Fecha : 05/09/06 Presupuestos vías - Precios 2004 Página : 1 ANALISIS DETALLADOS POR SUBCAPITULO Codigo Nombre Tipo U.M. Cantidad Vr.Unitario Vr.Total 50.0000 9,450.00 472,500.00 5.0000 166,320.00 831,600.00 50.0000 13,860.00 693,000.00 1.0000 126,000.00 126,000.00 01 PRELIMINARES 01.01 PRELIMINARES 2 LOCALIZACION Y REPLANTEO KM 207 CAMPERO O SIMILAR Ins TF/HR 891 COMISION DE TOPOGRAFIA Ins DD 338 EQUIPO DE TOPOGRAFIA Ins TF/HR MOJONES, ESTACAS, PINTURA, TACOS Ins GLB 48 2,123,100.00 26 EXPLANACIONES 26.10 EXPLANACIONES 9 DEMOLICION EN CONCRETO SIMPLE M3 18,098.86 954 CARGADOR Ins TF/HR 0.0080 56,700.00 453.60 906 COMPRESOR Ins HR 0.3333 31,500.00 10,498.95 GAS Ins GLB 1.0000 1,260.00 1,260.00 958 HERRAMIENTA MENOR Y PROTECCION Ins GLB 1.0000 136.00 136.00 882 MACHINERO/TACADOR Ins JR 0.0417 42,840.00 1,786.43 960 OBRERO (2) Ins JR 0.0417 38,613.80 1,610.20 OXIGENO Ins GLB 1.0000 1,890.00 1,890.00 VOLQUETA (2) 5m3 Ins TF/HR 0.0080 57,960.00 463.68 7 6 959 11 DEMOLICIONES EN CONCRETO REFORZADO M3 29,717.00 884 AYUNDANTE (2) Ins JR 0.0416 38,615.50 954 CARGADOR Ins TF/HR 0.0080 56,700.00 453.60 906 COMPRESOR Ins HR 0.5000 31,500.00 15,750.00 961 EQUIPO OXICORTE Ins TF/HR 0.5000 12,600.00 6,300.00 GAS Ins GLB 1.0000 1,260.00 1,260.00 958 HERRAMIENTA MENOR Y PROTECCION Ins GLB 1.0000 136.00 136.00 993 MACHINERO/TACADOR 2 Ins JR 0.0417 44,540.00 1,857.32 OXIGENO Ins GLB 1.0000 1,890.00 1,890.00 VOLQUETA (2) 5m3 Ins TF/HR 0.0080 57,960.00 463.68 7 6 959 7 DESMONTE Y LIMPIEZA HA 1,606.40 435,083.53 953 BULLDOZER Ins TF/HR 5.0000 56,700.00 954 CARGADOR Ins TF/HR 0.0050 56,700.00 283.50 933 MOTOSIERRA Ins TF/HR 5.0000 15,750.00 78,750.00 957 OBRERO (3) Ins JR 1.2500 57,924.10 72,405.13 982 VOLQUETA 5m3 (2) Ins TF/HR 0.0050 28,980.00 144.90 6 DESMONTE Y LIMPIEZA EN ZONA BOSCOSA HA 283,500.00 525,646.03 953 BULLDOZER Ins TF/HR 6.2500 56,700.00 954 CARGADOR Ins TF/HR 0.0050 56,700.00 283.50 933 MOTOSIERRA Ins TF/HR 6.2500 15,750.00 98,437.50 957 OBRERO (3) Ins JR 1.2500 57,924.10 72,405.13 982 VOLQUETA 5m3 (2) Ins TF/HR 0.0050 28,980.00 144.90 12 EXCAVACION EN MATERIAL COMUN M3 354,375.00 2,268.00 Fecha : Presupuestos vías - Precios 2004 05/09/06 Página : 2 ANALISIS DETALLADOS POR SUBCAPITULO Codigo Nombre Tipo U.M. Cantidad Vr.Unitario Vr.Total 953 BULLDOZER Ins TF/HR 0.0200 56,700.00 1,134.00 954 CARGADOR Ins TF/HR 0.0200 56,700.00 1,134.00 13 EXCAVACIONES EN ROCA M3 10,259.49 953 BULLDOZER Ins TF/HR 0.0714 56,700.00 954 CARGADOR Ins TF/HR 0.0100 56,700.00 567.00 906 COMPRESOR Ins HR 0.0714 31,500.00 2,249.10 10 DINAMITA INDUGEL PLUS Ins KG 0.2000 8,190.00 1,638.00 15 FULMINANTE No. 8 Ins UN 1.0000 496.00 496.00 MACHINERO/TACADOR 2 Ins JR 0.0143 44,540.00 636.92 MECHA LENTA Ins ML 0.6000 580.00 348.00 OBRERO Ins JR 0.0143 19,306.90 276.09 993 14 881 17 REMOCION DE DERRUMBES M3 4,048.38 1,895.22 900 CARGADOR CAT 930 Ins HR 0.0250 63,000.00 965 HERRAMIENTA MENOR (10% M.O.) Ins GLB 1.0000 14.66 14.66 957 OBRERO (3) Ins JR 0.0031 57,924.10 179.56 955 VOLQUETA 5 M3 Ins TF/HR 0.0050 25,200.00 126.00 16 TERRAPLENES M3 1,575.00 5,292.00 902 CARROTANQUE Ins HR 0.0167 37,800.00 964 COMPACTADOR VIBRATORIO Ins TF/HR 0.0166 50,400.00 836.64 932 MOTONIVELADORA CAT 120G Ins HR 0.0167 63,000.00 1,052.10 963 RETROEXCAVADORA Ins TF/HR 0.0400 44,100.00 1,764.00 955 VOLQUETA 5 M3 Ins TF/HR 0.0400 25,200.00 1,008.00 0.0222 28,980.00 18 TRANSPORTE DE MATERIAL 982 VOLQUETA 5m3 (2) M3-KM Ins TF/HR 631.26 643.36 643.36 27 ESTRUCTURAS Y DRENAJES 27.13 ESTRUCTURAS Y DRENAJES 26 ACERO DE REFUERZO GRADO 37 KG 1,604.56 69 ACERO FIG.37000 PSI 3/8`` Ins KG 1.0500 1,260.00 1,323.00 24 ALAMBRE NEGRO PARA AMARRE Ins KG 0.0250 1,512.00 37.80 1,005 HERRAMIENTA MENOR (10%) 6 Ins GLB 1.0000 22.16 22.16 1,006 OBRERO 2 Ins JR 0.0040 17,538.90 70.16 OFICIAL Ins JR 0.0040 37,859.00 151.44 886 25 ACERO DE REFUERZO GRADO 60 KG 1,736.86 23 ACERO DE Fy=4200 kg/cm2 Ins KG 1.0500 1,386.00 1,455.30 24 ALAMBRE NEGRO PARA AMARRE Ins KG 0.0250 1,512.00 37.80 1,005 HERRAMIENTA MENOR (10%) 6 Ins GLB 1.0000 22.16 22.16 1,006 OBRERO 2 Ins JR 0.0040 17,538.90 70.16 OFICIAL Ins JR 0.0040 37,859.00 151.44 886 30 ALCANTARILLAS DE 36" ML 656,314.57 30 CONCRETO CLASE F (solad y atraq) Ins M3 0.5000 233,833.00 116,916.50 29 CONCRETO CLASE G (bases-elevac) Ins M3 1.1700 189,447.00 221,652.99 HERRAMIENTA MENOR Y PROTECCION 4 Ins GLB 1.0000 9,166.67 9,166.67 1,009 Fecha : 05/09/06 Presupuestos vías - Precios 2004 Página : 3 ANALISIS DETALLADOS POR SUBCAPITULO Codigo Nombre Tipo U.M. Cantidad Vr.Unitario Vr.Total MATERIAL SELECCIONADO PARA RELLENO Ins M3 1.6700 8,694.00 14,518.98 960 OBRERO (2) Ins JR 1.3888 38,613.80 53,626.85 886 OFICIAL Ins JR 1.3888 37,859.00 52,578.58 TUBERIA EN CONCRETO CLASE D 36" Ins ML 1.0000 187,854.00 187,854.00 28 31 22 CONCRETO CLASE D M3 229,229.01 19 AGREGADO Ins M3 0.8400 31,500.00 88 AGUA Ins LT 160.0000 25.00 4,000.00 126 ARENA LAVADA DE PEÑA Ins M3 0.5600 31,500.00 17,640.00 205 CEMENTO GRIS Ins KG 350.0000 277.00 96,950.00 970 FORMALETA * Ins UN 1.8190 11,000.00 20,009.00 HERRAMIENTA MENOR (10%) 3 Ins GLB 1.0000 4,917.17 4,917.17 887 MAESTRO Ins JR 0.2000 53,550.00 10,710.00 968 MEZCLADORA 1 BULTO Ins TF/HR 1.6000 3,937.50 6,300.00 971 OBRERO (8) Ins JR 0.2000 154,455.20 30,891.04 886 OFICIAL Ins JR 0.2000 37,859.00 7,571.80 969 VIBRADOR DE CONCRETO Ins TF/HR 1.6000 2,362.50 3,780.00 1,000 23 CONCRETO CLASE F M3 26,460.00 192,212.18 19 AGREGADO Ins M3 0.8300 31,500.00 88 AGUA Ins LT 165.0000 25.00 4,125.00 126 ARENA LAVADA DE PEÑA Ins M3 0.6500 31,500.00 20,475.00 205 CEMENTO GRIS Ins KG 260.0000 277.00 72,020.00 970 FORMALETA * Ins UN 0.9090 11,000.00 9,999.00 1,001 HERRAMIENTA MENOR (10%) 4 Ins GLB 1.0000 4,133.31 4,133.31 1,002 MAESTRO 2 Ins JR 0.1666 55,675.00 9,275.46 968 MEZCLADORA 1 BULTO Ins TF/HR 2.2222 3,937.50 8,749.91 971 OBRERO (8) Ins JR 0.1666 154,455.20 25,732.24 886 OFICIAL Ins JR 0.1666 37,859.00 6,307.31 969 VIBRADOR DE CONCRETO Ins TF/HR 2.2222 2,362.50 5,249.95 24 CONCRETO CLASE G M3 26,145.00 151,509.39 19 AGREGADO Ins M3 0.4980 31,500.00 88 AGUA Ins LT 99.0000 25.00 2,475.00 126 ARENA LAVADA DE PEÑA Ins M3 0.3900 31,500.00 12,285.00 205 CEMENTO GRIS Ins KG 156.0000 277.00 43,212.00 970 FORMALETA * Ins UN 1.0000 11,000.00 11,000.00 HERRAMIENTA MENOR (10%) 5 Ins GLB 1.0000 4,454.36 4,454.36 MEZCLADORA 1 BULTO Ins TF/HR 1.3340 3,937.50 5,252.63 OBRERO (8) 2 Ins JR 0.2500 140,314.60 35,078.65 OFICIAL Ins JR 0.2500 37,859.00 9,464.75 PIEDRA RAJON Ins M3 0.4000 31,500.00 12,600.00 1,003 968 1,004 886 22 27 CONST. CUNETAS CONCRETO CLASE F M3 15,687.00 195,781.80 19 AGREGADO Ins M3 0.8300 31,500.00 88 AGUA Ins LT 165.0000 25.00 4,125.00 126 ARENA LAVADA DE PEÑA Ins M3 0.6500 31,500.00 20,475.00 205 CEMENTO GRIS Ins KG 260.0000 277.00 72,020.00 970 FORMALETA * Ins UN 1.0000 11,000.00 11,000.00 HERRAMIENTA MENOR (10%) 7 Ins GLB 1.0000 4,959.57 4,959.57 1,007 26,145.00 Fecha : 05/09/06 Presupuestos vías - Precios 2004 Página : 4 ANALISIS DETALLADOS POR SUBCAPITULO Codigo Nombre Tipo U.M. Cantidad Vr.Unitario Vr.Total MAESTRO 2 Ins JR 0.2000 55,675.00 11,135.00 968 MEZCLADORA 1 BULTO Ins TF/HR 1.3340 3,937.50 5,252.63 971 OBRERO (8) Ins JR 0.2000 154,455.20 30,891.04 886 OFICIAL Ins JR 0.2000 37,859.00 7,571.80 SELLADO DE JUNTAS Esp % 1.1365 193,575.04 2,206.76 1,002 1 19 EXC. ESTRUC. MAT. COMUN M3 14,159.12 994 HERRAMIENTA MENOR Y PROTECCION (2) Ins GLB 1.0000 1,287.21 1,287.21 881 OBRERO Ins JR 0.6667 19,306.90 12,871.91 20 EXC. ESTRUC. ROCA M3 22,952.48 COMPRESOR Ins HR 0.4000 31,500.00 12,600.00 10 DINAMITA INDUGEL PLUS Ins KG 0.4000 8,190.00 3,276.00 15 FULMINANTE No. 8 Ins UN 1.0000 496.00 496.00 995 HERRAMIENTA MENOR Y PROTECCION (3) Ins GLB 1.0000 492.77 492.77 882 MACHINERO/TACADOR Ins JR 0.0500 42,840.00 2,142.00 MECHA LENTA Ins ML 2.0000 580.00 1,160.00 OBRERO (3) 3 Ins JR 0.0500 55,714.10 2,785.71 906 14 1,201 28 FILTROS CON GEOTEXTIL M3 39,924.74 GEOTEXTIL Ins M2 7.5000 1,260.00 HERRAMIENTA MENOR (10%) 8 Ins GLB 1.0000 2,243.15 2,243.15 27 MATERIAL FILTRANTE Ins M2 0.3800 34,038.00 12,934.44 28 26 1,008 9,450.00 MATERIAL SELECCIONADO PARA RELLENO Ins M3 0.6600 8,694.00 5,738.04 960 OBRERO (2) Ins JR 0.1250 38,613.80 4,826.73 886 OFICIAL Ins JR 0.1250 37,859.00 4,732.38 31 GAVIONES M3 69,355.58 ALAMBRE GALVANIZADO Ins KG 0.5000 1,764.00 882.00 HERRAMIENTA MENOR (10%) 9 Ins GLB 1.0000 152.43 152.43 MALLA PARA GAVION Ins UN 1.0000 22,680.00 22,680.00 967 OBRERO (4) Ins JR 0.1667 77,227.60 12,873.84 886 OFICIAL Ins JR 0.1666 37,859.00 6,307.31 33 PIEDRA Ins M3 1.0500 25,200.00 26,460.00 34 1,010 32 21 RELLENO MAT. SELECCIONADO M3 13,556.71 966 COMPACTADOR MANUAL (RANA) Ins TF/HR 0.2500 2,835.00 998 HERRAMIENTA MENOR (10%) 2 Ins GLB 1.0000 219.24 219.24 MATERIAL SELECCIONADO PARA RELLENO Ins M3 1.2000 8,694.00 10,432.80 OBRERO (4) 2 Ins JR 0.0313 70,157.30 2,195.92 28 999 708.75 28 ESTRUCTURA DE PAVIMENTO 28.12 ESTRUCTURA DE PAVIMENTO 36 BASE GRANULAR M3 34,059.38 CARROTANQUE Ins HR 0.0250 37,800.00 945.00 MATERIAL DE BASE Ins M3 1.2500 24,223.50 30,279.38 932 MOTONIVELADORA CAT 120G Ins HR 0.0250 63,000.00 1,575.00 948 VIBROCOMPACTADOR CA 15 Ins HR 0.0250 50,400.00 1,260.00 902 38 Fecha : Presupuestos vías - Precios 2004 05/09/06 Página : 5 ANALISIS DETALLADOS POR SUBCAPITULO Codigo Nombre Tipo U.M. 43 BASE GRAVA-CEMENTO 1,012 205 1,019 929 Cantidad Vr.Unitario 130.0000 11.34 1,474.20 277.00 16,620.00 M3 Vr.Total 56,815.12 AGUA 2 Ins Lt CEMENTO GRIS Ins KG 60.0000 HERRAMIENTA MENOR (10%) 13 Ins GLB 1.0000 308.18 308.18 IRRIGADOR Ins DD 0.0334 37,800.00 1,262.52 MATERIAL DE BASE Ins M3 1.2500 24,223.50 30,279.38 932 MOTONIVELADORA CAT 120G Ins HR 0.0334 63,000.00 2,104.20 957 OBRERO (3) Ins JR 0.0500 57,924.10 2,896.21 883 OFICIAL ESPECIALIZADO Ins JR 0.0042 44,540.00 187.07 948 VIBROCOMPACTADOR CA 15 Ins HR 0.0334 50,400.00 1,683.36 40.0000 630.00 38 42 BASE GRAVA-EMULSION M3 63,901.34 EMULSION ASFALTICA TIPO CRL-1 Ins Lt HERRAMIENTA MENOR (10%) 13 Ins GLB 1.0000 308.18 308.18 IRRIGADOR Ins DD 0.0333 37,800.00 1,258.74 MATERIAL DE BASE Ins M3 1.2500 24,223.50 30,279.38 932 MOTONIVELADORA CAT 120G Ins HR 0.0333 63,000.00 2,097.90 957 OBRERO (3) Ins JR 0.0500 57,924.10 2,896.21 883 OFICIAL ESPECIALIZADO Ins JR 0.0041 44,540.00 182.61 948 VIBROCOMPACTADOR CA 15 Ins HR 0.0333 50,400.00 1,678.32 40 1,019 929 38 39 CONCRETO ASFALTICO M3 25,200.00 193,901.24 974 COMPACTADOR NEUMATICO Ins TF/HR 0.0167 44,100.00 973 COMPACTADOR RODILLO LISO Ins TF/HR 0.0167 44,100.00 736.47 CONCRETO ASFALTICO Ins M3 1.2500 151,200.00 189,000.00 41 736.47 HERRAMIENTA MENOR (10%) 11 Ins GLB 1.0000 82.92 82.92 971 OBRERO (8) Ins JR 0.0041 154,455.20 633.27 883 OFICIAL ESPECIALIZADO Ins JR 0.0042 44,540.00 187.07 975 TERMINADOR DE ASFALTO Ins TF/HR 0.0334 75,600.00 2,525.04 50.0000 11.34 1,017 34 ESTAB. AFIRMADO CON CEMENTO M3 38,798.64 AGUA 2 Ins Lt 902 CARROTANQUE Ins HR 0.0500 37,800.00 1,890.00 205 CEMENTO GRIS Ins KG 60.0000 277.00 16,620.00 1,013 HERRAMIENTA MENOR Y PROTECCION 6 Ins GLB 1.0000 46.86 46.86 1,002 MAESTRO 2 Ins JR 0.0063 55,675.00 350.75 1,012 567.00 MATERIAL DE AFIRMADO Ins M3 1.2000 8,914.50 10,697.40 932 MOTONIVELADORA CAT 120G Ins HR 0.0500 63,000.00 3,150.00 881 OBRERO Ins JR 0.0063 19,306.90 121.63 972 RETROEXCAVADORA Ins TF/HR 0.0500 56,700.00 2,835.00 948 VIBROCOMPACTADOR CA 15 Ins HR 0.0500 50,400.00 2,520.00 50.0000 11.34 567.00 35 33 ESTAB. AFIRMADO CON ENZIMAS M3 26,775.71 AGUA 2 Ins Lt CARROTANQUE Ins HR 0.0500 37,800.00 1,890.00 ENCIMAZ ORGANICAS Ins Lt 0.0500 91,980.00 4,599.00 1,013 HERRAMIENTA MENOR Y PROTECCION 6 Ins GLB 1.0000 46.86 46.86 1,002 MAESTRO 2 Ins JR 0.0063 55,675.00 350.75 MATERIAL DE AFIRMADO Ins M3 1.2000 8,914.50 10,697.40 1,012 902 36 35 Fecha : Presupuestos vías - Precios 2004 05/09/06 Página : 6 ANALISIS DETALLADOS POR SUBCAPITULO Codigo Nombre Tipo U.M. Cantidad Vr.Unitario Vr.Total 932 MOTONIVELADORA CAT 120G Ins HR 0.0500 63,000.00 3,150.00 881 OBRERO Ins JR 0.0062 19,306.90 119.70 972 RETROEXCAVADORA Ins TF/HR 0.0500 56,700.00 2,835.00 948 VIBROCOMPACTADOR CA 15 Ins HR 0.0500 50,400.00 2,520.00 1,386.00 37 GEOTEXTIL PARA REFUERZO M2 2,014.68 GEOTEXTIL NT 1600 Ins M2 1.2000 HERRAMIENTA MENOR Y PROTECCION 7 Ins GLB 1.0000 35.40 35.40 957 OBRERO (3) Ins JR 0.0033 57,924.10 191.15 886 OFICIAL Ins JR 0.0033 37,859.00 124.93 630.00 352 1,015 38 IMPRIMACION CON EMULSION ASFALTICA M2 1,663.20 771.80 EMULSION ASFALTICA TIPO CRL-1 Ins Lt 1.0000 HERRAMIENTA MENOR (10%) 10 Ins GLB 1.0000 1.61 1.61 929 IRRIGADOR Ins DD 0.0033 37,800.00 124.74 960 OBRERO (2) Ins JR 0.0004 38,613.80 15.45 40 1,016 32 MATERIAL DE AFIRMADO M3 630.00 27,533.43 CARROTANQUE Ins HR 0.0416 37,800.00 HERRAMIENTA MENOR Y PROTECCION 5 Ins GLB 1.0000 2,520.00 2,520.00 MATERIAL DE AFIRMADO Ins M3 1.2000 8,914.50 10,697.40 932 MOTONIVELADORA CAT 120G Ins HR 0.0417 63,000.00 2,627.10 881 OBRERO Ins JR 0.0052 19,306.90 100.40 886 OFICIAL Ins JR 0.0052 37,859.00 196.87 972 RETROEXCAVADORA Ins TF/HR 0.0250 56,700.00 1,417.50 948 VIBROCOMPACTADOR CA 15 Ins HR 0.0417 50,400.00 2,101.68 955 VOLQUETA 5 M3 Ins TF/HR 0.2500 25,200.00 6,300.00 902 1,011 35 35 SUBBASE GRANULAR M3 1,572.48 28,224.00 CARROTANQUE Ins HR 0.0200 37,800.00 756.00 MATERIAL DE SUBBASE Ins M3 1.2500 20,160.00 25,200.00 932 MOTONIVELADORA CAT 120G Ins HR 0.0200 63,000.00 1,260.00 948 VIBROCOMPACTADOR CA 15 Ins HR 0.0200 50,400.00 1,008.00 902 37 40 TRATAMIENTO SUPERFICIAL DOBLE M2 5,169.60 AGREGADO PETREO Ins M3 0.0300 37,800.00 1,134.00 974 COMPACTADOR NEUMATICO Ins TF/HR 0.0100 44,100.00 441.00 977 DISTRIBUIDOR DE AGREGADO Ins TF/HR 0.0100 31,500.00 315.00 978 EMULSION ASFALTICA CRR-2 Ins Lt 4.2500 630.00 2,677.50 42 HERRAMIENTA MENOR (10%) 12 Ins GLB 1.0000 20.05 20.05 929 IRRIGADOR Ins DD 0.0100 37,800.00 378.00 976 OBRERO (6) Ins JR 0.0013 115,848.20 150.60 883 OFICIAL ESPECIALIZADO Ins JR 0.0012 44,540.00 53.45 1.0000 250.85 1,018 29 CONSERVACION 29.10 CONSERVACION 45 BACHEO EN AFIRMADO 1,020 HERRAMIENTA MENOR Y PROTECCION 8 M3 Ins GLB 14,464.94 250.85 Fecha : Presupuestos vías - Precios 2004 05/09/06 Página : 7 ANALISIS DETALLADOS POR SUBCAPITULO Codigo Nombre Tipo U.M. Cantidad Vr.Unitario Vr.Total MATERIAL DE AFIRMADO Ins M3 1.2000 8,914.50 10,697.40 960 OBRERO (2) Ins JR 0.0333 38,613.80 1,285.84 886 OFICIAL Ins JR 0.0323 37,859.00 1,222.85 981 VIBROCOMPACTADOR MANUAL Ins TF/HR 0.2500 4,032.00 1,008.00 35 44 CONFORMACION DE LA BANCA M2 182.15 902 CARROTANQUE Ins HR 0.0013 37,800.00 49.14 979 COMPACTADOR VIBRATORIO (2) Ins TF/HR 0.0013 44,100.00 57.33 980 MOTONIVELADORA CAT-120 (2) Ins TF/HR 0.0012 59,850.00 71.82 881 OBRERO Ins JR 0.0002 19,306.90 3.86 126,000.00 52 FRESADO DE CALZADA M2 7,351.09 FRESADORA DE PAVIMENTO Ins TF/HR 0.0500 HERRAMIENTA MENOR (10%) 16 Ins GLB 1.0000 60.34 60.34 985 OBRERO (5) Ins JR 0.0063 96,541.30 608.21 982 VOLQUETA 5m3 (2) Ins TF/HR 0.0132 28,980.00 382.54 986 1,027 49 LIMPIEZA DE ALCANTARILLAS D=36" ML 6,300.00 11,235.05 HERRAMIENTA MENOR Y PROTECCION 11 Ins GLB 1.0000 1,680.00 1,680.00 881 OBRERO Ins JR 0.4167 19,306.90 8,045.19 982 VOLQUETA 5m3 (2) Ins TF/HR 0.0521 28,980.00 1,509.86 1,024 48 LIMPIEZA DE CUNETAS EN TIERRA 1,023 960 ML Ins GLB 1.0000 226.80 226.80 OBRERO (2) Ins JR 0.0200 38,613.80 772.28 47 LIMPIEZA DE CUNETAS REVESTIDAS 1,022 960 999.08 HERRAMIENTA MENOR Y PROTECCION 10 ML 833.85 HERRAMIENTA MENOR Y PROTECCION 9 Ins GLB 1.0000 189.00 189.00 OBRERO (2) Ins JR 0.0167 38,613.80 644.85 46 PARCHEO PAVIMENTO M3 212,358.10 COMPACTADOR VIBRATORIO (2) Ins TF/HR 0.0333 44,100.00 1,468.53 CONCRETO ASFALTICO Ins M3 1.2500 151,200.00 189,000.00 HERRAMIENTA MENOR (10%) 14 Ins GLB 1.0000 1,990.05 1,990.05 971 OBRERO (8) Ins JR 0.1000 154,455.20 15,445.52 883 OFICIAL ESPECIALIZADO Ins JR 0.1000 44,540.00 4,454.00 979 41 1,021 50 ROSERIA HA 189,919.57 984 HERRAMIENTA MENOR (15% MO) Ins GLB 1.0000 17,212.12 17,212.12 983 OBRERO (10) Ins JR 0.5000 193,080.90 96,540.45 OFICIAL 2 Ins JR 0.5000 36,414.00 18,207.00 VOLQUETA 5m3 (2) Ins TF/HR 2.0000 28,980.00 57,960.00 630.00 1,025 982 51 SELLAM. FISURAS CON EMULSION M2 909.01 EMULSION ASFALTICA TIPO CRL-1 Ins Lt 1.0000 HERRAMIENTA MENOR (10%) 15 Ins GLB 1.0000 24.14 24.14 976 OBRERO (6) Ins JR 0.0021 115,848.20 243.28 982 VOLQUETA 5m3 (2) Ins TF/HR 0.0004 28,980.00 11.59 40 1,026 30 SEÑALIZACION Y CONTROL DE TRANSITO 630.00 Fecha : 05/09/06 Presupuestos vías - Precios 2004 Página : 8 ANALISIS DETALLADOS POR SUBCAPITULO Codigo Nombre Tipo U.M. Cantidad Vr.Unitario Vr.Total 30.06 SEÑALIZACION Y CONTROL DE TRANSITO 56 DEFENSAS METALICAS ML 78,064.04 51 ACCESORIOS Ins GLB 1.0000 5,500.00 5,500.00 49 DEFENSA METALICA Ins ML 1.0000 51,030.00 51,030.00 HERRAMIENTA MENOR (10%) 20 Ins GLB 1.0000 239.46 239.46 957 OBRERO (3) Ins JR 0.0250 57,924.10 1,448.10 886 OFICIAL Ins JR 0.0250 37,859.00 946.48 POSTE PARA DEFENSA Ins UN 0.5000 37,800.00 18,900.00 1,031 50 57 POSTES DE KILOMETRAJE UN 60,285.96 CONCRETO ANCLAJE CLASE F Ins GLB 1.0000 6,300.00 HERRAMIENTA MENOR (10%) 21 Ins GLB 1.0000 382.32 382.32 960 OBRERO (2) Ins JR 0.0500 38,613.80 1,930.69 886 OFICIAL Ins JR 0.0500 37,859.00 1,892.95 POSTE DE KILOMETRAJE Ins UN 1.0000 49,780.00 49,780.00 991 1,032 52 53 SEÑALES VERTICALES UN 6,300.00 85,141.23 988 CAMIONETA D-300 Ins TF/HR 0.5000 9,450.00 4,725.00 987 CONCRETO CLASE G (2) Ins M3 0.0500 151,557.93 7,577.90 HERRAMIENTA MENOR (10%) 17 Ins GLB 1.0000 321.80 321.80 OBRERO (2) Ins JR 0.0833 38,613.80 3,216.53 SEÑAL VERTICAL Ins UN 1.0000 69,300.00 69,300.00 4,410.00 1,028 960 43 54 SEÑALIZACION HORIZONTAL ML 577.35 ESFERAS REFLECTIVAS Ins KG 0.0050 HERRAMIENTA MENOR (10%) 18 Ins GLB 1.0000 3.01 3.01 971 OBRERO (8) Ins JR 0.0002 154,455.20 30.89 886 OFICIAL Ins JR 0.0001 37,859.00 3.79 PINTURA DE TRAFICO Ins GL 0.0140 34,272.00 479.81 VEHICULO DELINEADOR Ins TF/HR 0.0012 31,500.00 37.80 337 1,029 45 989 55 TACHAS REFLECTIVAS UN 22.05 29,159.41 HERRAMIENTA MENOR (10%) 19 Ins GLB 1.0000 47.64 47.64 881 OBRERO Ins JR 0.0083 19,306.90 160.25 886 OFICIAL Ins JR 0.0084 37,859.00 318.02 990 PEGANTE EPOXICO Ins Lt 0.0500 5,670.00 283.50 47 TACHA REFLECTIVA Ins UN 1.0000 28,350.00 28,350.00 1,030 **********