The most recent final figures for maintenance works for No.11, which includes the state rooms and offices and the No.10 flat, are: 2007-8 - £39,644 2008-9 - £37,022 2009-10 - £10,140 2010-11 - £32,651 This has covered the costs of essential maintenance work in the No.10 flat since May 2010 and has included: Electrical works and plumbing; Structural improvements; General maintenance and restoration; and Flooring. No public money since May 2010 was spent on: Bathroom appliances, furniture, fixture or fittings; Wall furnishings; or Kitchen appliances, furniture, furnishings or accessories. Information on the cost of running and maintaining HM Treasury buildings, which includes the space within Downing Street, is published after the end of the financial year in the HM Treasury Annual Reports and Accounts, which can be accessed on the HM Treasury website at: www.hm-treasury.gov.uk/d/annual_report_accounts140711.pdf. In addition to published information, HM Treasury hold a schedule of works which is relevant to your request. This is released here. Specifications for No10 works Room 257 Remove redundant fittings Cupboards Fridge Flooring Electrical work Room 256 Storage Floor maintenance Electrical work Connect gas supply Room 260 Put up shelves Flooring Electrical work Room 255 Maintain floor Electrical work Gas supply Room 253 Work surface and machines Storage Sink Fridge Flooring Room 252 Electrical work Door Storage Room 250 Electrical work Flooring Room 249 Bathroom fittings Room 248 Sink Cupboards Toilet Floor Towel rail Room 247 Structural improvements Make good structure Electrical work Carpet Room 251 Bathroom fittings Access Room 245 Electrical works Carpet Room 244 Flooring Electrical works Room 242 Bathroom fittings Flooring Tiles Units Room 241 Electrics Flooring Room 237 Flooring Remove electrics Room 238 Tiles Flooring Painting as required