C A 6.16 5.90 16.15 POOL .15 .15 4.23 1.48 .15 .15 4.10 .15 1.48 .30 3.82 .15 C TERRACE .15 .15 5.86 2.10 PUZZLE ROOM 4.38 16.15 .15 .15 3.53 LOUNGE AREA 2.06 4.10 BALCONY .15 3.92 .15 2.06 BATHROOM A BATHROOM .15 GUEST ROOM 6.00 CLOSET = 0. 5 0.5 0. 5 % % S = 0. 5 % % S= 0.5 = S= S RAIN DRAINAGE % S 0.5 % % 0.5 % 0. 5 S= % 0.5 0.5 S= S= CLOSET HALL 3.05 CLOSET = RAIN DRAINAGE S= S RAIN DRAINAGE % % OFFICE S= 0.5 BBQ ZONE 0.5 S= % .15 .15 .15 KITCHEN STORAGE 4.55 BATHROOM 1.48 7.26 .15 0. 5 % MAIDS ROOM KITCHEN B .15 .15 1.80 ELEVATOR ELEVATOR .15 .30 BATHROOM B 3.50 .15 .15 TECHNICAL ROOM 6.75 A % 0.5 % S= 0. 5 % 0.5 BATHROOM ELEVATOR S= 1.65 .15 .15 3.00 4.66 A 2.00 S HALL = 0. 5 RAIN DRAINAGE .15 % % S S = = 0. 5 % % HALL HALL 4.65 = 5 0. 5 0. 4.65 5.85 STAIRS STAIRS .15 .15 .30 6.85 .15 1.20 7.30 BASEMENT FLOOR % B S 4.65 = .45 A 4.50 S .15 1.65 STAIRS % 0.5 % MASTER BEDROOM CLOSET 5.30 0. 5 % 3.50 STORAGE BALCONY B 5 % .15 B = RAIN DRAINAGE BEDROOM BATHROOM 2.90 B S RAIN DRAINAGE 0. 0.5 1.65 CLOSET S= 40.00 7.65 40.00 WALK IN CLOSET .15 GYM = S= 1.05 9.15 .15 .15 % CLOSET 0.5 9.75 .15 2.22 S= 7.35 2.82 DINNING ROOM 16.45 BEDROOM MAIDS ROOM S 0.5 = S= S RAIN DRAINAGE % HALL STORAGE S= GLASS HANDRAILS 1.48 BATHROOM 0.5 1.48 CLOSET 16.96 CLOSET .15 3.95 20.88 .15 .15 BATHROOM 20.88 % .05 .30 .15 GLASS HANDRAILS 0.5 SERVICE KITCHEN S= .30 3.21 20.73 .30 9.95 GUEST ROOM 20.73 C 10.55 .30 .15 H A L L W A Y A LAUNDRY FAMILY ROOM 7.06 C C C 5.81 .05 GARDEN 7.00 .15 ROOF FLOOR 2.85 .15 8.50 .15 16.15 GARBAGE GROUND FLOOR FIRST FLOOR 20.00 MOHAMAD HOUSE FLOOR PLANS DESIGNER: ARQ MARIA GABRIELA PERAZA SCALE: 1:100 ARCHITECTURE CHECKED: DRAWN: ARQ MARIA GABRIELA PERAZA APROVAL: SCALE: 12-08-2021 SHT: 1 OF 3 REV: DWG 1 A-01