Paúl Enrique TELLO CESPEDES Civil Engineer CIP 128993 [email protected] +51 978 488 820 Av. Víctor Raúl N° 222 San Andrés V Etapa, distrito de Víctor Larco Herrera – Trujillo Ca. Compostela N° 141 Dpto. 301 Santiago de Surco - Lima WHO I AM Professional (Collegiate), capable of planning, analyzing and supervising continuous improvement in construction processes, costs and operations, with verifiable experience in civil operations in the areas of Production and Technical Office (Tenders, Production Engineer, budgeting, payment of payroll, appraisals); Costs and Improvement Engineering (Planning, quality control). Willing to take on goals. PROGRAMAS IDIOMAS S10 Español Project Inglés Intermedio AutoCad REFERENCIAS Gabriel CIRIANI FUSTER Constructora Mallorca | Gerente General Teléfono 994 203 145 [email protected] Marco Antonio GOMEZ SANCHEZ Constructora Mallorca | Jefe de Proyectos Teléfono 975 191 743 [email protected] PROFESSIONAL EXPERIENCE 02/01/2021 – 30/05/2021 INVERSIONES JTN SAC PLACE: MOTUPE Ing. Resident Achievement 29/05/2020 – 03/08/2020 Achievement To carry out 05 fish farms Perform The earthwork, the one covered with geotextile and geomembrane. Optimize staff performance. Analyze the costs incurred on site and value the payments. INVERSIONES ROGA SAC PLACE: Lagunas Norte Barrick - Quiruvilca Field and Safety Engineer Achievement PROJECT COST 24/01/2020 – 28/05/2020 Run 2 km of rich solution pipeline cleaning. Optimize staff performance. Analyze the costs incurred on site and value payments. 142,857.14 DOLLARS NKP CONTRATISTAS GENERALES EIRL PLACE: Trujillo Resident Engineer Achievement PROJECT COST 02/10/2019 – 19/11/2019 Execute, analyze and optimize the construction processes of the "Extension of the third level of the CIBERTEC Institute". Optimize staff performance. Analyze the costs incurred on site and value payments. 536,659.90 DOLLARS HIDRO WORKS PLACE: Villa María del Triunfo – Lima Resident Engineer Achievement PROJECT COST Execute, analyze and optimize the construction processes of the project PISCINAS TRAPEZOIDAL CURVADA h = 1.10m and CIRCULAR F 12.0m h = 0.525m, VILLA MARIA DEL TRIUNFO - SACYR 428,571.42 DOLLARS 01/04/2018 – 30/08/2019 CONSTRUCTORA MALLORCA SAC PLACE: Miraflores – Lima Resident Engineer Achievement PROJECT COST 01/07/2017 – 31/06/2018 Execute, analyze and optimize the construction processes of the Multifamily “San Fernando”. Work with the urban parameters of the Miraflores area. Optimize staff performance. Analyze the costs incurred on site and value payments. 571,428.57 DOLLARS INVERSIONES JTN SAC Resident Engineer Achievement 01/06/2015 – 01/06/2017 Creation of recreational services in Park N ° 3 in the A.H. Simón Bolivar Plot C Ensenada Sector, Puente Piedra district - Lima - Lima ”, with snip code 242282 • Installation of the I.E. Children's Carousel, Puente Piedra, Puente Piedra district, Lima Province, Lima department " • improvement of the educational service at the primary level of the i.e. n 5168 rosa luz in the Rosa Luz residential development, Tambo Inga Oeste sector, Puente Piedra Lima district - Lima II stage • Improvement of primary education services in the educational institution n ° 3071 Manuel García Cerrón - Cercado Sector, Puente Piedra district - Lima - Lima II stage snip 360366 " INGENIERIA Y CONSTRUCCIONES INKA SAC Chief of Operations and Resident Engineer Achievement PROJECT COST Urban development of 2 hectares for the construction of 6 flats towers, 14 houses, swimming pool and common areas. Construction of Las Palmeras de Bocapan Condominium - Tumbes (6 flats towers and 14 houses) Analyze and optimize construction processes. Optimize staff performance. Analyze the costs incurred on site and value payments. Define the suppliers to hire, analyze and hire companies that provide the outsourcing service. 2,285,714.28 DOLLARS 19/03/2015 – 18/05/2015 SERVICIOS GENERALES SSV EIRL PLACE: Comunidad Nativa Peruanito –Trompeteros - Iquitos Resident Engineer Achievement PROJECT COST 01/07/2014 – 12/02/2015 Construction of Elevated Concrete Tank (12 m high). Analyze and optimize the construction processes of the Elevated Tank Optimize staff performance. Analyze the costs incurred on site and value payments. 81,568.45 DOLLAR TEPSI ANDINA SAC PLACE: Lote 8 –Trompeteros - Iquitos Civil Engineer Achievement Preparation of Technical Files (Community Venue, Posts, Sidewalks, Sanitation, School Venue, Force Booth, Pedestrian Bridges) Preparation of civil works planning and initial requirement of materials. Preparation and supervision of costs and budgets of civil works in execution. Preparation of valuations and additional with the internal and external client of the company. Monitoring and Control of Progress of Civil Works in office and on site. Supervision of work in the field. 1/8/2013 – 30/06/2014 INVERSIONES INMOBILIARIAS MILLENIUM SAC. PLACE: LIMA Civil Engineer Achievement PROJECT COST 1/2/2013 – 31/7/2013 Multi-family “AURORA” with 2 basements, 5 floors and a roof terrace Analyze and optimize the construction processes of the Multifamily “AURORA”. Work with the urban parameters of the area. Optimize staff performance. Analyze the costs incurred on site and value payments. Make building declarations (demolition and building). 661,172.311 DOLLARS GRINSA SRL. PLACE: TRUJILLO Project Manager Achievement FUNCTIONS Monto Multi-family “Santa Bárbara” Multifamily "Los Lirios" Preparation of proposals for state and private tenders. Preparation of files for the program My Home (Own Site and Own Roof). Supervise, plan and prepare files for buildings and bids for private and state works. Resident Engineer of the Multifamily ‘’ Santa Bárbara ’’. Control the work costs of the Multifamiliar ‘’ Santa Bárbara ’’. 452,715.18 DOLLARS 6/8/201231/01/2013 CONSORCIO MINERO HORIZONTE S.A. PLACE: RETAMAS – LA LIBERTAD ADMINISTRATOR OF Dams and Tailings ENGINEER Achievement Study of Physical and Chemical Stability of Active Tailings Dams and Mine Stripping. Plan for the Closure of Mining Environmental Liabilities. Repairs of geomembrane, hdp pipe. Maintenance of civil works. (accounts) Preparation of a strategic plan for the Dam and Tailings Adm. Engineer. Coordination with the OOCC and Plant area for the execution of the new tailings line. FUNCTIONS Dam and Tailings Supervisor Engineer. Environmental supervisor engineer. 1/11/20111/08/2012 CONSTRUCTORA MALLORCA SAC PLACE: LIMA Civil Engineer Achievement Analyze and optimize the construction processes of the “Hermanos Lobo” Multifamily. Work with the urban parameters of the San Borja area. Optimize staff performance. Analyze the costs incurred on site and value payments. PROJECT COST 428,571.42 DOLLARS 22/05/201122/10/2011 HAZCO ENVIRONMENTAL SERVICES DEL PERU SAC PLACE: Abancay, Arequipa Production Engineer Achievement PROJECT COST 10/2010 – 1/2011 Analyze and optimize the construction processes of the Relave Pallancata - Mina Selene dam. (instrumentation, installation of geomembrane, geotextile, geogrid), by means of thermofusion process. Earthmoving of granular material for day shift extracted from blasting. Provide spread area for the placement of geotextile and geomembrane. Formation of dumps. Construction of civil works (roofed canals, gutters and speed bumps) Optimize the performance of operators and heavy machinery. Analyze the costs incurred on site and assess the machinery rental payments. 2,285,714.28 DOLLARS GRINSA. PLACE: TRUJILLO Production Engineer Achievement Analyze the technical information, supervise the execution of the Operating Budget and management of the URB project. VILLA SANTA MARIA (328 homes) from the My Home and Own Roof Program. Supervise the construction of the multifamily "Los claveles de California" Rethink the topographic level for the water and sewage facilities.Elaborar licitaciones públicas y privadas. PROJECT COST 2/2009 – 8/2010 2,342,857.14 DOLLARS TENAJ CONSTRUCCION SAC. PLACE: LIMA Production Engineer Achievement Various jobs at Molitalia and at the Costa los Olivos Plant. (Construction and repairs of Hangars, Construction and repairs of hygienic services, patching and improvement of accesses, construction of sardines, construction of slabs, and various services to said company.) Construction of the El Verde canal, in the town of Jayanca, Lambayeque Province. Patching and construction of tracks in the Ate Vitarte district. Construction of multifamily. Construction of sardines and sidewalks in San Borja Norte. Construction of modules in the CAEN-Chorillos high school for military studies. Data Base was designed for the Administrative area (Analysis of unit costs). REFERENCES SCHOOL C.E.P. “PERPETUO SOCORRO” – (Primary school and high school). UNIVERSITARIA “UNIVERSITY PRIVADA ANTENOR ORREGO” – UPAO. (Titled and Collegiate) Faculty: CIVIL ENGINEERING Title: CIVIL ENGINEER SPECIALTY AND COURSES S10 – COLEGIO DE INGENIEROS DEL PERU. Integrated Management System Based on OHSAS 18001: 2007 and ISO 14001: 2004 Standards BEREAU VERITAS Property sanitation of property No. 2 - TECHNICAL CORPS OF APPRAISALS OF PERU Property Sanitation and Titling - COLLEGE OF REGISTRARS OF PERU State Procurement Law No. 30225, Applied to Public Works - CIPCPLL