2 3 4 5 6 7 8 5m 100m 1 PILA DE ACOPIO 240,000 t/d 4m DE MINERAL GRUESO (2) TOLVA DE COMPENSACION 93,000 T LIVE DE MINERAL GRUESO (8) 3m A COARSE ORE STOCKPILE (2) COARSE ORE 50m SURGE BIN (8) 5200 t 2m TOTAL PRIMARY ZARANDAS COARSE ORE 60" x 113" DE MINERAL SCREENS (8) 3.6 x 7.9 m DD CHANCADORAS GRUESO (8) 1m CRUSHER (2) HPGR CRUSHER PRIMARIAS (2) TOLVA DE COMPENSACION SURGE BIN (8) CHANCADORAS SECUNDARIAS (8) 14,400 t BIN 36000 t ALIMENTACION DE HPGR (8) TOTAL TOTAL SECONDARY TOLVA DE ALIMENTACION B HIGH PRESSURE A MOLINO DE BOLAS (6) MP 1250 REBALSE CONCENTRATE 0 TOLVA DE COMPENSACION 5600 t CRUSHERS (8) GRINDING ROLL 933 kW THICKENER O/F ESPESADOR CLARIFIER DE CONCENTRADO 35m DIA. CLARIFICADOR CRUSHERS EACH 40m 50m FEED SURGE (6) 1:50 SURGE BIN (8) 3m 1:1000 SECONDARY CRUSHERS (8) 5,000 kW VS EACH CHANCADORAS BALL MILL SECUNDARIAS (8) FEED SCREENS (12) CHANCADORAS HPGR DE 3.6 x 8.5 m DD MOLIENDA DE ALTA PRESION (8) 2m 0 TOTAL BALL MILL ZARANDAS DE 30m TAILING THICKENER ALIMENTACION A MOLINO DE BOLAS (12) ESPESADOR DE RELAVES 1m CELDAS DE FLOTACION PRIMARIA / DE BARRIDO 6 FILAS X 9 BALL MILL (6) ROUGHER/SCAVENGER 8.2 m x 14.6 m EGL FLOTATION CELLS 22 MW, VS 6 ROWS X 9 EACH 255 m Cu - Mo 3 0 10m 20m MOLINO DE BOLAS (6) 1:33 1/3 CONCENTRATE THICKENER 45m DIA. ESPESADOR DE DE BARRIDO DE Mo CONCENTRADO DE Cu - Mo Cu CONCENTRATE THICKENER Mo ROUGHER 35m DIA. SCAVENGER TOTE BIN FLOTACION DE FLOTACION PRIMARIA PRIMARIA LIMPIEZA Mo FIRST DE Mo FLOTATION DE Mo FLOTATION FLOTATION 20m Mo ROUGHER CLEANER 2.5m 1:500 0 CONCENTRADO DE Cu FLOTACION PRIMARIA / 2m C ESPESADOR DE Mo SECOND 15m CLEANER FLOTATION REGRIND SECUNDARIA DE COLUMN DE Mo CONCENTRADO Mo CONC. THICKENER FILTER 6m DIA Mo INTERMEDIATE ESPESADOR CONCENTRADO DE Mo THICKENER 156 m 2 FLOTACION DE LIMPIEZA TOTAL VERTICALES (2) 20m DIA ESPESADOR CELDAS DE FLOTACION INTERMEDIO DE LIMPIEZA / DE BARRIDO DE Mo 2 FILAS X 6 0 3,459 t/d 1:200 Mo COLUMN REMOLIENDA DE BAJO GRADO VERTIMILLS (2) 2240 KW FLOTATION CELLS TOTAL Mo CLEANER 2 ROWS X 6 SCAVENGER 255 m 3 2m SECADOR CONCENTRADO DE Mo 10m REGRIND CLEANER/SCAVENGER DRYER PROCESS WATER STORAGE RE-LAVADORES RECLEANERS 3 x 160 m 3 Cu CONCENTRATE Mo CONCENTRATE CONCENTRADO STORAGE BIN DE Mo PILA DE ACOPIO DE CONCENTRADO DE Cu MOLINOS VERTICALES (2) DE BARRIDO DE Mo LIMPIADOR DE COLUMNAS DE Mo (3) Mo CONCENTRATE LOW GRADE FLOTACION PRIMARIA / CLEANERS (3) STOCKPILE MOLINOS EN COLUMNAS (6) 1:25 FILTER (3) 2240 KW 0 5m Cu CONCENTRATE 4.88 m DIA. X 12 m H 0.5m Mo CONC. D FILTRO DE 4 VERTIMILLS (2) CLEANERS (6) 1m CONCENTRADO DE Cu (3) DE ALTO GRADO 1.5m 10m REMOLIENDA LIMPIEZA DE Mo FILTRO DE 1.5m HIGH GRADE FLOTACION PLANTA DE TOLVA DE ALMACENAMIENTO Mo CONCENTRATE DE CONCENTRADO DE Mo PRODUCT ALMACENAMIENTO MOLIBDENO 46 t/d AGUA DE PROCESO MOLY PLANT HIGH CAPACITY THICKENER (4) 5m 80 m DIA. 1m E TAILING ESPESADOR DE RELAVE DE ALTA AGUA DE PROCESO 15t 15t TAILING IMPOUNDMENT 0 A LA JOYA 1:100 TO LA JOYA DES. REV. DATE A 24JUN11 F A1 19SEP11 B 03NOV11 AR EMITIDO PARA REVISION COMBINADA SW ISSUED FOR COMBINED REVIEW - INTERIM UPDATE TO EMITIDO PARA REVISION COMBINADA - ACTUALIZACION INTERINA LFT ISSUED FOR CLIENT REVIEW/PROJECT BASELINE EMITIDO PARA REVISION DEL CLIENTE - LINEA BASE DEL PROJECTO C 21FEB12 18JUL12 EMITIDO PARA DISENO JL EMITIDO PARA DISENO- TRADUCIDO AJG GV LFT JL KM LFT 11SEP12 RE-EMITIDO PARA DISENO VU 2 RE-ISSUED FOR DESIGN 13DEC12 RE-EMITIDO PARA DISENO BA GV JL ISSUED FOR DESIGN ISSUED FOR DESIGN - TRANSLATED 0T AJG RE-ISSUED FOR DESIGN 1 3 18JUN13 AJG LFT REFERENCE DRAWING No. REFERENCE DRAWINGS L. TAMELIN CHK. LFT ISSUED FOR CLIENT APPROVAL EMITIDO PARA APROBACION DEL CLIENTE 0 04APR12 AR LA LENGUA INGLESA TENDRA PRECEDENCIA DESIGNED BY APPROVED REVISION DESCRIPTION CHK. ISSUED FOR COMBINED REVIEW 4 12AUG14 RE-ISSUED FOR DESIGN (2013 ESTIMATE) RE-EMITIDO PARA DISENO (ESTIMADO 2013) RE-ISSUED FOR DESIGN RE-EMITIDO PARA DISENO AJG RT AR LEAD ENGINEER A. GUNSON AJG RT AREA MANAGER NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF FLUOR AND IS LENT TO THE BORROWER LFT KM R. THORPE FOR THEIR CONFIDENTIAL USE ONLY, AND IN CONSIDERATION OF AJG ENGINEERING MANAGER A. KING WILL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE CLIENT DISPOSED OF DIRECTLY OR INDIRECTLY, NOR USED FOR ANY RT SAFETY SHARE : ACCIDENT BRINGS TEARS - SAFETY BRINGS CHEERS CHECK DRAWING APPROVAL DATE 20JUN13 CONCENTRADORA DE SULFUROS DIAGRAMA DE FLUJO DE PROCESOS DIAGRAMA DE FLUJO GENERAL APPROVAL DATE 19JUN13 APPROVAL DATE THE LOAN OF THIS DRAWING, THE BORROWER PROMISES AND AGREES TO RETURN IT UPON REQUEST AND AGREES THAT IT RT SULFIDE CONCENTRATOR PROCESS FLOW DIAGRAM OVERALL FLOW DIAGRAM A. REGNAULT RT VU LFT DRAWN BY V. UDUMAN AJG VU LFT CHECK DESIGN AJG J. VANDERBEEK PURPOSE OTHER THAN THAT FOR WHICH IT IS FURNISHED. MANUAL CHANGES MADE: YES bA6CVA1.DGN ENGLISH LANGUAGE SHALL GOVERN. EMBALSE DE RELAVES POR TREN AL PUERTO DE MATARANI DES. APPROVED REV. DATE REVISION DESCRIPTION BY RAIL TO MATARANI PORT 1:20 15t 0 15t COMPARTAMOS LA SEGURIDAD: ACCIDENTES TRAEN LAGRIMAS - LA SEGURIDAD NOS TRAE ALEGRIAS *DATE*TIME* NO DWG. FILE UPDATED: YES NO 19JUN13 APPROVAL DATE 18JUN13 MODEL UPDATED: YES NO SCALE NONE DRAWING NUMBER 240K-C2-0000-25I-003 CAD FILE NAME: P:\CAD\226\PFDVA\0000-25I-003.DGN NO. 15t CAPACIDAD (4) REV. 4 CONTRACT 15t PROCESS WATER STORAGE 0.5m ALMACENAMIENTO