to installation, through the AMERICOLD Construction Manager. B. The system shall be designed and installed in accordance with the current requirements of the National Fire Protection Association (NFPA), Uniform Fire Code (UFC), and the requirements of the local fire department and all other authorities having jurisdiction. C. AMERICOLD to approve location of riser room. Any located on an interior wall shall comply with NFPA 24 and the International Building Code (IBC) Chapter 9. Riser rooms shall never be located inside of a freezer. D. Any and all conduit related to the fire sprinkler system is to be red. E. An air compressor with a regenerated air supply system and air drier shall be installed at each riser group. The AMERICOLD Construction Manager shall approve the type and installation location. Galvanized pipe shall be used for all dry pipe and pre-action sprinkler systems, and in any area where moisture will form. F. A tee connection with a removable cap shall be installed on the warm side of every penetration into an area of different temperature, to allow for easy visual inspection. G. All Nitrogen charged systems shall have a low-pressure alarm switch on the back up bottles be equipped with an air compressor piped to back up the Nitrogen. H. The General Contractor shall contact local authorities to establish whether or not the Municipal water source is capable of supplying volume and pressure, based on the demands of the fire protection systems. I. The Fire Protection Contractor shall be responsible for the scheduling and completion of all related inspections and testing. The AMERICOLD Construction Manager shall be notified in advance of any inspections and testing. J. All freezer areas shall be protected with a dry double interlock pre-action Quell (or equally approved) fire protection system. The sprinkler system shall be designed to accommodate the height of storage and commodity hazard classification, and should be configured to avoid the installation of in-rack sprinklers, wherever practicable. K. All sprinkler piping that penetrates a (freezer or cooler) wall must be insulated and heat traced 4’ on each side of the penetration with a heat trace indicator light and labeled. PVC jacket must be red. P a g e | 47 L. The truck dock shall be protected with a dry pipe system capable of protecting an 8-foot-high pallet floor storage, and for pallet storage in racks over dock doors per current NFPA 13, IBC Chapter 9 and / or FM Data Sheet 8-24. M. Double interlock systems shall incorporate the use of Protectowire or equally approved (by AMERICOLD) linear heat detectors with associated release panels. N. The office, engine room, Motor Control Center (MCC) room, maintenance shop and battery rooms shall to be protected by a wet system per current NFPA-13. The riser may be located in the storage room off the engine room. O. The pre-action valves and associated control / releasing panels shall be located at each pump house and valve riser room. P. All risers in cool areas shall be enclosed with an insulated metal panel room, equipped with a heater and thermostat, exterior light alarmed for non-functioning heater or low room temperature, and heater or temperature fault alarm tied to the control room panel, lighting to 25 foot candles, and a floor drain. Q. All wet pipe for office areas being fed from risers in cool area, i.e. the dock, shall have Heat tape installed. Each heat trace shall be equipped with an indicator light to verify that it is operational. R. All system drains shall be piped into the sanitary sewer, to the exterior. S. General contractor engineer shall determine fire water storage tank size for fire protection equipment without consideration of any tank refill rate. T. The Fire Protection Contractor shall be responsible for all use and tap fees, meters, meter vaults, etc. required in order to install a complete, approved project. U. In accordance with civil planning and local jurisdiction requirements, fire hydrants shall be located around the perimeter of the property, spaced at an interval of approximately 300 linear feet apart. The fire main supplying fire hydrants and sprinkler system lead-ins shall be looped. Valving for fire hydrants, sprinkler systems and the fire main shall be provided to minimize the impact of an impairment to the fire system. V. All underground fire main piping shall be fabricated of cement-lined ductile iron, with mechanical joint fittings. Thrust blocks shall be included as an extra measure to prevent underground breaks. All fire hydrants and other fire protection equipment exposed to vehicular traffic should be protected by reinforced bollards or equal equivalent. W. Fire department access doors shall be installed as required by the authority having jurisdiction. X. Fire pump rooms located within the main building shall be of minimum one hour fire-rated construction, and shall have exit door to the exterior. AMERICOLD prefers pumps to be powered by diesel or a double electric feed. Y. If required by local jurisdiction requirements, smoke detectors shall be installed in all separate areas of the office and break room areas. Z. The General Contractor shall provide all required signage and marking systems, in compliance with the requirements of NFPA 13 and IBC Chapter 9. P a g e | 48 AA. The General Contractor shall install one UL listed Lock Box and Lock. The Local Fire Department shall determine the location of the Lock Box. BB. Each group of risers shall be equipped with a sprinkler head box wrench. CC. The General Contractor shall be responsible to coordinate the Fire Protection Contractor and Electrical Contractor to ensure that all power, control, and signal wiring required for complete installation of the system is included in project. DD. The AMERICOLD Construction Manager shall approve the location of the fire pump house and all system isolation valves, fire plugs, etc. EE. General contractor engineer shall determine fire pump sizing for fire protection equipment. FF. The General Contractor shall install all fire and life safety equipment required by the local Fire Marshall. GG. The General Contractor shall install any additional sprinkler heads required by local or state codes. AMERICOLD shall sign for those heads to ensure a record of receiving. HH. The Fire Sprinkler Contractor shall provide AMERICOLD with a written SOP on the emergency shut down and operation of the fire sprinkler system, which includes reporting the incident(s) to Global Risk Consultants (GRC). II. The Fire Sprinkler Contractor shall all valve tag all fire sprinkler systems, and provide a P&ID drawing to AMERICOLD. The valve tags shall be approved by AMERICOLD. Laminated copy of P&ID to be included in close out documentation. JJ. The Fire Sprinkler Contractor shall spend one (1) day training all AMERICOLD maintenance personal on operation of the system. KK. All sprinkler pipe penetrations from one temperature zone to another temperature zone shall be insulated and PVC jacketed (Red) 4 feet on each side of the wall with one continuous length of insulation. No breaks at the wall will be accepted. The insulation shall be approved by AMERICOLD. LL. The fire sprinkler contractor can use black steel sprinkler pipe in lieu of galvanized sprinkler pipe. MM. The General Contractor shall install one (1) horn, one (1) red strobe for fire, one (1) orange/yellow strobe for weather, and one (1) blue strobe for ammonia alarm in the each office, welfare area, truck dock, and freezer/cooler. All Life Safety rules, as prescribed by the AMERICOLD Safety Department, must be followed. Expansion projects to include alternate to bring existing building to current specification. All alarms to be tied together. Chapter 12 12.1 PLUMBING Plumbing – General A. Hose bibb connections with anti-siphon fittings shall be provided in the following areas: P a g e | 49 1. The Battery Charging Room 2. The Maintenance Shop 3. On the roof, near the condenser (protected against freezing) 4. Outside, near the trash compactor. 5. Outside the office area for wash down, and landscaping irrigation. B. One (1) hub type condensate drain is required per the air unit on the truck dock. The drain traps shall be installed above the floor and curb. Heat tape shall be installed by the Plumbing SubContractor. Each heat trace shall be equipped with an indicator light to verify that it is operational. C. Water closets shall be equipped with auto flush valves (valves shall not obscured by the toilet seat). Tank type toilets are not permitted. A floor drain will be in each water closet. D. Battery Changing room, where applicable: a. Install a 4 inch wide trench drain and steel grate in the center of the Battery Charging Room. The trench drain shall be connected into the acid neutralizing pit. Location of drain must be approved by AMERICOLD. b. The steel grate shall be heavy duty, to withstand forklift traffic. c. Specify trench drain to be Aquaduct, Inc., ACCO, PolyDrain, or equal approved by AMERICOLD. d. The acid neutralizing pit shall be located in the corner of the Battery Charging Room, and shall be equipped with a large access cover for cleaning. E. Eye wash stations, where applicable: a. An emergency eye wash station and shower shall be installed in the Battery Room or Battery Charging area. AMERICOLD shall approve the exact location. b. Install two (2) emergency eye wash stations in the Engine Room – one (1) shall be located inside the engine room and one (1) outside the engine room in the Maintenance Shop or on the truck dock. Eye wash shall meet OSHA requirements and have warm water on demand. c. All eye washes shall be connected into a hub drain. F. Engine room, where applicable: a. The Plumbing Contractor shall install a 2-inch diameter water line to all condensers for the Refrigeration Contractor. The connection shall include a back-flow preventer and a pressure regulator. b. All plumbing requirements to and from the condenser for chemical treatment, shall be installed by the General Contractor. G. Office / Welfare areas that contain a conference room will include separate male and female water closets. Office areas without a conference room can have a single unisex water closet with the written approval of the AMERICOLD Construction Manager. P a g e | 50 H. The janitorial closet shall have a floor mop sink with hot and cold water. I. The low oxygen system room, if equipped, will have a drain installed near the equipment. Chapter 13 13.1 HVAC Office / Welfare Areas A. Restrooms and locker rooms shall be ventilated at the rate of four air changes per hour and ducted to the outside. The electrician shall wire the ventilation system with the lights for restrooms, and with separate switches for all other areas. B. All HVAC units shall be controlled by 7-day programmable thermostats. C. Install wireless multipoint energy sub-metering at all HVAC systems. D. All roof mounted HVAC equipment to be fixed to structure via steel or composite curb. No wood curbing or setting of equipment on "sleepers". Sealing of curb by roofing contractor. 13.2 Battery Rooms A. Battery Rooms shall be heated with electric heat, sized to maintain 60 degrees Fahrenheit, which is controlled by the Engine Room computer. The control of the heater shall be coordinated with the Refrigeration Contractor. If the room more than 20 feet tall, the General Contractor shall install at least one (1) industrial High velocity -type ceiling fan to circulate heated air. B. Battery Rooms shall be provided with a ventilation system sized to provide six (6) air changes per hour, with a minimum of 10,000 CFM. Fresh air shall be brought into the Battery Room through an intake with automatic dampers that are only open when the fan is in operation. (Fan and all equipment required for installation shall be supplied by the Mechanical Contractor). C. Ventilation control shall be as follows: 1. A “hand,off,auto” selector switch shall be mounted in the battery Room. 2. When the selector switch is in the Auto position, it shall be controlled by the refrigeration control system computer on room temperature. 3. The hydrogen detector must cycle the fan motor when the gas level reaches the low level alarm position, no matter what the position of the selector switch. (The hydrogen detector shall be supplied, and its location determined by the Refrigeration Contractor, and installed by the Electrical Contractor). 4. A Resistive Temperature Device (RTD) shall be supplied and installed by the Refrigeration Contractor, to sense the room temperature. D. All battery rooms are to have a Stonehard or equivalent finished floor. (Consult project team for approval) P a g e | 51 13.3 Engine Rooms A. All engine rooms shall be equipped with a redundant fan backup or backup generator to the ventilation system. B. Ventilation fans shall be Greenheck Model RBUMO or equal approved with the motor out of the airstream, equipped with non-sparking blades. C. All emergency ventilation fans shall have electrical current transducers installed that are monitored by the refrigeration control panel, which will give an alarm if the fan fails due to motor failure or a broken belt. Emergency ventilation shall be provided at a rate of 20,000 cfm or 10 cfm per square foot of room area (whichever is larger), and shall be initiated by an approved NH3 detection system set to alarm at 25% LEL. D. All ventilation inlet louvers shall be configured to fail open. E. Continuous fan shall be Greenheck or equal approved – equipped with a motion sensor to turn on when someone enters the room. The fixed, continuous, mechanical ventilation shall be provided at a rate of 1 cfm / square foot of room area, minimum. F. Install wireless multipoint energy sub-metering in Maintenance shop for lighting, HVAC, and Air Compressors. 13.4 Humidity Sensor Install (1) one humidity sensor to each of the following areas – G. Freezers (each room) H. Coolers (each room) I. Automated equipment areas outside the freezer or cooler (each area) J. Truck dock (at least one depending on the length of the dock) K. Rail dock. (at least one depending on the length of the rail dock) L. All humidity sensor readings are to be monitored and displayed on the refrigeration computer Chapter 14 14.1 ELECTRICAL Electrical Service A. The Electrical Contractor shall provide two (2) typed identification sheets for each circuit breaker panel, one stored inside the panel, and one for the AMERICOLD Facility Service Manager (FSM) to file, which accurately identify each circuit. The wording must be specific, identifying each circuit clearly. The sheets shall be approved by the AMERICOLD Construction Manager. B. Preferred suppliers for electrical equipment are - #1 Siemens, #2 ABB and #3 Eaton - Square D products are not allowed to be used on Americold projects” P a g e | 52 C. All electrical panels, Motor Control Center (MCC), starters, and step-down transformers, etc. shall be located in the MCC Room, with the exception of: 1. Battery Charger circuit breaker panels shall be located in the Battery Charging Room. 2. The circuit breaker panel for the offices shall be located in the electrical room unless otherwise approved by AMERICOLD. 3. Step-down transformers located indoors shall be dry type, or shall be filled with a FM approved less- flammable dielectric fluid meeting the requirements of NFPA 70, NEC. All through-wall, through-ceiling and/or through-floor penetrations shall be sealed with approved material. D. Install a 6-inch x 6-inch wire way above and on either side of the RCP. E. The Electrical Sub-Contractor shall provide AMERICOLD with a spare set of fuses for all switch gears, disconnects, etc. that are installed on the Project. F. No transformers are allowed in any finished areas, and none shall be set on the floor in any area. All transformer mounting methods shall be approved by the AMERICOLD Construction Manager. G. Main transformers located outdoors should be filled with a FM Approved less flammable dielectric fluid in accordance with the National Electrical Code (NFPA 70) or shall be sited per FM Data Sheet 5-4 guidelines. H. All main switchgear shall be sized for 25% spare capacity. Refer to Refrigeration Contractors load data sheet included with the bid package. All main switch gear shall be braced at a minimum of 100,000 AIC (available fault current). Load calculations shall be included with the final As-Built drawings. I. The building shall be supplied with an emergency generator. The generator, switchgear, and all other supporting equipment shall be sized to support, at a minimum, emergency lighting, the IT server power requirements, two outlets in dock office, one outlet in GM, office manager and maintenance offices the refrigeration computer, and the low oxygen system control panel (if equipped). Load calculations shall be included with the final As-Built drawings. The Electrical Sub-Contractor will coordinate with the General Contractor on providing a recommendation for the generator to the AMERICOLD Construction Manager. J. The emergency generator will provide power to the allocated systems within 10 seconds of an outage. K. The building shall be supplied with a generator docking station suitable for quick connection to a portable generator sufficient to maintain full electrical service to the facility in the event of a prolonged outage. The docking station should be equipped with “Kirk Key” access (or similar device) to prevent back-feeding utilities or improper connections. Provide as alternate on facility expansion projects. L. The Electrical Sub-Contractor shall provide a one line drawing with the final As-Built drawings that meets OSHA arc flash requirements for the entire facility. P a g e | 53 M. Electrical Conduit: 1. All electrical conduit installed on the roof or exterior building structure, or exposed to physical damage shall be fabricated with galvanized rigid steel. 2. All electrical conduit installed below the floor slab shall be fabricated with PVC, with an equipment grounding conductor sized in compliance with NEC article 250 (Grounding). 3. The use of EMT conduit with steel compression type fittings is approved for all areas inside the facility. The use of die cast fittings is not permitted. 4. All electrical conduit penetrating through a wall into a different temperature zone shall be fabricated of PVC and installed as detailed in Section 15.6 with a seal off on the warm side. 5. Type MC Cable may be used in concealed areas. N. Install type THHN/THWN wiring rated for 600 volts, except outdoors, in freezer areas or in wet and damp locations, in which case type XHHW wiring rated for 600 volts shall be installed. O. All electrical wiring shall be stranded copper. No solid wire shall be permitted. P. Install liquid-tight flexible conduit for connections to vibrating and rotating equipment, and in wet or exterior locations. Q. All switchgear and floor mounted electrical equipment to be located on a 4-inch concrete housekeeping pad slightly larger than the equipment. The pad must have beveled edge. R. Install distribution, lighting/receptacle panel boards with bolt-on circuit breakers. S. Install distribution panel boards with a 10% (minimum) spare breaker/switch capacity at the end of the Project. T. Install lighting/receptacle panel boards with a minimum rating of 100 amps and a minimum of 30 poles or 10% spare breaker capacity, whichever is greater. U. The equipment layout in the Motor Control Center (MCC) room shall allow for the installation of future MCC, Compressor starters, electrical panels, etc. Layout to be approved by AMERICOLD V. Where an electric fire pump is installed, a separate electrical feed shall be provided for the pump. General contractor shall install a fire pump acting as a backup system that can relieve the primary systems in the event of failure. W. Lightning protection shall be installed on the exterior at the highest point of the building. Additional protection shall be assessed for warehouses with large automation systems and presented to the AMERICOLD Construction Manager. 14.2 Lighting A. General 1. All lighting in office and welfare areas shall be controlled by 360 degree motion sensors. P a g e | 54 2. All interior and exterior lighting shall be LED, unless otherwise specified by AMERICOLD. All fixtures shall be controlled by motion sensors. Fixture types shall be approved by AMERICOLD prior to installation. 3. All light fixtures in freezers, coolers, truck docks and rail docks shall be suspended between the roof joists and shall not protrude below the joist. The Electrical Contractor shall coordinate with the steel fabricator and sprinkler contractor to establish the maximum fixture length and location. 4. All light fixtures shall be attached with hooks for easy removal, and shall be provided with a plug and twist-lock receptacle and safety chain. If a flexible wiring system is used, it shall be designed with a disconnecting means at each fixture, so a fixture can be removed without interrupting the circuit. 5. All lighting for freezers, coolers, truck dock and rail dock shall be controlled by latching contactor relays. 6. Light switches for the freezer, cooler, truck dock and rail dock shall be located near the entrance door to the truck dock, near the office. Each of the above-mentioned areas shall be individually switched. 7. Light switches in the office / welfare areas, Battery Room, Maintenance Shop, MCC Room, and Engine Room shall have 360 degree motion sensor switches. 8. All light fixtures shall have a clear prismatic refractor with bottom lens cover (no glass). 9. Install a complete exterior lighting system for all parking lots and roadways. This shall be accomplished by the use of building-mounted and pole-mounted fixtures producing a minimum of three foot-candles average over all paved areas. Light poles to be set back 15" from edge of curb. 10. Install security lighting around the perimeter of the building, with the light fixture spacing not to exceed 120 feet on center. The illumination level shall be 3 to 5 foot-candles. 11. All exterior light fixtures shall be LED unless specified otherwise by AMERICOLD. Provide an exterior lighting plan with the bid submission. 12. Install LED emergency exit signs, equipped with two-head emergency exit lights. 13. Emergency lighting will tie-into the emergency generator in the event of a power outage from the main distribution network. 14. Install wireless multipoint energy sub-metering including 4 subsystems (Freezers, Docks, Offices and Outside & truck lot). Duct B. Freezers / Coolers 1. Freezer / cooler aisle lighting shall be designed to provide a minimum illumination level of 25 foot-candles at five feet above the floor minimum, not average. Install LED fixtures with prismatic refractors and bottom lens (no glass). Light fixture spacing shall not exceed 25 feet on center. 2. One light fixture per aisle (in the middle) shall be equipped with a Quartz re-strike feature and tied to life safety egress. P a g e | 55 3. One light fixture near each freezer / cooler opening shall be emergency-circuited, and shall remain and on at all times. 4. Individual lighting circuits in freezers / coolers shall run perpendicular to the aisles. 5. Install wireless multipoint energy sub-metering. C. Truck Docks and Rail Docks 1. Lighting systems for truck docks and rail docks shall be designed to provide a minimum illumination level of 30 foot-candles at five feet above the floor minimum, not average. Install LED fixtures with prismatic refractors and bottom lens (no glass). Light Fixture spacing shall not exceed 25 feet on center. 2. Two (2) rows of light fixtures shall be installed on truck docks, and one row (minimum) on rail dock. 3. Two (2) light fixtures on truck docks and two (2) light fixtures on rail dock shall be emergency-circuited, and shall remain and on at all times. 4. The Electrical Sub-Contractor shall supply and install a hook, cord, plug, safety chain and twist lock receptacle on each light fixture. 5. Install wireless multipoint energy sub-metering. D. Engine Room / Maintenance Shop / Battery Room / MCC Room 1. Lighting systems for engineering support spaces shall be designed to provide a minimum illumination level of 30 foot-candles at five feet above the floor. Install LED fixtures with prismatic refractors and bottom lens (no glass). Light Fixture spacing shall not exceed 25 feet on center. 2. Install wireless multipoint energy sub-metering in Maintenance shop including 3 subsystems (Lighting, HVAC and Air compressors). E. Exterior Lighting 1. One LED light fixture shall be mounted near the condenser with an On-Off switch mounted on the condenser (location to be approved by the AMERICOLD Construction Manager). 2. All exterior light fixtures, except the one on the condenser (point 1 above), shall be controlled by a master timer located in the MCC Room (no photo eyes shall be permitted), unless otherwise approved by AMERICOLD. 3. All exterior light fixtures shall be mounted as close to the top of the building exterior wall as possible, except for high-bay ASRS buildings. ASRS building lighting should be mounted in similar height as other low-bay areas. 4. All Truck Lots shall have pole mounted LED fixtures to supply an adequate level of security lighting. 5. Install wireless multipoint energy sub-metering. P a g e | 56 14.3 Power, Control and Signal Wiring A. Install (at a minimum) the following 115-volt electrical outlets: 1. One (1) quadplex receptacle located between every 4th truck dock door. 2. add outlets for IDF boxes. (Get Americold IT approval for IDF locations) 3. One (1) duplex receptacle adjacent to each rail dock door. 4. One (1) duplex receptacle at each emergency /exit door in the facility 5. Two (2) duplex receptacles in the Battery Charging Room, if applicable. 6. One (1) duplex receptacle on the roof, near each control valve group, for ammonia based installations. 7. Two (2) duplex receptacles on each condenser, for ammonia based installations. One (1) duplex receptacle on each packaged condensing unit for non-ammonia installations. 8. Two (2) dedicated outlets (where applicable) on the truck dock per stretch wrap machine (location to be determined by the AMERICOLD Construction Manager). 9. Any and all conduit related to the fire sprinkler system is to be red. 10. One (1) duplex receptacle for each evaporator, on a dedicated circuit, to be used for powering the heat tapes. 11. Dedicated circuit for each microwave, refrigerator, and vending machine in the break room. 12. One (1) duplex receptacle in the break room for each industrial glass faced slide door refrigerator. 13. One (1) quadplex receptacle will be mounted in the floor of the conference room. The junction box will be flush mounted with the floor and accommodate data connection wires as well. 14. WI-FI outlets shall be installed in a NEMA Box with an access heater, supplied by the WI-FI Vendor and connected by the Electrical contractor. the NEMA Box shall be installed on the underside of the roof deck and include: One (1) quadplex outlet on a dedicated circuit, on the truck dock One (1) quadplex outlet on a dedicated circuit, on the rail dock Two (2) quadplex outlets on a dedicated circuit, in each freezer / cooler B. Install (at a minimum) the following 480-volt, 3-phase, 50 amp welding outlets: 1. One (1) on the truck dock. 2. One (1) in each freezer / cooler. P a g e | 57 C. Electrical for Battery Charging (480 volt): AMERICOLD shall identify if the system is a normal charging system or a quick charge system. 1. The Electrical sub-contractor shall supply and install all twist lock receptacles and male plugs required to install battery chargers. 2. The location of the battery charger service shall be field verified by the AMERICOLD Construction Manager. 3. Battery Chargers require a 480 volt, 3-phase, . 4. Where installed, automatic battery changers require a 480 volt, 3-phase, 20 amp service. 5. Where installed, quick charge systems require a 480-volt, 3-phase service with one disconnect per charger. Amperage depends on the type of battery charger. 6. Install wireless multipoint for both battery chargers and battery changers. D. The Electrical Sub-Contractor shall provide a dedicated 115 volt, 20 amp service to each of the fire protection panel E. Surge/voltage and phasing issues (such as single phasing) protection is required at the main switchgear for all buildings. In automated builds, all automation panels should also be protected (in addition to protection at switchgear). F. Where insulated wall panel vestibules are constructed, the control panels for the doors shall be installed approximately 5 feet above the curb inside the vestibules, In line with Americold construction manager approval. G. Freezer doors shall be wired in accordance with Section 8 of this guideline and the factory schematics. The Electrical Sub-Contractor shall be responsible for arranging start up with the door supplier and installer. H. Where applicable, provide a 480 volt, 3-phase, 20 amp service for pallet inverters. I. The Electrical Sub-Contractor shall install the following refrigeration system items (supplied by the Refrigeration Sub-Contractor): 1. Manning Ammonia or Draeger Ammonia Detectors shall be installed in the engine room and all final use points. The AMERICOLD Construction Manager shall approve the location of the sensors. 2. Temperature sensors. 3. Control wiring to refrigeration valves; refer to the Refrigeration System Guideline Specifications and Performance Specifications for additional information. J. The Electrical Sub-Contractor shall provide electrical service and control wires to the electric unit heaters and exhaust fans in the Battery Charging Room. K. All condensers shall be equipped with Variable Frequency Drives (VFDs). L. The General Contractor shall supply and install all electronic latch assemblies, conduits, boxes and pull strings needed for the AMERICOLD pass card system to be installed by AMERICOLD (average of 10 doors per facility). P a g e | 58 M. The General Contractor shall create all penetrations for conduits for IT equipment and security system equipment, in accordance with Section 17. N. Install wireless multipoint energy sub-metering at all panels providing power to automation subsystems. O. Design backup power systems to support critical functions of building for at least 48 hours. P. The backup generator is to be sized to supply power to the following areas – 1) Full IT room 2) Full Shipping Receiving office (Outlets and at least 2 light fixtures) 3) All emergency lighting 4) Maintenance office only outlets. 5) Refrigeration control system 14.4 Dock Levelers and Dock Doors A. AMERICOLD prefers vertical dock levelers equipped with a full control panel and safety interlock system located at each dock door. B. Levelers must be capable of 50,000-lb capacity. C. The Electrical Sub-Contractor shall install a limit or proximity switch on the overhead dock door to prevent the hydraulic levelers from operating if the door is not fully open. This is on pit levelers only. D. The Electrical Sub-Contractor shall provide 120-volt, single-phase, 1-1/2 HP electrical service to each dock leveler. This is on pit levelers only. E. Where installed, rail dock shelters shall be equipped with a 1/5 HP, 115-volt, single-phase fan motor, wired to an On-Off switch installed adjacent to each rail dock door. F. The General Contractor shall supply an alternate price to install motors on all dock overhead doors. 14.5 Underfloor Heat System A. Underfloor heating shall be provided by a Glycol system heated by the refrigeration system, and shall be installed by the Refrigeration Contractor. B. The underfloor heat system shall be charged with food grade propylene glycol. C. For all automated MHE system projects, at all freezer doors, the underfloor heat system and under slab insulation shall extend under the truck dock floor slab for a minimum distance of 15 feet from the face of the IMP wall. D. Install a minimum 1 Resistive Temperature Devices (RTDs) to monitor floor temperatures every 25,000 square feet The RTDs shall be monitored by the refrigeration control system. E. Glycol manifold shall be protected with removable galvanized miscellaneous steel. P a g e | 59 14.6 Electrical - General A. All conduits that pass through a wall, floor, or roof into an area of a different temperature shall be PVC and must be seal with an approved seal -off fitting on the warm side (Seal must be approved by construction manager e.g. ducted seal or fire rated foam). No box, wire-way, or fitting shall be installed on the conduit immediately at the wall, floor, or ceiling, be installed set back a minimum of 4 feet on both sides, so the conduit can be insulated if necessary. All junction/ pass throughs must be sealed with approved seal (I.E ducted seal or fire rated foam) Cable or wire over 100 feet length shall be megger tested. B. No Conduit shall connect to circuit breaker panels, MCC, etc. at the top. Connections shall be made shall into the sides or bottom only in accordance with NEMA 4 level protection. C. No conduits, boxes or other electrical can be laid in the roof decking flutes and covered by the roof insulation. All electrical conduits, boxes must be attached to the joist using beam clamps. No screwing into the decking from the underside. D. The Electrical sub-contractor shall install flexible seal-tight conduit to the box on each solenoid coil. The box shall be provided by the Refrigeration Contractor. E. All motors shall have a section of flexible seal-tight conduit connecting them to electrical metal tubing, or to rigid conduit. F. No conduit shall be run under the floor slab without the written approval of the AMERICOLD Construction Manager. G. Electric heaters shall be installed in the facility. The heat shall be controlled by the refrigeration program and the Resistive Temperature Device (RTD) in the engine room shall be mounted 6 feet above the finished floor. The following heaters shall be installed: One (1) 15 KW in the Battery Charging Room One (1) 15 KW in the Engine Room H. The Electrical Sub-Contractor to install engraved phenolic nameplates on the exterior of all disconnects, starters, circuit breakers, panels, etc. The nameplates shall include panel numbers and voltages. I. The Electrical Sub-Contractor shall label each conductor on the interior of any control panel with Brady wire markers. Each marker shall correspond with the electrical drawings and shall be marked on each end of the wire. J. No conduit shall be attached to the storage rack system, unless approved in writing by the AMERICOLD Construction Manager. K. The Electrical Sub-Contractor shall provide and install all power and control wiring for the refrigeration systems. The Refrigeration Contractor shall provide all starters and control devices, to be installed by the Electrical Sub-Contractor. L. All docks, freezers, coolers, offices and maintenance areas shall be equipped with at least one (1) audio and visual ammonia alarm that is tied back to the refrigeration control panel as outlined in paragraph 15.3.H. P a g e | 60 M. All refrigeration control systems must be capable of being installed on the AMERICOLD network. N. All electrical panels shall comply with all OSHA arc flash requirements and standards. O. All heat trace on air units and condensate lines shall have resistive temperature devices (RTDs) installed and monitored by the refrigeration control system. P. All air units shall have a RTD at the inlet and outlet sides of the air units, and these shall be monitored by the refrigeration control system Q. The refrigeration control system shall be continuously monitored either by plant personnel or remotely. R. Security system and camera are to be installed by GC following AMERICOLD spec’s which will be supplied by Rick Stevens. AMERICOLD will help develop a security drawing and will supply vendor that are allowed to bid the project. S. Preferred suppliers for electrical equipment are - #1 Siemens, #2 ABB, #3 Eaton - Square D products are not allowed to be used on Americold projects” Chapter 15 MDF/IDF and station Construction. 15.1 Server/Main Distribution Frame (MDF) Room Construction A. MDF’s will be twin four post cabinets that are 2-foot wide and 4-foot deep. A. Alternative is single two post rack for small sites. B. Front, rear and one side must have a minimum of three-foot clear passage to access the equipment safely. B. The minimum room size is 10-foot by 10-foot. A. Alternate for small sites (single cabinet) eight feet deep by six feet wide, door on the six-foot wall, TELCO terminations on the rear six-foot wall. C. Standard Americold installation of telco board around the room with electrical duct with a minimum of two separate 125v/20a circuits. From the back wall two 125v/30a L5-30 receptacles at 16-inch AFF. P a g e | 61 A. D. E. F. G. H. Alternate for small sites replace the two 125v/30a with two 125v/20a with standard 5-20 NEMA receptacles. B. If the rack is more than four feet from wall run power into cabinet or side of rack. Sites with life-safety generator back up units will have the outlets on those circuits using the specific outlet color found in state or local community building standard: typically, red or orange. Ground bar tied to building ground above or below conduits for telco service from the pedestal at the road. Where possible the outlets should be installed in the cabinet or adjacent to the rack. Telco service conduits should be dual 4-inch with sweep elbows [24-inch radius] or pull boxes, with no more than 360-degree of bends between pull boxes. Conduit needs to be below the local freeze line and 12-inches below the subgrade for paved parking / driveway areas. If the MDF’s are in active construction sites a minimum 750cfm HEPA air scrubber filtration units. P a g e | 62 I. J. IDF cabinets should be mounted at an accessible level like 2-foot AFF but no more than 11-foot AFF so it can be serviced with a 10-foot ladder. Note – This scope is under the GC only if this room is on the dock and we are not dried in. Preferred IDF – (or similar) A. Hoffman type EWxx2430 24” wide, 24” deep, and 12, 19, or 26 U high. P a g e | 63 B. Or Great Lakes WD series 24” wide, 32” deep, and 11, 18, or 25 U high K. IDF’s require two 125v/20a circuits. They can be provided in a single quad box with the circuits sourced to the individual NEMA 5-20 duplex outlets. One to each UPS. One from the odd numbered breaker and one from the even numbered breaker. L. The walls and ceiling will be constructed of IMP interlocking paneling and also installing an FM 200 system. M. MDF rooms FM 200 fire system must be tied into the fire sprinkler system to the fire department. N. The IT Room door will be insulated, airtight sealed (with kick plates on both sides, door closer and latch type handle) to keep out dust and maintain temperature. O. All electrical in the room must be on generator backup if one is part of the site’s design. P. The following items are required for new IT room: A. LED lights (motion sensor controlled) adequate to work in the cabinets. B. Static free VCT tiles C. Wire mold around the room (5) 125V circuits D. 30 KW generator (Larger if equipment being used requires it) only if site requires one. Note – This scope is under the GC E. Transfer switch F. Generator pad G. Electronic latch on the door for pass card system H. ¾” fire retardant plywood on the walls (3’ off the floor turned vertically and painted white) P a g e | 64 I. All wiring and cables are to be run in cable trays. J. Security camera K. Smoke sensor L. Red conduits fire sprinkler system Q. Four (4) of the EZ-path 44+ shall be installed in the ceiling for all cable penetrations (see cut sheet). R. Cut sheets on the APA 4800 raceway and the UPS plug and receptacle. S. An HVAC system shall be supplied to maintain temperature in the room. Size should be determined during the design session with the AMERICOLD team but should be 2 to 3 tons depending on the load with a remote control and a digital thermometer on the wall. A. Automated warehouse MDF room will require 3–5-ton unit. Note – This scope is under GC. B. Sites rooms containing servers shall require 5 tons. Note – This scope is under the GC C. Sites without servers should have a “return” register in the room but not a “supply” register so it does not pump hot air in the room during the winter. Note - This would be if we need to move the MDF room as we are building on to another building. 15.2 Office/Welfare Area Construction A. The data connections in the conference room will be mounted in a flush junction box in the floor. The box will be aligned to be placed underneath the conference table. B. Data drops shall be supplied for all office areas, subject to a design session with the AMERICOLD team. C. Every effort should be made for data and electrical supply outlets are accessible and not behind the planned furniture. P a g e | 65 P a g e | 66 15.3 Warehouse/Dock Components A. Electrical power shall be installed in accordance with section 15.3.A.12. Note – This scope is under the GC under Americold Construction Manager supervision. B. Conduit shall be run to all Intermediate Distribution Frame (IDF) locations, parallel to the electrical conduit. a. The minimum bend radius for conduit containing copper cabling is 1 inch. b. The minimum bend radius for a conduit containing fiber optic wire is 6 inches. C. Production area terminations will be into a “biscuit box” with keystone connectors. D. Wireless access points (APs) shall be installed in a Ventev VNV-CB3702-AC NEMA 4 Box with an access heater and connected by the Electrical Contractor. [Unless ruggedized APs are provided] E. Intermediate Distribution Frames (IDFs) shall be installed in a NEMA 4 box with an access heater and connected by the Electrical Contractor, if installed in the freezer/cooler. F. The IDF shall be installed on a 4 foot by 4 foot, ¾-inch thick fire-rated plywood wallboard. The wall board will be mounted at least 40 inches from the floor at the base for the Main Distribution Frame (MDF). Intermediate Distribution Frames (IDF) will be mounted at no more than 11 feet from the floor at the base in the dock and freezer/cooler areas. Note – This scope is under the GC. G. Each IDF box shall include two (2) 1=20amp/120volt on a dedicated circuit, duplex outlets can be in a single quad box. 15.4 Hardware A. All IDF switches will be connected via dual fiber/copper and configured as port-channels. a. Fiber preferred over copper; however, copper may be used for distances under 550feet, using Superior Essex 22 AMG cable, and when gbic slots are not available. b. NO CABLE MANAGEMENT TO BE USED IN IDFs B. UPS backups will be supplied by AMERICOLD or other parties. a. Thirty amp for servers b. Twenty amp for MDF switch or large IDF. c. Fifteen amp for standard IDF C. SOW for new sites and retrofits will include rack and cabinet drawings with proposed equipment layout. P a g e | 67 P a g e | 68 P a g e | 69 P a g e | 70 D. MDF MDF 45 45 44 A C B D 44 43 4U FIBER 43 42 A C B D 42 41 41 40 40 39 39 38 38 37 2U SDWAN/VELO on Shelf 2U WIRE MANAGEMENT 37 6 1 36 2 3 1 SYST RPS STAT DPLX SPEED PoE 2 3 4 4 5 6 5 7 8 6 9 10 11 7 12 1X 2X MODE POWER 1 35 SYST RPS STAT DPLX SPEED PoE OVER 2 ETHERNET 3 4 5 6 7 8 9 10 11 2X 34 OVER 15 9 16 17 18 10 19 20 11 21 22 23 12 24 13 25 26 27 14 28 29 30 15 31 32 16 33 34 35 17 36 18 37 38 39 19 40 41 42 20 43 44 21 45 46 47 22 23 24 Catalyst 2960 Series PoE-48 48 23X 25X 35X 37X 47X 14X 24X 26X 36X 38X 48X 11X 13X 23X 25X 35X 37X 13 12X POWER 14 13X 12X 12 1X MODE 8 13 11X 1 2 3 4 36 740W ETHERNET 14 15 16 17 18 19 20 21 22 23 24 14X 25 24X 26 27 28 29 30 31 32 33 34 35 36 26X 37 36X 38 39 40 41 42 43 44 45 46 47 Catalyst 2960 Series PoE-48 48 35 47X 38X 1 2 3 4 48X 740W 34 48 PORT SWITCH 48 PORT SWITCH 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 33 33 32 31 32 1 2 3 1 SYST RPS STAT DPLX SPEED PoE 30 2 3 4 4 5 6 5 6 7 7 8 9 10 11 12 7 8 9 10 11 12 1X 2X MODE POWER 1 SYST RPS STAT DPLX SPEED PoE 29 2 OVER ETHERNET 3 4 5 6 2X 28 13X 12X 14X 11X 13X 12X POWER OVER ETHERNET 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 13 14 15 16 17 18 19 20 21 22 23 24 23X 25X 24X 26X 23X 25X 13 14 15 16 17 25 26 27 28 29 30 31 32 33 34 35 36 25 26 27 28 29 30 31 32 33 34 35 36 35X 37X 36X 38X 35X 37X 18 19 20 21 37 38 39 40 41 42 43 44 45 46 47 48 37 38 39 40 41 42 43 44 45 46 47 48 22 23 24 1 2 3 4 14X 24X 26X 36X 3 48 PORT SWITCH Catalyst 2960 Series PoE-48 47X 38X 1 2 3 4 48X 740W 2 48 PORT SWITCH 29 48X 6 1 30 Catalyst 2960 Series PoE-48 47X 740W 1X MODE 11X 8 2U WIRE MANAGEMENT 31 6 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 28 27 27 26 26 25 25 24 24 23 23 22 22 21 21 20 20 19 19 18 18 17 17 16 16 15 15 14 14 13 13 12 12 11 11 10 10 9 9 8 8 7 7 6 6 5 5 4 4 3 3 2 2 1 1 48 PORT SWITCH SHELF for ShoreTel PDU #2 PDU #1 UPS #2 UPS #1 P a g e | 71 P a g e | 72 E. IDF IDF A C B D 2U FIBER 1U GAP 6 1 2 3 1 SYST RPS STAT DPLX SPEED PoE 2 3 4 4 5 5 6 7 8 6 9 10 11 7 12 1X 2X MODE POWER OVER ETHERNET 8 13 14 15 9 16 17 10 18 19 20 11 21 22 23 12 24 25 13 26 27 28 14 29 30 15 31 32 16 33 34 35 17 36 37 18 38 39 40 19 41 42 20 43 44 45 21 46 47 22 23 24 Catalyst 2960 Series PoE-48 48 11X 13X 23X 25X 35X 37X 47X 12X 14X 24X 26X 36X 38X 48X 1 2 3 4 740W 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 22 23 24 6 1 2 1 SYST RPS STAT DPLX SPEED PoE 2 3 3 4 4 5 6 1X 2X MODE POWER OVER ETHERNET 740W 5 7 8 9 6 10 11 7 12 13 14 8 15 16 9 17 18 19 10 20 21 22 11 23 12 24 25 26 13 27 28 14 29 30 31 15 32 33 34 16 35 17 36 37 38 18 39 40 19 41 42 43 20 44 45 46 21 47 Catalyst 2960 Series PoE-48 48 11X 13X 23X 25X 35X 37X 47X 12X 14X 24X 26X 36X 38X 48X 1 2 3 4 24 PORT PATCH PANEL use 1-23 48 PORT SWITCH 24 PORT PATCH PANEL use 1-23 24 PORT PATCH PANEL use 1-23 48 PORT SWITCH UPS #2 UPS #1 P a g e | 73 15.5 Retirement, decommission, or demolition. A. Retirement, or semi-retirement, is for facilities that are in full or partially handed over to another company. a. NWS will determine if the equipment should be removed or left in-place. b. End of life/support equipment of no real value to Americold can be abandoned if: i. It is not connected to an Americold control system. ii. Can be factory reset. iii. May not include routers or switches. iv. UPS units may remain in place. c. Racks, cabinets, and cabling may be left in place per agreement with new tenant. B. Decommission is where the equipment is replaced by renovation or retrofit. a. Network gear is to be removed and either e-waste or shipped to the facility at NWS discretion. b. UPS units will be e-waste. c. Old cabinets and racks must be removed. d. Cabling must be cut back to the top of the red iron or room from which the MDF/IDF is located. e. SOW for vendor projects will include a process for e-waste disposal. C. Demolition is removal of all gear when Americold exists a building. a. NWS will determine the status of disposal. b. End of life/support equipment of no real value to Americold can be abandoned if: i. It is not connected to an Americold control system. ii. Can be factory reset. iii. May not include routers or switches. c. SOW for vendor projects will include a process for e-waste disposal. d. Racks, cabinets, and cabling may be left in place per agreement with new owner. e. UPS may remain in place per agreement with the new owner. f. NWS or SOW for vendor projects will include a process for e-waste disposal. Chapter 16 Security Systems A. Unless requested, all security hardware (cameras, card readers, control system, and wiring) and installation will be handled by AMERICOLD. Chapter 17 Low Oxygen Fire Prevention System 17.1 Room Construction P a g e | 74 A. If applicable, the Low Oxygen System room will be constructed with all interior walls constructed of IMP. B. All exterior walls will be constructed of masonry as outlined in section 4.1.D, unless insulated metal panels have been approved by AMERICOLD on project architectural plans. C. Access doors will be opened by key card and the security system will track who has entered and how long they are in the space. Chapter 18 Network Cabling Standards All new construction must meet the minimum standards for WAP installation and Network Services Low Voltage Cabling Standards. 18.1 General Guidelines A. All regulatory requirements applicable to the site must be adhered to, including but not limited to, conduit, plenum and fire code. B. If there is a question regarding the project or these guidelines, contact the AMERICOLD project lead for clarification. C. Cables should be run through wire ways when there is an access of cable as required by local codes. D. Prior to installation contactor will review the requirements with the Construction Manager and local site management. Site management will inform contractor of safety and environmental requirements and coordination will be made regarding dates and times of areas where construction will take place. E. Cabling will conform with all state and local codes. F. Copper wiring and all termination points (cable, patch panels, wall outlets, etc.) will be manufacturer certified for use with Category-6 UTP data cabling. G. 6 Strand, armored, multi-mode fiber will be used. H. Fiber cabling will be protected by plastic inner duct. Preferred alternatives are armored fiber or conduit. I. Fiber cabling between patch panels will be twelve strands and terminated into LC type connectors on both ends. J. All work will be performed and overseen by a qualified contractor that has at least four (4) years of experience with cabling installations. Contractors may use less skilled workers to perform “rough” installation (i.e. cable pulls, terminations, support, etc.), but are responsible for the overall quality, workmanship and final product. P a g e | 75 K. All installations will be delivered with six (6) laminated properly marked diagrams (“Rosetta Stone”) showing the location of the station wiring and the corresponding patch panel port. One (1) diagram will be prominently displayed near the cabinet where the cables are terminated. L. Tie wraps will ONLY be used on the structured cable system between the patch panel and the station location. Tie wraps, must not be overly tight. All other cable straps will utilize hook & loop tape (e.g. Velcro) and must allow at least 100% future expansion. E.g. if the circumference of the cable bundle is 2” / 5cm, then 4” / 10cm of hook and loop tape must be used. M. Bright colored ribbon/rope to be hung from enclosures to help them be visible to those operating machinery N. Cabling should be run within walls/ceiling whenever possible, utilize conduit, can’t have messy cabling O. AP enclosures need to be labeled with numbers being large enough to see from the ground P. Record enclosure S/N to associated AP 18.2 Station Cabling A. Wireless access points will receive one (1) network connection B. All non-wireless access point locations will have at least two (2) network connections a. Unless otherwise specified: i. One (1) white cable with corresponding keystone jack of same color ii. One (1) blue cable with corresponding keystone jack of same color b. Install in pairs – If there are three (3) terminations required in a location, install four (4) C. Each cable run must have a 10’ / 3m service loop in the ceiling at the point where the cable starts the vertical drop to the termination point. D. When performing “rough” cable installation, leave 10’ / 3m extra at each end. The individual performing the final termination should cut the cable to proper length to minimize excess cable and distance. E. No copper cable length may exceed 300’ / 90m. This will allow for a 30’ / 10m patch cable at the station end. Consult Network Services when this requirement cannot be met to determine the location of an IDF cabinet. F. The minimum bend radius for copper cabling is 1” / 25mm. G. “Direct terminations” (E.g. RJ-45 male directly on the end of the cable) are not allowed. H. Terminations will be in a manner compatible with the surrounding area and aesthetically pleasing for view. I. Terminations are to be above the work surface and easily accessible. In walled office space, location will be as agreed to with the site contact. J. Wall based terminations will be on dual-port faceplates. P a g e | 76 K. Production area terminations will be into a “biscuit box” with keystone connectors. L. Site management will direct the contractor to locations where environmental protections (e.g. waterproof / NEMA housings) are required. M. Terminations will be professionally labeled in a manner conforming to existing standard for the site, durable and cosmetically appealing so as to make easy visual identification of both ends of the cable. For new installations, we will use a 1A/1B notation with 1A being the top port on the outlet box/faceplate which would be connected to a “top” patch panel. a) “A” Port 1 b) 18.3 IDF/MDF Cabling A. Preferred IDF – Hoffman type XXX B. All MDFs and IDFs where possible, will have a 4’ x 4’ x ¾” / 120cm x 120cm x 20mm fire-rated plywood wallboard mounted conveniently and at least 40” / 1m from the floor at the base. C. All network equipment will reside in grounded metal racks. D. All fiber terminations will terminate into LC type connectors on both ends. Common fiber color order/pairs should be used. E. The minimum bend radius for fiber is 6” / 150mm. F. For new installations on open two-post racks, copper terminations will be on angled 24 or 48port patch panels. G. For installations in MDF/IDF enclosures utilize flat patch panel. Patch panels will be mounted in the MDF/IDF (not on the plywood). H. For installation in existing environments, conform to existing patch panel type (angled or flat). I. All blue cables will terminate on the top group of patch panels. J. All white cables will terminate on the bottom group of patch panels. K. Category-6 cabling can be connected to existing Category-5 patch panels, but not the reverse. L. Each cable run must have a 10’ / 3m service loop in the ceiling at the point where the cable starts the vertical drop to the termination point. M. All connections from patch panel to termination point (e.g. switch) will minimize the cable length required for a clean installation. N. Patch all lines down to the switches. Chapter 19 19.1 Safety Contractor Safety P a g e | 77 The Americold Contractor Safety Program has been developed to provide a systematic method for selecting contractors who exhibit, through their past work, a commitment to safety and health. Contractors should follow the Contractor Safety Program contractors to perform work in existing sites, conducting a systematic review of contractor safety practices, providing contractors with required safety information, and monitoring contractor performance while they are working at the site. After TCO/CO contractor will fall under Americold safety guidelines. 19.2 Hot Work Safety The Hot Work Safety procedure applies to any hot work conducted on or near a process area. Hot work is defined as work involving open flames or producing heat and/or sparks such as electric or gas welding, cutting, brazing, or similar flame or spark-producing operations”. The procedure applies to all employees and contractors working in the facility. Hot work permit procedures should always be coordinated with other safe work practices as applicable, to include Confined Space Entry and Lockout/Tagout. 19.3 Visitor’s Safety Visitors, vendors and contractors should follow the basic safety awareness information needed to ensure your safety while on-site, provided in the Safety Manual. However, if you are performing work on an Americold’s facility, you will be required to view the Contractor Safety Program and sign related documents for our records. P a g e | 78
0
Puede agregar este documento a su colección de estudio (s)
Iniciar sesión Disponible sólo para usuarios autorizadosPuede agregar este documento a su lista guardada
Iniciar sesión Disponible sólo para usuarios autorizados(Para quejas, use otra forma )