Subido por Mario Alberto Chavez

NE40E-X8A Quick Installation Guide(1)

Anuncio
X8A Quick Installation Guide
Precautions
To ensure human safety and device security, comply with all the safety precautions marked on the device and instructed in the product document.
The "CAUTION", "WARNING", and "DANGER" marks in the product document do not cover all the safety precautions that must be obeyed. They are supplements to the safety precautions.
Installation and maintenance personnel must be trained to perform operations correctly and safely.
To prevent device damage or personal injury, ensure that all devices are grounded before being powered on.
Do not look into optical ports without eye protection. Otherwise, eyes may be hurt by laser beams.
Always wear ESD gloves or an ESD wrist strap prior to contact with devices or before handling boards, subcards, or IC chips to prevent damage to sensitive components due to electrostatic
discharge from the human body. Ensure that the ESD wrist strap is properly grounded.
This document is developed to provide concise and quick instructions for device hardware installation. For details about the installation,
see the corresponding installation guide.
NOTE
Introduction to the Device
Cabinet Requirements
Fan module
Rack-mounting
ear
125mm (4.92 in.)
STATUS
PUSH
Air intake
frame
8
7
6
5
10
12
STATUS
FAN
LPU
L/A
L/A
STAT
US
11
STAT
US
9
4
3
2
1
FAN
SRU
L/A
L/A
ESD jack
Non-lifting handle
L/A
STAT
US
SFU
ESD jack
!
!
55kg(12
1 lbs)
Lifting handle
Cabling tray
Switch
L/A
!
55kg(12
1 lbs)
3
2
1
9
4
OFF
ALM
ACT
Alarm
Input Output
Alarm
Input Output
Alarm
Input Output
NEPS-2200-D
Ground terminal
Alarm
Input Output
NEPS-2200-D
NEPS-2200-D
150mm (5.91 in.)
!
PMU
PM
ON
ACT
1 lbs)
55kg(12
ALM
RUN
ON
Alarm
Input Output
Alarm
Input Output
PMU2
Alarm
Input Output
NEPS-2200-D
55kg(12
1 lbs)
OFF
RUN
8
7
6
5
10
12
11
ALM
RUN
PEM
ACT
NEPS-2200-D
Alarm
Input Output
NEPS-2200-D
PMU1
NEPS-2200-D
ALM
RUN
ACT
Power module
cover
NEPS-2200-D
Slot Name
800mm (31.50 in.)
Slot ID
Remarks
LPU slot
1 to 8
These slots are used to house LPUs.
SRU slot
9 and 10
These slots are used to house SRUs.
SFU slot
11 and 12
These slots are used to house SFUs.
Allow 760 mm (27.56 in.) of clearance in front of and behind the
X8A for maintenance.
CAUTION
1. The depth of the cabinet is greater than 800 mm (31.50 in.).
2. The chassis must be installed in a cabinet with an air filter. If the chassis is installed in an
open rack, install an air filter door.
3. The mounting bar is more than 150 mm (5.91 in.) back from the front door of the cabinet,
and the front door is less than 25 mm (0.98 in.) thick, to ensure that the available space is
more than 125 mm (4.92 in.).
4. The porosity of the front and rear doors of the cabinet is greater than 50%.
The default mapping cabinet is N68E-22 with 2200 mm (86.61 in.) high,
600 mm (23.62 in.) wide, and 800 mm (31.50 in.) deep. The interior height is 46U.
NOTE
01
03
02
Installing the device into a cabinet
Installing PMs
Installing PGND cables
PUSH
1.Install guide rails.
9
11
12
5
10
8
7
6
L/A
L/A
S
12
S
11
L/A
S
STATU
L/A
1
TO:
X-XXX-X-X
The bottom of each guide rail must be aligned with
the scale on the mounting bar.
!
4
55kg(121
lbs)
L/A
M5
30 kgf·cm(26.04 lbf·in.)
9
L/A
The side the top of which has ground screws is the
rear of a Huawei cabinet.
4
3
2
1
STATU
M8
80 kgf·cm(69.44 lbf·in.)
STATU
NOTE
!
55kg(121
lbs)
The floating nuts must be installed securely.
4
3
2
1
RUN
ALM
ACT
5
10
OFF
OFF
8
7
6
RUN
ON
ALM
2
ACT
ON
Alarm
Input Output
TOP
Alarm
Input Output
Alarm
Input Output
Alarm
Input Output
NEPS-2200-D
NEPS-2200-D
1U(1.75 in.)
Ensure that the clearance between the guide rails
and the cabinet bottom is at least 1U (1.75 in.).
Alarm
Input Output
TOP
Alarm
Input Output
NEPS-2200-D
NEPS-2200-D
Alarm
Input Output
NEPS-2200-D
Alarm
Input Output
NEPS-2200-D
NEPS-2200-D
3
PMU2
PMU1
RUN
ALM
RUN
ALM
ACT
ACT
1
TO:
X-XXX-X-X
STATUS
3
FAN
STATUS
FAN
2
2. Install floating nuts.
55kg(121
lbs)
!
55kg(121
lbs)
Floating nuts.
04
Installing power cables
AR
M
Empty
(1U)
K
Guide rails.
3. Install the device into the cabinet.
CAUTION
The device is heavy, and requires four people to lift and
move.
When you install the device in a cabinet, hold the
handles at both sides of the device, and do not use
handles of any other module and avoid stepping on the
air filter at the bottom of the cabinet.
M6
30 kgf·cm(26.04 lbf·in.)
1
PUSH
2
3
2
1
4
9
11
12
4
9
11
12
6
5
10
8
7
1、Route power cables along the cable ladder to the chassis.
2、Remove plastic covers on connection boxes of power modules.
3、(DC)Connect one end of each power cable to the corresponding terminal and the
other end to the PDF.After connecting power cables, restore the plastic covers to their
original positions.
(HVDC)Route HVDC power cables along the cable tray and connect them to the input
terminals of the HVDC power distribution box. Connect the other end of each power cable
to the PDF in the equipment room.
(AC)Route AC power cables along the cable ladder and connect them to the input
terminals of the AC power distribution box. Connect the other end of each power cable to
the PDF in the equipment room.After cables are inserted to the terminals, use cable
fasteners to secure the cables to the terminals.
4、Use cable ties to bundle the cables every 150 mm (5.91 in.) upwards from the bottom end,
and secure the cables to the cable tray.
5、Attach permanent labels 20 mm (0.79 in.) from both ends of each power cable.
Install power cables when the power is off to avoid personal injury.
To avoid device damage or personal injury, ensure that the device is
grounded beforebeing powered on.
!
55kg(121
lbs)
!
55kg(121
lbs)
3
2
1
6
5
10
8
7
RUN
PMU2
RUN
PMU1
ALM
ALM
Voltage range
-40V DC to -72V DC
180V AC to 264V AC
192V DC to 288V DC
260V DC to 400V DC
Item
DC
AC
240V HVDC
380V HVDC
M6
50 kgf·cm(43.40 lbf·in.)
!
DANGER
ACT
ACT
3、 Installing a subcard
Installing DC power cables
Installing AC/HVDC power cables
a.Insert a subcard along the guide rails in the slots on the board.
b.Use a Phillips screwdriver to tighten the captive screws.
Installing a board
AC
M3
3 kgf·cm(2.60 lbf·in.)
PUSH
1
2
M3
1.5 kgf·cm(1.30 lbf·in.)
1
11
9
4
3
2
10
12
8
7
6
5
1
2
2
1
STATUS
STATUS
FAN
FAN
HVDC
STATUS
NEG(-)
FAN
STATUS
3
!
FAN
55kg(1
21 lbs)
!
55kg(1
!
55kg(121
lbs)
RTN(+)
!
55kg(121
lbs)
3
21 lbs)
1
!
55kg(121
11
9
4
3
2
12
10
!
55kg(121
lbs)
INPUT
— -48V—-60V;63A
---
INPUT
— -48V—-60V;63A
---
PEM
RTN(+) NEG(-)
PEM
PMU2
M6
50 kgf·cm(43.40 lbf·in.)
RTN(+) NEG(-)
8
7
6
5
lbs)
PMU1
05
Installing Boards and Subcards
ALM
RUN
RUN
ALM
ACT
ACT
Installing a subcard
1、(Optional)Removing redundant guide rails.
M3
3 kgf·cm(2.60 lbf·in.)
ST
AT
US
PUSH
Use a Phillips screwdriver to remove the screws and remove the guide rails from the board.
12
10
5
L/A
8
7
6
US
11
STAT
US
9
STAT
4
3
2
STAT
US
L/A
L/A
L/A
L/A
L/A
1
L/A
2
1
!
55kg(1
21 lbs)
L/A
!
55kg(1
21 lbs)
1
2、 Installing a board.
4
3
2
9
11
12
10
5
PMU2
PMU1
RUN
ALM
8
7
6
RUN
ALM
ACT
ACT
a.Remove the filler panel in the slot.
b.Insert the board along the guide rails in the slot and secure the board.
c.Use a Phillips screwdriver to tighten the captive screws.
08
Checking installation
06
Installing network cables
NO
4
5
The terminals at both ends of each power cable or PGND cable are crimped securely.
6
The wiring terminals on cables are wrapped tightly using PVC insulation tapes or heat
shrink tubes.
7
The wiring terminals with heat shrink tubes are heated using a heat gun.
8
9
Flat and spring washers are properly installed on each bolt of a wiring terminal.
10
Power and ground cables are bound separately from other cables.
11
The cable layout accounts for easy maintenance and expansion in the future.
12
The labels at both ends of each cable are correct, legible, and complet.
1
2
3
PUSH
1
11
12
10
5
6
2
8
7
STATUS
9
STATUS
4
3
2
TO:
X
X-XXX-X-
L/A
STATUS
L/A
L/A
L/A
L/A
1
!
lbs)
L/A
55kg(121
!
55kg(121
lbs)
1
4
3
2
9
11
12
10
5
6
PMU2
PMU1
RUN
ALM
8
7
RUN
ALM
ACT
ACT
07
Installing optical fibers
1.Route corrugated pipes
Check Item
All bolts and screws are firmly fastened, especially on electrical connections. Flat and
spring washers are used with each bolt, and spring washers are placed on the top of flat
washers.
All assembled PGND cables are copper-based with proper wire diameters. There is no
switch, fuse, or disconnection on the cables.
All ground cables, AC input cables, and intra-cabinet cables are connected correctly
according to the wiring diagram, and all screws are tightened. The input and output
cables are not short-circuited.
Any redundant parts of power cables or PGND cables are trimmed off and not coiled.
All cables, especially the cables in the lower area of the cabinet, are securely connected.
2. Installing optical fibers
09
Performing a power-on check
1. Before a power-on check, ensure that the switch is Off and the input voltage is within the normal range.
2. Turn on external power supply and check whether the output voltage meets power supply requirements.
3. Check whether the voltage of the input terminal on the PEM is within the normal range.
4. Turn on the power supply switch on the PEM to supply power to the device. Check whether the power
supply is normal.
5. Check the status of device indicators.
2
3
8
4
3
2
9
11
12
10
6
5
8
7
STATUS
STATUS
L/A
1
1
L/A
L/A
STATUS
STATUS
L/A
L/A
L/A
L/A
L/A
L/A
L/A
100mm (3.94 in.)
STATUS
7
STATUS
6
5
L/A
10
L/A
12
L/A
11
STATUS
9
STATUS
4
3
2
L/A
1
2
!
lbs)
Indicator
Normal Status
PMU
RUN
Blinking every two seconds
TO:
X
X-XXX-X-
PM
Input、Output
Steady green
FAN module
STATUS
Blinking every two seconds
MPU
RUN
Blinking every two seconds
SFU
RUN
Blinking every two seconds
LPU
RUN
Blinking every two seconds
!
55kg(121
lbs)
L/A
L/A
55kg(121
Component
PUSH
PUSH
1
!
55kg(121
lbs)
1
4
3
2
9
11
12
10
5
6
!
8
7
55kg(121
lbs)
1
PMU2
RUN
ALM
4
3
2
9
11
12
10
5
6
ACT
PMU2
PMU1
RUN
ALM
RUN
ALM
ACT
ACT
PMU1
CAUTION
8
7
RUN
ALM
ACT
Dust caps must be installed on optical modules that are not connected to
any optical fibers.
Copyright © Huawei Technologies Co., Ltd. 2017. All rights reserved.
Descargar