卓 冠 Manufacturer:Shanghai Eminent Enterprise Development Co., Ltd A REV 2014-July-29 Date DD-MM-YY Technical data sheets LEWIS XUHENGYU XUJIE Description of revision Composed By Check by Approved by Client: Salvador Subcontractor: 卓 冠 Designer: Shanghai Eminent Enterprise Development Co., Ltd This document is TOXPAH property. It cannot be copied or transmitted to third parties without prior authorization. Project name: TUXPAN PORT Type of documents : Products: Design plan for Marine loading arm Marine loading arm Subcontractor's documents identification: ★D ▲ MLA Rev. 001 Company Contract Number A Abbreviation: 1.“ ★” D---design document; P----procedure document; C---inspection of test O---others 2. “▲” QRH----quick release hook GT----gangway tower MLA---Marine loading arm Company’s or other entities document No.: Sheet: LINE REVISION DATA SHEET FOR MARINE LOADING ARMS WITH EMERGENCY RELEASE SYSTEM AND QUICK CONNECT / DISCONNECT COUPLING DESCRIPTION 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0 Requisition Data Loading Arms Gasoline/diesel ARM SERVICE Medium SCOPE OF SUPPLY Loading Arm -Base and Riser (Support Column) Vapour Recovery Arm -Base and Riser (Support Column) Quick Connect / Disconnect Coupling, -Coupling Spool Piece Local Instrumentation Local Instrument and Control Panel Interconnecting Wiring, including: -Cable Trays -Junction Boxes Complete Hydraulic Power System, -Power Pack(Pump & Motor) -Filters -Accumulators -Cylinders -Hydraulic Pipe work with Fittings Supporting Structure and Platforms Folding Stairs Painting and Insulation Inspection and Shop Testing Commissioning Spare parts Two (2) Years Spare Parts Set of Special Tools and Jigs DATA SHEET Nº: EIB-ML-1407 REQUISITION Nº 1407 REVISION PAGE BOG Loading A DATE 29-July-14 2 OF 6 LNG/BOG Loading Arms X X N/A N/A X X X X X X X X X X X X X N/A N/A X X Optional Optional N/A DESIGN DATA: Table 1. Arm data basic Berth No. 3 1 1 3 2 Type MLA Diameter Cargo DN400 Gasoline, diesel oil Pipe Material Working pressure (MPa.) CS20# Temperature (℃) 0.69 26 Operation ElectroHydraulic 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 4 6 On-shore flange standard On-ship flange standard Table 2. Berth data A1 A2 A3 A4 A5 A6 A7 4 7 A8 4 8 C 4 9 5 0 5 1 5 2 ANSI/150LB/WN/RF/DN400 ANSI/150LB/WN/RF/DN400 Distance between riser and jetty edge Distance between riser and surface of flange on-shore Height from center of flange to jetty surface Height of nearest obstacle on-shore Please submit the drawing of obstacle if any. The Min/Max thickness of fender The height difference from jetty surface to waterfrom line. jetty surface to the lowest The heighttiptop difference water line. The distance of two nearest loading arm center Table 3. Ship data B1 The height above water for largest ship emptied B2 The height above water for smallest laden ship 3.0m m 0.8m 1.00m 5.00m 2.40m 2.67m 4.28m 3.00m 15m 1.61m 5 3 B3 B4 The min. distance of manifold flange center to deck of ship. The height of ship’s handrail 2.1m 5 4 5 5 B5 Transverse drift (off shore) 3.0m 5 6 B6 Fore-and-aft drift (seacoast) 3.0m 5 7 B7 Max/Min. space between manifold flanges 5 8 B8 5 9 B9 The min. distance between manifold flanges to shipboard. The max distance between manifold flanges to shipboard. 6 0 Note:The letter on the table references envelope drawing. 6 1 6 2 6 3 6 4 6 5 6 6 6 7 6 8 6 9 7 0 7 1 7 2 7 3 7 4 7 5 7 6 7 7 7 8 7 9 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1 9 2 9 3 9 4 9 5 9 6 9 7 9 8 9 9 1 0 0 Table 4. Combinations of Item DN 1 N/A 2 3 4 5 6 C(m) 1.2m Depends on client 2.5m 4.6m Combination Table 5. Environmental data Max. and min. temperature Max. wind speed Earthquake Loads 26 ℃ 22m /s 7Grade Table 6. Equipped Equipped Option(X) Vacuum breaker Purge system Safety ladders Adjustable support jack Shut-off Valve QC/DC(Quick connect/Disconnect coupler Insulation flange Range limited monitoring System Electrical-Hydraulic drive system Hydraulic Emergency release coupler Electrical Trace Steam Trace Painting system Table7 Power supply Data of power Voltage Motor Limited switch Electric El-hydraulic X N/A X X N/A X X X X X N/A N/A X yellow□ White □ Hz AC DC Nacarat □ Phase Num. NOTES: The power supply depends on site A Revisi on 29-JulyDate Lewis By XUHENGYU Checked XUJIE Approved For RFQ Comments REVISION LINE DATA SHEET Nº: Shanghai Eminent Enterprise Development Co., Ltd EIB-ML-1407 REQUISITION Nº 1407 REVISION A 14 PAGE DATE 29-July- 5 OF 6 GENERAL DRAWING 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 6 0 A Revisio n 29-July-14 Date LEWIS By XUHENGYU Checked XUJIE Approved For RFQ Comments REVISION LINE DATA SHEET Nº: E I B - M L - 1 4 0 7 Shanghai Eminent Enterprise Development Co., Ltd REQUISITION Nº 1 4 0 7 REVISION A 14 PAGE DATE 29-July- 6 OF 6 ENVELOPE DRAWING 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 6 0 A Revisio n 29-July-14 Date LEWIS By XUHENGYU Checked XUJIE Approved For RFQ Comments