1
PILA DE ACOPIO
240,000 t/d
4m
DE MINERAL GRUESO (2)
TOLVA DE COMPENSACION
93,000 T LIVE
DE MINERAL GRUESO (8)
3m
A
COARSE ORE
STOCKPILE (2)
COARSE ORE
50m
SURGE BIN (8)
5200 t
2m
TOTAL
PRIMARY
ZARANDAS
COARSE ORE
60" x 113"
DE MINERAL
SCREENS (8)
3.6 x 7.9 m DD
CHANCADORAS
GRUESO (8)
1m
CRUSHER (2)
HPGR CRUSHER
PRIMARIAS (2)
TOLVA DE COMPENSACION
SURGE BIN (8)
CHANCADORAS SECUNDARIAS (8)
14,400 t
BIN 36000 t
ALIMENTACION DE HPGR (8)
TOTAL
TOTAL
SECONDARY
TOLVA DE ALIMENTACION
B
HIGH PRESSURE
A MOLINO DE BOLAS (6)
MP 1250
REBALSE
CONCENTRATE
0
TOLVA DE COMPENSACION
5600 t
CRUSHERS (8)
GRINDING ROLL
933 kW
THICKENER O/F
ESPESADOR
CLARIFIER
DE CONCENTRADO
35m DIA.
CLARIFICADOR
CRUSHERS
EACH
40m
50m
FEED SURGE (6)
1:50
SURGE BIN (8)
3m
1:1000
SECONDARY CRUSHERS
(8) 5,000 kW VS
EACH
CHANCADORAS
BALL MILL
SECUNDARIAS (8)
FEED SCREENS (12)
CHANCADORAS HPGR DE
3.6 x 8.5 m DD
MOLIENDA DE ALTA PRESION (8)
2m
0
TOTAL
BALL MILL
ZARANDAS DE
30m
TAILING THICKENER
ALIMENTACION A
MOLINO DE BOLAS (12)
ESPESADOR
DE RELAVES
1m
CELDAS DE FLOTACION
PRIMARIA / DE BARRIDO
6 FILAS X 9
BALL MILL (6)
ROUGHER/SCAVENGER
8.2 m x 14.6 m EGL
FLOTATION CELLS
22 MW, VS
6 ROWS X 9
EACH
255 m
Cu - Mo
3
0
10m
20m
MOLINO DE BOLAS (6)
1:33 1/3
CONCENTRATE
THICKENER
45m DIA.
ESPESADOR DE
DE BARRIDO DE Mo
CONCENTRADO DE Cu - Mo
Cu CONCENTRATE
THICKENER
Mo ROUGHER
35m DIA.
SCAVENGER
TOTE BIN
FLOTACION DE
FLOTACION PRIMARIA
PRIMARIA LIMPIEZA
Mo FIRST
DE Mo
FLOTATION
DE Mo
FLOTATION
FLOTATION
20m
Mo ROUGHER
CLEANER
2.5m
1:500
0
CONCENTRADO DE Cu
FLOTACION PRIMARIA /
2m
C
ESPESADOR DE
Mo SECOND
15m
CLEANER
FLOTATION
REGRIND
SECUNDARIA DE
COLUMN
DE Mo
CONCENTRADO
Mo CONC.
THICKENER
FILTER
6m DIA
Mo INTERMEDIATE
ESPESADOR
CONCENTRADO
DE Mo
THICKENER
156 m
2
FLOTACION DE LIMPIEZA
TOTAL
VERTICALES (2)
20m DIA
ESPESADOR
CELDAS DE FLOTACION
INTERMEDIO
DE LIMPIEZA / DE BARRIDO
DE Mo
2 FILAS X 6
0
3,459 t/d
1:200
Mo COLUMN
REMOLIENDA
DE BAJO GRADO VERTIMILLS (2)
2240 KW
FLOTATION CELLS
TOTAL
Mo CLEANER
2 ROWS X 6
SCAVENGER
255 m
3
2m
SECADOR
CONCENTRADO DE Mo
10m
REGRIND
CLEANER/SCAVENGER
DRYER
PROCESS WATER
STORAGE
RE-LAVADORES
RECLEANERS
3 x 160 m 3
Cu CONCENTRATE
Mo CONCENTRATE
CONCENTRADO
STORAGE BIN
DE Mo
PILA DE ACOPIO
DE CONCENTRADO DE Cu
MOLINOS
VERTICALES (2)
DE BARRIDO DE Mo
LIMPIADOR DE
COLUMNAS DE Mo (3)
Mo CONCENTRATE
LOW GRADE
FLOTACION PRIMARIA /
CLEANERS (3)
STOCKPILE
MOLINOS
EN COLUMNAS (6)
1:25
FILTER (3)
2240 KW
0
5m
Cu CONCENTRATE
4.88 m DIA. X 12 m H
0.5m
Mo CONC.
D
FILTRO DE
4
VERTIMILLS (2)
CLEANERS (6)
1m
CONCENTRADO
DE Cu (3)
DE ALTO GRADO
1.5m
10m
REMOLIENDA
LIMPIEZA DE Mo
FILTRO DE
1.5m
HIGH GRADE
FLOTACION
PLANTA DE
TOLVA DE ALMACENAMIENTO
Mo CONCENTRATE
DE CONCENTRADO DE Mo
PRODUCT
ALMACENAMIENTO
MOLIBDENO
46 t/d
AGUA DE PROCESO
MOLY PLANT
HIGH CAPACITY
THICKENER (4)
5m
80 m DIA.
1m
E
TAILING
ESPESADOR DE
RELAVE DE ALTA
AGUA DE PROCESO
15t
15t
TAILING IMPOUNDMENT
0
A LA JOYA
1:100
TO LA JOYA
DES.
REV. DATE
A
24JUN11
F
A1 19SEP11
B 03NOV11
AR
EMITIDO PARA REVISION COMBINADA
SW
ISSUED FOR COMBINED REVIEW - INTERIM UPDATE
TO
EMITIDO PARA REVISION COMBINADA - ACTUALIZACION INTERINA
LFT
ISSUED FOR CLIENT REVIEW/PROJECT BASELINE
EMITIDO PARA REVISION DEL CLIENTE - LINEA BASE DEL PROJECTO
C
21FEB12
18JUL12
EMITIDO PARA DISENO
JL
EMITIDO PARA DISENO- TRADUCIDO
AJG
GV
LFT
JL
KM
LFT
11SEP12
RE-EMITIDO PARA DISENO
VU
2
RE-ISSUED FOR DESIGN
13DEC12
RE-EMITIDO PARA DISENO
BA
GV
JL
ISSUED FOR DESIGN
ISSUED FOR DESIGN - TRANSLATED
0T
AJG
RE-ISSUED FOR DESIGN
1
3
18JUN13
AJG
LFT
REFERENCE DRAWING No.
REFERENCE DRAWINGS
L. TAMELIN
CHK.
LFT
ISSUED FOR CLIENT APPROVAL
EMITIDO PARA APROBACION DEL CLIENTE
0 04APR12
AR
LA LENGUA INGLESA TENDRA PRECEDENCIA
DESIGNED BY
APPROVED
REVISION DESCRIPTION
CHK.
ISSUED FOR COMBINED REVIEW
4
12AUG14
RE-ISSUED FOR DESIGN (2013 ESTIMATE)
RE-EMITIDO PARA DISENO (ESTIMADO 2013)
RE-ISSUED FOR DESIGN
RE-EMITIDO PARA DISENO
AJG
RT
AR
LEAD ENGINEER
A. GUNSON
AJG
RT
AREA MANAGER
NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE
SOLE PROPERTY OF FLUOR AND IS LENT TO THE BORROWER
LFT
KM
R. THORPE
FOR THEIR CONFIDENTIAL USE ONLY, AND IN CONSIDERATION OF
AJG
ENGINEERING MANAGER
A. KING
WILL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
CLIENT
DISPOSED OF DIRECTLY OR INDIRECTLY, NOR USED FOR ANY
RT
SAFETY SHARE : ACCIDENT BRINGS TEARS - SAFETY BRINGS CHEERS
CHECK DRAWING
APPROVAL DATE
20JUN13
CONCENTRADORA DE SULFUROS
DIAGRAMA DE FLUJO DE PROCESOS
DIAGRAMA DE FLUJO GENERAL
APPROVAL DATE
19JUN13
APPROVAL DATE
THE LOAN OF THIS DRAWING, THE BORROWER PROMISES AND
AGREES TO RETURN IT UPON REQUEST AND AGREES THAT IT
RT
SULFIDE CONCENTRATOR
PROCESS FLOW DIAGRAM
OVERALL FLOW DIAGRAM
A. REGNAULT
RT
VU
LFT
DRAWN BY
V. UDUMAN
AJG
VU
LFT
CHECK DESIGN
AJG
J. VANDERBEEK
PURPOSE OTHER THAN THAT FOR WHICH IT IS FURNISHED.
MANUAL CHANGES MADE: YES
bA6CVA1.DGN
ENGLISH LANGUAGE SHALL GOVERN.
EMBALSE DE RELAVES
POR TREN AL PUERTO
DE MATARANI
DES.
APPROVED REV. DATE
REVISION DESCRIPTION
BY RAIL TO
MATARANI PORT
1:20
15t
0
15t
COMPARTAMOS LA SEGURIDAD: ACCIDENTES TRAEN LAGRIMAS - LA SEGURIDAD NOS TRAE ALEGRIAS
*DATE*TIME*
NO
DWG. FILE UPDATED: YES
NO
19JUN13
APPROVAL DATE
18JUN13
MODEL UPDATED: YES
NO
SCALE
NONE
DRAWING NUMBER
240K-C2-0000-25I-003
CAD FILE NAME: P:\CAD\226\PFDVA\0000-25I-003.DGN
NO.
15t
CAPACIDAD (4)
REV.
4
CONTRACT
15t
PROCESS WATER
STORAGE
0.5m
ALMACENAMIENTO
Descargar