PINEWOOD STUDIOS DEVELOPMENT FRAMEWORK PRINCIPLES AND PARAMETERS 16 DOCUMENT FEBRUARY 2013 2 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS Contents Produced on behalf of Pinewood Studios Ltd by: Arup Associates - Masterplanners and Sustainability Consultants Arup - Infrastructure and Environmental Consultants 01 Introduction Randall Thorp - Landscape Consultants 02 Development Proposed Vectos - Transport Consultants 03 Development Principles Turley Associates - Planning Consultants 04 Parameters CBRE - Development Consultants 05 Explanation of Parameters Arup Associates 8 Fitzroy Street London W1T 4BJ United Kingdom T +44 (0)20 775 55555 www.arupassociates.com www.arup.com 3 4 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 01INTRODUCTION T his document is the principal design document for approval as part This document creates a flexible and adaptable approach to the future of the Pinewood Studios Development Framework outline planning development of the site, within clearly defined parameters, including application. It contains baseline and parameter drawings following an anatomy of open space, access and movement, and massing an explanation of the defining set of principles that have informed the and a set of written development principles. These Principles and framework design. Parameters focus on the definition of open space, landscape, and development areas, and on the treatment and character of boundaries It comprises a set of written development principles and a series of and different areas within the overall development. The primary parameter plans for site layout, landscaping and ecology measures, road and access routes are established to ensure the site evolves building massing and gross external floor areas and access and with a clear anatomy that endures as the phases of development are circulation. Together, these provide the framework within which more implemented over time. detailed ‘reserved matters’ applications will be prepared in the future. The precise design scale and siting of each building and its individual An explanation of how the Parameter drawings are to be interpreted appearance is left illustrative at this stage, allowing for future design and applied is also provided. development and evolution as the project is implemented over time. The parameters form the basis of the scheme assessed in the DF D&A Principles and Parameters FOR APPROVAL Design and Access Statement SUPPORTING INFORMATION IM Illustrative Masterplan NOT FOR APPROVAL Environmental Statement. 02 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 5 Development Proposed 6 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 02 THE DESCRIPTION OF DEVELOPMENT “Reconfiguration and expansion of facilities for screen based media, including film, television and video games, and associated services and industries, comprising: demolition of existing outdated accommodation; erection of new stages, workshops, office accommodation, demountable modular buildings, entrance structures and reception and security offices, gas CHP energy centre, underground waste water treatment plant, recycling facilities, backlots and film streetscapes; external film production; creation of a new vehicular and pedestrian access from Pinewood Road, emergency access from Sevenhills Road, access roads within the site, surface and multi-level car parking; and associated landscaping and ecological habitat creation works.” Within this description of development formal approval is being sought for a mix of detail and outline elements. Detailed approval is sought for: • description of development • overall schedule of accommodation • vehicular access from the public highway Outline approval is sought for: • guiding Development Principles • controlling Parameters: - use and quantum - development zones - green space - landscaping and ecology - movement - building scale and massing 03 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 7 Development Principles 8 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 03 DEVELOPMENT PRINCIPLES There are high order strategic guiding principles which have been influential in the development of the design solution for PSDF. The development principles are set out below in support of the application; some will be suitable for inclusion as conditions in any planning permission. Capturing growth in the international film industry 1. Meeting globally-arising market needs at Pinewood within the West London strategic film and media cluster in support of the key growth ambition of the UK film industry and economy. This is the fundamental commercial/economic driver for the Pinewood Studios scheme and is the basis of the economic case for the PSDF. The market and commercial case is analysed in the application documents which demonstrate insufficient current capacity in the UK to capture international growth and inward investment. Raising production capability 2. Increasing film, TV and other screen based media production capability at the Pinewood Studios site. The capability principle is driven by the need for more studio space in the UK and the requirements of film producers for larger, more flexible studio facilities located alongside all the production/creative/technical resources that are required on hand. Capability therefore includes detailed consideration of overall capacity, range and flexibility of production buildings and spaces, ancillary accommodation and support services including technological provision. The PSDF seeks to resolve all of these requirements in its design process and outcome. Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS Achieving sustainable development Landscape-led 3. 5. Creating a genuinely sustainable development by design. 9 Adopting a landscape-led design process that is integrated into the development. Achieving sustainable development is a key policy requirement of the National Planning Policy Framework and a leading influence on the The application site is in part undeveloped open land with a range of design process and outcome. natural landscape features. The design process is intended to set the proposed development within a structural landscaped context to Sustainability is to be achieved in two related ways: - technical sustainability of design and mitigation - strategic sustainability by balancing of economic, social and environmental considerations. minimise any adverse effects. Ecological enhancements Both exercises are carried out in the application documents. 6. The ecological value and biodiversity of the site to be subject to a principle of minimal disruption and the promotion of measures for Optimising the use of existing Pinewood estate enhancement. The application site has a significant ecological asset value which will be affected by any development. The guiding principle is to maintain 4. Making best use of non-Green Belt and previously developed land before use of Green Belt land. The most effective and efficient use of the existing Pinewood Studios site to meet development requirements is a guiding principle subject to achieving an acceptable overall operating environment. and enhance the best of the asset and mitigate impacts through an ecological strategy. 10 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 03 DEVELOPMENT PRINCIPLES Protecting local amenity 7. The development process and outcome maintain and where possible enhance the amenity of neighbouring users/uses. The application site is adjoined by a mix of residential, Country Park and agricultural land neighbouring uses. The principle is to demonstrate a solution that respects the amenity of neighbours in terms of activity and appearance. Dedicated use for film/media production 8. The Pinewood Studios expansion is for the purpose of improvement of the film, TV and screen based media hub as a single integrated facility. The development has a particular and exceptional justification that should be reflected in its design, development and operation. 04 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 11 Parameters 12 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 04 PARAMETERS The Parameters are defined in a set of drawings contained within this document • Use and Quantum (Plans P-P-003, P-P-004 and P-P-007) • Development Zones and Levels (P-P-003) • Green Space (P-P-001) • Landscaping and Ecology (P-P-002) • Site Access and Circulation (P-P-005) • Building Scale and Massing (P-P-006 and P-P-007) What are Development Parameters? The development parameters establish a framework for the future redevelopment of the site. Amongst other things they establish the areas of the site that may be built on, and the areas that will be landscaped. Maximum/minimum footprints and heights for all building types are defined as are the locations of primary and secondary access roads, subject to limited levels of deviation. In the future more detailed “reserved matters” applications will be prepared. These applications will be required to demonstrate compliance with the parameters defined in this document. Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS The baseline, application, and parameter drawings for approval follow. All other drawings fall separately under the design and access statement, illustrative masterplan document and other supporting documentation not intended for approval. Drawings for Approval category title Baseline Drawings P-B-000 P-B-001 P-B-002 Application Site Boundary Existing Site Plan Baseline Plan Application Drawings P-A-001 P-A-002-1 P-A-002-2 P-A-002-3 P-A-003 P-A-004 Proposed Demolitions Tree Removal Plan, Sheet 1 Tree Removal Plan, Sheet 2 Tree Removal Plan, Sheet 3 Site Access, Pinewood Road Main Entrance Plan Site Access, Seven hills Road, Emergency Access Plan Parameter Drawings P-P-001 P-P-002 P-P-003 P-P-004 P-P-005 P-P-006 P-P-007 Green Space Landscape and Ecology Development Zones and Levels Areas by Development Zone Site Access and Circulation Building Plots Areas and Dimensions by Plot Baseline Drawings 110125-A-28 110125-B-38 Site Location Plan Site Location Plan 110125-A-27 110125-B-26 FPR-TR-001 Extents of Works Plan Highway Improvement Scheme Tree Removal Plan PSDF List of Drawings for Approval FPR List of Drawings for Approval Application Drawings 13 A B C D E F Lodge G H I J K L M N G:\Jobs\224788-10 PSB - ARAS\4-03 Drawings\4-03-01-02 Arch\Planning\P-B-000.dwg 23 Jan 2013 15:20:10 id: 9F5B5E99-14E1-4CA3-A847-9614346AC67D Amparo.Galvan A1 Pond Gantry Planning Application Boundary N Mast 67.1m 1 Cherry Orchard Pond Farm Hill View Home Farm Cherry Orchard Saul's Farm Blanchard's Farm Farm Bungalow 66.6m Pond Astraea 70.1m St Benedict 4 Tennis 2 Court 1 Larkswood Springfield Cottages 70.4m Long Coppice Langley Woodhouse Hollydene LB Pine Cottage Belle Farm Dick Turpins Cottage Parkspring Lodge Wood Pantiles Cottage Belle Farm 3 Lodge The Firs Presbytery 70.0m Belle Farm Cottage 55.6m Woodcroft Sevenhills Farm The Bridgettine Convent 57.3m Clump Cottage West Clump Cottage East Posts Weir 4 The Oaks Nursery EAST AREA Gantry Dromenagh Farm 5 The Clump Strawberry Wood Pond Dromenagh Farm House 67.6m El Sub Sta Pump House 6 0 XXXXXX / / Issued for Outline Planning Approval Issue Date Pond Pump House Black Park Ponds Arup Associates Knoll House Water Tower Heathwood 7 WEST AREA Pond Cattle Grid Bratton Maythorn 13 Fitzroy Street London W1T 4BQ United Kingdom t +44 20 7755 2525 www.arupassociates.com Cottage Heath Farm 106 Pinewood Mews 94 2 1 82 Pinewood Film The Stables 118 70 6 Double Studios Key Plan The Bungalow Lodge 89 7 9 North 58 77 120 to 142 Lodge 12 101 8 1 146 144 1 3 Eaton House 63 51 2 4 46 Lyn Eves 11 156158 Jakella 15 High 27 Trees 164166 176 178 TCB 168 170 Issues 39 2 Heatherden Hall 62.6m El Sub Sta 18 Baney 6 34 LB 32 1a Chardan Client 4 House Pump House Tudorlea Laurel Court 6 1 Albury Sherwood House Twyneham Redroofs The Hollies 9 Chilta End Pinewood Studios Ltd. 3 19 21 1 81 8 1 3 82 3 Job Title 4 9 Fn Pinewood Studios Development Framework 4 83 The Laurels Pine Ridge House 17 10 5 23 5 26 12 Lake FB 89 10 11 South Lodge FB Spring 95 25 101 Drawing Title 106 14 145 1 10 Application Site Boundary 151 60.6m Pond 139 8 12 157 112 11 54 Park Lodge Farm 163 4 Gamekeepers Cottage 118 91 42 49.1m FB Scale at A1 Issues 17 89 30 87a 85a 18 85 83 Brackenwood 11 1:2500 @ A1 / 1:5000 @ A3 24 87 Discipline 169 79 73 14 Mapping reproduced by permission of Ordnance Survey on 45 2 Masterplannig Job No Drawing Status 224788-00 PLANNING 1 LB 1 Furze 31 Cottage 2 Iver Heath 10m 10m 50m 0 1 to 29 18 100m 250m All rights reserved. Ordnance Survey Licence number 100018033 8 Pond 29 to 25 23 to 19 17 15 11 Stag and Hounds 9 5 Do not scale Drawing No Issue P-B-000 0h 2 100m 50m (PH) Dellfield Farm A1 A B C D E F G H I J K L M N G:\Jobs\224788-10 PSB - ARAS\4-03 Drawings\4-03-01-02 Arch\Planning\P-B-001.dwg 23 Jan 2013 15:21:02 id: E51A42EE-6939-4F3B-BC37-18BBCE5E5E4D Amparo.Galvan Lodge Pond Gantry 1 SEV ENH IL Planning Application Boundary N Mast Existing Buildings Cherry Orchard LS Pond Farm Hill View Home Farm RO AD Blanchard's Farm Cherry Orchard Existing Covered Way Farm Bungalow Pond Temporary Workshops SAULS FARM Astraea 70.1m St Benedict Contour line Tennis 2 Court Larkswood Springfield Cottages 70.4m BARN Langley Woodhouse Hollydene Existing trees Long Coppice LB Pine Cottage Existing hedgerows Belle Farm Dick Turpins Cottage Parkspring Lodge Wood Pantiles 3 Cottage The Firs Presbytery Woodcroft LM U F ER O C M O M N O R AD PI NE W O Lodge Belle Farm Cottage O D 55.6m RO AD Sevenhills Farm The Bridgettine Convent 57.3m Posts Weir 4 The Oaks Nursery M25 NORTH LOT Gantry Dromenagh Farm 5 THE CLUMP Strawberry Wood Pond Dromenagh Farm House 6 0 GATEHOUSE XXXXXX / / Issued for Outline Planning Approval Issue Date Pond Black Park Ponds Arup Associates Knoll House Heathwood 7 Pond Bratton 13 Fitzroy Street London W1T 4BQ United Kingdom t +44 20 7755 2525 www.arupassociates.com Cattle Grid Pinewood Mews Key Plan PINEW OOD GREE N 8 PINEW TCB OOD Issues GREE N Baney LB Client Chardan House Laurel Court Albury House 9 HEATHERDEN HALL Pinewood Studios Ltd. Job Title Pinewood Studios Development Framework PADDOCK LOT Spring ASHF 10 ORD Drawing Title ROAD Existing Site Plan 60.6m R PINEWOOD Park Lodge Farm 8m high saplings (poor) Pond Gamekeepers Cottage 49.1m FB OAD THOR NBRID Brackenwood 11 Discipline GE RO LB Iver Heath 10m 0 50m 100m 250m Scale at A1 Issues Pond AD Masterplanning Mapping reproduced by permission of Ordnance Survey on Job No Drawing Status 224788-00 PLANNING All rights reserved. Ordnance Survey Licence number 100018033 Drawing No Issue P-B-001 0h Stag and Hounds (PH) Do not scale 1:2500 Dellfield Farm A1 A B C D E F G H I J K L M N Pond Planning Application Boundary Gantry N Mast Existing Buildings 1 Cherry Orchard Hill View South Dock and F&G Block: subject to separate planning permissions Pond Farm Home Farm Blanchard's Farm Cherry Orchard Farm Bungalow Temporary workshops Pond Contour line Astraea 70.1m St Benedict Existing trees Tennis 2 Court Larkswood Existing hedgerows Springfield Cottages 70.4m Long Coppice Langley Woodhouse Hollydene LB Pine Cottage Belle Farm Dick Turpins Cottage Parkspring Lodge Wood Pantiles 3 Cottage Lodge The Firs Presbytery Belle Farm Cottage 55.6m Woodcroft Sevenhills Farm The Bridgettine Convent 57.3m Posts Weir 4 The Oaks Nursery Gantry Dromenagh Farm 5 Strawberry Wood Pond Dromenagh Farm House 6 0 XXXXXX / / Issued for Outline Planning Approval Issue Date Pond Black Park Ponds Arup Associates Knoll House Heathwood 7 Pond Bratton 13 Fitzroy Street London W1T 4BQ United Kingdom t +44 20 7755 2525 www.arupassociates.com Cattle Grid Pinewood Mews Key Plan 8 TCB Issues Baney LB Client Chardan House Laurel Court Albury House 9 Pinewood Studios Ltd. Job Title Pinewood Studios Development Framework Spring Drawing Title 10 Baseline Plan 60.6m 8m high saplings (poor) Pond Park Lodge Farm Gamekeepers Cottage 49.1m FB Scale at A1 Issues Discipline 1:2500 Masterplanning Brackenwood 11 LB Iver Heath 10m 0 50m 100m 250m Pond Mapping reproduced by permission of Ordnance Survey on Job No Drawing Status 224788-00 PLANNING All rights reserved. Ordnance Survey Licence number 100018033 Drawing No Issue P-B-002 0h Stag and Hounds (PH) Do not scale Dellfield Farm G:\Jobs\224788-10 PSB - ARAS\4-03 Drawings\4-03-01-02 Arch\Planning\P-B-002.dwg 23 Jan 2013 15:21:53 id: 17612C11-9527-45CE-A957-C80A7C8E5065 Amparo.Galvan Lodge A1 A B C D E F G H I J K L M N G:\Jobs\224788-10 PSB - ARAS\4-03 Drawings\4-03-01-02 Arch\Planning\P-A-001.dwg 23 Jan 2013 15:19:25 id: 18FDD43D-BF27-47D8-8B44-3D55FE84BF64 Amparo.Galvan Lodge Pond Planning Application Boundary Gantry N Mast Existing Buildings 1 Cherry Orchard Hill View Pond Proposed demolitions Farm Home Farm Blanchard's Farm Cherry Orchard Farm Bungalow Temporary workshops Pond Contour line Astraea 70.1m St Benedict Existing trees Tennis 2 Court Larkswood Existing hedgerows Springfield Cottages 70.4m Long Coppice Langley Woodhouse Hollydene LB Pine Cottage Belle Farm Dick Turpins Cottage Parkspring Lodge Wood Pantiles 3 Cottage Lodge The Firs Presbytery Belle Farm Cottage 55.6m Woodcroft Sevenhills Farm The Bridgettine Convent 57.3m Posts Weir 4 The Oaks Nursery Gantry Dromenagh Farm 5 Strawberry Wood Pond Dromenagh Farm House 6 0 XXXXXX / / Issued for Outline Planning Approval Issue Date Pond Black Park Ponds Arup Associates Knoll House Heathwood 7 Pond Bratton 13 Fitzroy Street London W1T 4BQ United Kingdom t +44 20 7755 2525 www.arupassociates.com Cattle Grid Pinewood Mews Key Plan 8 TCB Issues Baney LB Client Chardan House Laurel Court Albury House 9 Pinewood Studios Ltd. Job Title Pinewood Studios Development Framework Spring Drawing Title 10 Proposed Demolitions 60.6m 8m high saplings (poor) Pond Park Lodge Farm Gamekeepers Cottage 49.1m FB Scale at A1 Issues Discipline 1:2500 Masterplanning Brackenwood 11 LB Iver Heath 10m 0 50m 100m 250m Pond Mapping reproduced by permission of Ordnance Survey on Job No Drawing Status 224788-00 PLANNING All rights reserved. Ordnance Survey Licence number 100018033 Drawing No Issue P-A-001 0a Stag and Hounds (PH) Do not scale Dellfield Farm Notes: KEY: EXTENT OF WORKS EXISTING PUBLIC HIGHWAY BOUNDARY EXISTING SPEED GATE AND ILLUMINATED SIGN WITH NEW ROUNDEL TO BE RELOCATED TO THIS POSITION. EXISTING SPEED REDUCTION ROAD MARKINGS AND SIGNAGE. TO BE RELOCATED AS SHOWN. REV. DETAILS DRAWN CHECKED DATE CLIENT: EXISTING SPEED GATE TO BE RELOCATED TO THIS POSITION WITH NEW ROUNDEL. CROSSING LINKS TO FOOTPATHS WITHIN EAST AREA. NEW SIGNALISED PEDESTRIAN / CYCLIST CROSSING (TOUCAN) LANDSCAPE PROPOSALS NOT SHOWN. LANDSCAPING AND FOLIAGE REMOVED WILL BE DESIGNED TO PROVIDE SUFFICIENT VISIBILITY TO ROUNDABOUT AND TOUCAN CROSSING. CROSSING LINKS TO FOOTPATHS WITHIN WEST AREA. PROJECT: DRAWING TITLE: SCALES: DRAWN: CHECKED: DRAWING NUMBER: DATE: REVISION: P-A-003 D Notes: KEY: CROSSOVER TO BE CONSTRUCTED OF TARMACADAM OR SIMILAR LOCAL AUTHORITY APPROVED MATERIAL (tbc). EXTENT OF WORKS EXISTING PUBLIC HIGHWAY BOUNDARY SIGN TO BE MOUNTED ON NEW GATE EXISTING ACCESS TO BE WIDENED. 2 No. TREES TO BE REMOVED .00 R8 REV. DETAILS DRAWN CHECKED DATE CLIENT: PROJECT: R15.00 DRAWING TITLE: EMERGENCY ACCESS ROUTE ON PSL LAND TO BE CONSTRUCTED USING 'GRASSROAD' OR SIMILAR APPROVED SURFACING MATERIAL (tbc). EXISTING GATE TO BE REMOVED AND REPLACED WITH NEW GATE. SCALES: DRAWN: CHECKED: DRAWING NUMBER: DATE: REVISION: P-A-004 D A B C D E Lodge F G H I J K L M N Pond Planning Application Boundary Gantry N Mast Landscape 1 Cherry Orchard Pond Development Cells Farm Hill View Home Farm Blanchard's Farm Cherry Orchard Farm Bungalow Limits of Deviation Pond Dedicated Cycle path Centreline LOD +/- 30 metres Astraea Edge of Land Use +2/-10 mts. 70.1m St Benedict Edge of Land Use +5 /-10 mts. Tennis 2 Court Larkswood Springfield Cottages 70.4m Long Coppice Langley Woodhouse Hollydene LB Pine Cottage Belle Farm Dick Turpins Cottage Parkspring Lodge Wood Pantiles 3 Cottage Lodge The Firs Presbytery Belle Farm Cottage 55.6m Woodcroft Sevenhills Farm The Bridgettine Convent 57.3m Posts Weir 4 The Oaks Nursery Gantry Dromenagh Farm 5 Strawberry Wood Pond Dromenagh Farm House 6 0 XXXXXX / / Issued for Outline Planning Approval Issue Date Pond Black Park Ponds Arup Associates Knoll House Heathwood 7 Pond Bratton 13 Fitzroy Street London W1T 4BQ United Kingdom t +44 20 7755 2525 www.arupassociates.com Cattle Grid Pinewood Mews Key Plan 8 TCB Issues Baney LB Client Chardan House Laurel Court Albury House 9 Pinewood Studios Ltd. Job Title Pinewood Studios Development Framework Spring Drawing Title 10 Green Space 60.6m Pond Park Lodge Farm Gamekeepers Cottage 49.1m FB Scale at A1 Issues Discipline 1:2500 Masterplanning Brackenwood 11 LB Iver Heath 10m 0 50m 100m 250m Pond Mapping reproduced by permission of Ordnance Survey on Job No Drawing Status 224788-00 PLANNING All rights reserved. Ordnance Survey Licence number 100018033 Drawing No Issue P-P-001 0h Stag and Hounds (PH) Do not scale Dellfield Farm G:\Jobs\224788-10 PSB - ARAS\4-03 Drawings\4-03-01-02 Arch\Planning\P-P-001.dwg 23 Jan 2013 15:22:41 id: 82F58B19-EF6E-498A-B2D8-82E49F91CFE4 Amparo.Galvan A1 A B C D E F G H I J K L M N KEY RETAINED Trees, hedges, shrubs retained with improved management 1 Grassland retained with improved management Open water Ditches Area retained as private garden 2 PROPOSALS (subject to detailed Landscape Design) +5.0m Species rich grassland and heath Open water Woodland Species rich scrub 3 Damp grassland / marsh Scattered tree planting Species rich scrub and scattered trees Swale Hedge 4 Bund Area to be regraded +5.0m Reptile underpass MEASURES ON BUILDINGS (within building plot location tolerances) 5 Areas for greenroofs Areas for wild flower and shrub roofs or walls LIMITS OF DEVIATION Edge of Land Use +2/-10 mts 6 Edge of Land Use +5/-10 mts 0 +1.5m / / Issued for Outline Planning Approval Issue Date +3.5m Randall Thorp -0.5m to +2.0m 7 Canada House 3 Chepstow St Manchester M1 5FW United Kingdom t 0161 228 7721 www.randallthorp.com Key Plan 8 Client Pinewood Studios 9 Job Title Pinewood Studios Development Framework Drawing Title 10 Landscape and Ecology N Scale at A1 Discipline 11 Do not scale 1:2500 Randall Thorp Job No Drawing Status 224788-00 PLANNING Drawing No Issue P-P-002 0h G:\Jobs\224788-10 PSB - ARAS\4-03 Drawings\4-03-01-02 Arch\Planning\P-P-002.dwg 23 Jan 2013 15:34:20 id: 3DE98B0D-020E-4F73-8362-8D47A01C2D34 Amparo.Galvan A1 A B C D E F Lodge G H I J K L M N Pond Planning Application Boundary Gantry N Mast 1 Development cells Mixed use - Stages / Workshop / Offices Cherry Orchard Pond Farm Hill View Home Farm Parking and Backlot Areas Blanchard's Farm Cherry Orchard Farm Bungalow 2d Pond 2e 2c Astraea 70.1m Backlot Areas where temporary structures are permitted Indicative change of height St Benedict 2b Tennis 2 Court Larkswood +70.0-71.0 m AOD The Clump 2 Springfield Cottages 70.4m Langley Woodhouse Hollydene LB Hedgerows Long Coppice +68.0 - 69.0m AOD +69.5-70.5m AOD Pine Cottage Dick Turpins Cottage Wood Pantiles 3 Belle Farm Upper and Lower Limits of Ground Surface +69.5-70.5m AOD Parkspring Lodge +'X'm -'Y'm AOD +67.5 - 68.5m AOD Cottage Limits of Deviation +69.0 - 70.0 m AOD The Firs Lodge Presbytery Belle Farm 67.0 - 68.0 m AOD 2a Woodcroft Dedicated Cycle path Centreline LOD +/- 30 metres Cottage Edge of Land Use +2/-10 mts. 55.6m Edge of Land Use +5 /-10 mts. 3a Levels as existing Sevenhills Farm The Bridgettine Convent 57.3m +68.0-69.0 m AOD Posts Weir 4 The Oaks Nursery +69.5-70.5 m AOD 1b +68.5-69.5m AOD Levels as existing Gantry 3 Dromenagh +68.5-69.5 m AOD 5 Farm +68.0-69.0m AOD Strawberry Wood The Clump Pond Dromenagh Farm House 1a 4a 6 +67.0-67.5 m AOD 4 0 XXXXXX / / Issued for Outline Planning Approval Issue Date Pond Black Park Ponds 1 Arup Associates Knoll House Heathwood 7 Levels as existing Pond Bratton 13 Fitzroy Street London W1T 4BQ United Kingdom t +44 20 7755 2525 www.arupassociates.com Cattle Grid Pinewood Mews Key Plan 8 TCB Issues Baney 1c LB Client Chardan House Laurel Court Albury House 9 Heatherden Hall Gardens Pinewood Studios Ltd. Job Title Pinewood Studios Development Framework 1e Spring Drawing Title 10 Development Zones and Levels 60.6m Pond 1d Park Lodge Farm Levels as existing Gamekeepers Cottage 49.1m FB Scale at A1 Issues Discipline 1:2500 Masterplanning Brackenwood 11 LB Iver Heath 10m 0 50m 100m 250m Pond Mapping reproduced by permission of Ordnance Survey on Job No Drawing Status 224788-00 PLANNING All rights reserved. Ordnance Survey Licence number 100018033 Drawing No Issue P-P-003 0h Stag and Hounds (PH) Do not scale Dellfield Farm G:\Jobs\224788-10 PSB - ARAS\4-03 Drawings\4-03-01-02 Arch\Planning\P-P-003.dwg 23 Jan 2013 15:23:28 id: D2910C55-77B4-404A-ADD3-6342C70F7367 Amparo.Galvan A1 A1 B C D E F G H I J K L M N G:\Jobs\224788-10 PSB - ARAS\4-03 Drawings\4-03-01-02 Arch\Planning\P-P-004.dwg 23 Jan 2013 15:24:08 id: 560E2C7E-7430-4F61-B697-424A0C4AC87D Amparo.Galvan A 1 2 3 4 5 NOTE: To be read in conjunction with P-P-003 6 0 XXXXXX / / Issued for Outline Planning Approval Issue Date Arup Associates 7 13 Fitzroy Street London W1T 4BQ United Kingdom t +44 20 7755 2525 www.arupassociates.com Key Plan 8 Client Pinewood Studios Ltd. 9 Job Title Pinewood Studios Development Framework Drawing Title 10 Areas by Development Zone Scale at A1 Discipline 11 Do not scale N/A Masterplanning Job No Drawing Status 224788-00 PLANNING Drawing No Issue P-P-004 0h A B C D E Lodge F G H I J K L M N Pond Planning Application Boundary Gantry N Mast 1 PROPOSED ROUTES AND LIMITS OF DEVIATION Cherry Orchard Primary Roads Pond Farm Hill View Home Farm Secondary Roads Blanchard's Farm Cherry Orchard Farm Bungalow NOTE - Cycle paths are included within the Roads and Development Cells shown. Pond Controlled Permissive Pedestrian Access (+/- 10 m) Astraea 70.1m St Benedict Footpaths (+/- 10m) Tennis 2 Court Larkswood Springfield Cottages 70.4m Black Park link path Long Coppice Langley Woodhouse Hollydene LB Pine Cottage Edge of secure private land (+/- 10m) Belle Farm Dick Turpins Cottage Location of Proposed New Access from Pinewood Road. - Refer to P-A-003 Rev D Parkspring Lodge Wood Pantiles 3 Cottage Location of Proposed New Emergency Access from Sevenhills Road. - Refer to P-A-004 Rev D Lodge The Firs Presbytery Belle Farm Cottage 55.6m Woodcroft Sevenhills Farm The Bridgettine Convent 57.3m Limits of Deviation Posts Road Edge +/- 2 mts. Weir 4 The Oaks Nursery Road Edge + 5 mts/ - 10 mts. Road Edge +/- 10 mts NOTE - preservation of hedgerows and trees supercedes any inference of encroachment by a limit of deviation Gantry Dromenagh Farm 5 Strawberry Wood Pond Dromenagh Farm House 6 - 19/12/12 Issued for Outline Planning Approval Issue Date Pond Black Park Ponds Arup Associates Knoll House Heathwood 7 Pond Bratton 13 Fitzroy Street London W1T 4BQ United Kingdom t +44 20 7755 2525 www.arupassociates.com Cattle Grid Pinewood Mews Key Plan 8 TCB Issues Baney LB Client Chardan House Laurel Court Albury House 9 Pinewood Studios Ltd. Job Title Pinewood Studios Development Framework Spring Drawing Title 10 Site Access and Circulation 60.6m Pond Park Lodge Farm Gamekeepers Cottage 49.1m FB Scale at A1 Issues Discipline 1:2500 Masterplanning Brackenwood 11 LB Iver Heath 10m 0 50m 100m 250m Pond Mapping reproduced by permission of Ordnance Survey on Job No Drawing Status 224788-00 PLANNING All rights reserved. Ordnance Survey Licence number 100018033 Drawing No Issue P-P-005 0h Stag and Hounds (PH) Do not scale Dellfield Farm G:\Jobs\224788-10 PSB - ARAS\4-03 Drawings\4-03-01-02 Arch\Planning\P-P-005.dwg 23 Jan 2013 15:24:49 id: 294DE43A-ADB0-441C-A1F8-75AFEFB18F91 Amparo.Galvan A1 A B C D E F Lodge G H I J K L M N Pond Gantry Building Ridge Height (AGL) N Mast 1 Storeys 5.0 m min - 8.0 m max 1-2 5.0 m min - 11.0m max 1-2 10.0 m min -14.0m max 2-3 12.0 m min -17.0m max 3-4 Cherry Orchard Pond Farm Hill View Home Farm Blanchard's Farm Cherry Orchard Farm Bungalow Pond Astraea 2.27 W2 2.26 W1 70.1m St Benedict 15.0 m min - 21.5m max 1-4 2.22 Underground waste water treatment plan Tennis 2 Court Larkswood Springfield Cottages 2.25 W1 70.4m Langley Woodhouse Hollydene 2.21 O1 2.7 S1 2.28 flex LB 2.08 S1 2.24 W2 2.19 W1 Wood Pantiles 3 'Max' = Upper Limit 'Min = Lower Limit Belle Farm 2.5 S1 Parkspring Lodge Long Coppice 2.20 W1 2.6 S1 Pine Cottage Dick Turpins Cottage W For further explanation including eaves heights refer to typical buildings parameter drawing 2.23 W2 Cottage 2.18 W2 The Firs Presbytery Lodge Limits of Deviation Belle Farm Cottage 2.17 Building Plot Edge +2 mts / -10 mts. 55.6m Woodcroft Building Plot Edge +5 /-10 mts. Sevenhills Farm The Bridgettine Convent 57.3m 2.11 W1 Building Plot Edge +/- 10 mts. Posts 2.04 S1 4 W Weir The Oaks Nursery 2.03 S1 2.16 flex 1.09 W1 entrance archway and kiosk 2.13 W1 2.15 W2 2.09 O2 2.29 O1 Strawberry Wood Pond 2.02 S1 2.01 S1 5 Dromenagh Farm 2.14 W2 2.10 W2 2.12 W2 entrance archway Gantry Dromenagh Farm House 1.06 MP 6 1.04 W2 2.31 O2 2.30 O2 1.02 S1 O1 0 XXXXXX / / Issued for Outline Planning Approval Issue Date Pond Black Park 1.08 W1 Ponds 7 Arup Associates Knoll House 1.05 W2 Heathwood 1.01 O2b Pond Cattle Grid Bratton 13 Fitzroy Street London W1T 4BQ United Kingdom t +44 20 7755 2525 www.arupassociates.com Pinewood Mews 1.07 O3 Key Plan 1.03 S1 8 TCB Issues 1.10 O1 Baney LB Client Chardan House Laurel Court Albury House 9 Pinewood Studios Ltd. Job Title Pinewood Studios Development Framework Spring Drawing Title 10 Building Plots 60.6m Pond Park Lodge Farm Gamekeepers Cottage 49.1m FB Scale at A1 Issues Discipline 1:2500 Masterplanning Brackenwood 11 LB Iver Heath 10m 0 50m 100m 250m Pond Mapping reproduced by permission of Ordnance Survey on Job No Drawing Status 224788-00 PLANNING All rights reserved. Ordnance Survey Licence number 100018033 Drawing No Issue P-P-006 0h Stag and Hounds (PH) Do not scale Dellfield Farm G:\Jobs\224788-10 PSB - ARAS\4-03 Drawings\4-03-01-02 Arch\Planning\P-P-006.dwg 23 Jan 2013 15:25:33 id: 68D2D5E4-8F9C-4A40-A216-13D60193A13D Amparo.Galvan A1 A B C D E F S1 - SOUNDSTAGE G H I W1 - WORKSHOP J K L W2 - WORKSHOP M S3 - FLEX N G:\Jobs\224788-10 PSB - ARAS\4-03 Drawings\4-03-01-02 Arch\Planning\P-P-007.dwg 23 Jan 2013 15:26:25 id: 29DA66B7-DB8A-4A43-83DF-CE36765A94B0 Amparo.Galvan A1 ENERGY-CENTRE 3000 7000 10000 14000 12903,03 10000 7895 10000 7895 7895 10000 8500 8500 5908 8500 5908 15500 21500 32 ft clear height 19000 15500 21500 19400 3000 1 2 S1 - SOUNDSTAGE TYPE 1 W1 - WORKSHOP TYPE 1 S1 - SOUNDSTAGE TYPE 2 W1 - WORKSHOP TYPE 1 W2 - WORKSHOP TYPE 1 W2 - WORKSHOP TYPE 2 W2 - WORKSHOP TYPE 3 O2 - OFFICE S3 - FLEX SOUNDSTAGE/WORKSHOP O3 - OFFICE MP - PARKING O1- OFFICE TYPE 2 O2 - OFFICE TYPE 1 O2 - OFFICE TYPE 2 O2 - OFFICE TYPE 2 O2b - OFFICE O3- OFFICE 4100 9000 3000 18750 21300 14500 17000 3000 13500 16000 13500 16000 14500 17000 O1 - OFFICE TYPE 3 3000 2700 O1 - OFFICE TYPE 1 10250 12750 10250 12750 10250 12750 3 3000 3000 3000 O1 - OFFICE W1 - WORKSHOP TYPE 1 MP - Multistorey Parking Scale at A1_ 1:200 4 NOTE For all Type Sections - Building's width varies according to the plot - All building height parameters are measured from FFL (finished floor level). The FFL of each building is assumed to be 150 mm above AOD finished plot levels defined in P-P-003 2 10 10 5 B 5 10 10 1.30 O2 a 2 10 A 6 NOTE: To be read in conjunction with P-P-006 Plot reference Type Plot area 0 XXXXXX / / Issued for Outline Planning Approval Issue Date B Arup Associates 7 13 Fitzroy Street London W1T 4BQ United Kingdom t +44 20 7755 2525 www.arupassociates.com A Key Plan Likely area 8 B Client Pinewood Studios Ltd. 9 A Job Title Maximum Area (Maximum width) Pinewood Studios Development Framework Maximum Area (Maximum length) Maximum Area (Average length and width) Drawing Title 10 10 B 18 / 9 * 10 Areas and Dimensions by Plot Scale at A1 A Minimum area Width equal to 18m if plot depth >25m and 9m if plot depth < or = 25m* (Soundstages plots minimum width=36) 11 Do not scale Discipline VARIES Architecture Job No Drawing Status 224788-00 PLANNING Drawing No Issue P-P-007 0h 30 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 05 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 31 Explanation of Parameters 32 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 05 PARAMETERS EXPLANATION 5.1 Overview The proposed development is set out in a series of Parameter Plans, listed below, that define the key elements of the proposals. Each element is defined in terms of its location and configuration within the site, with degrees of tolerance. The degrees of tolerance are applied to ensure there is sufficient flexibility in the proposals to accommodate the potential for relatively minor changes in location, size, shape and alignment of the key elements of the scheme given that, at this stage, the proposals are in outline only. At the detailed design stage it may be necessary to make adjustments to the position of individual buildings or roads within the site to accommodate as yet unsurveyed ground or site conditions that conflict with the position shown in the plans. The degree of flexibility provided in the Parameter Plans has been tailored to apply stricter limits to the size and position of the development at sensitive edges, or adjacent to retained landscape features, and allows more latitude in less critical areas. The alignment, layout and size of the plots, buildings, roads and open spaces shown in the Parameter Plans are based on the intended configuration of the proposals. The flexibility defined in the Parameter Plans can be applied through a limited degree of expansion or contraction from the defined edge positions shown on the plans. In the case of individual buildings, the flexibility is provided, and limited to, expansion or contraction in the width, length and height of each building. PARAMETERS EXPLANATION Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 33 5.2 Structure The following elements of the scheme are defined with Parameter Plans: Land use, development quantum, and layout •Parameter drawings P-P-003 and P-P-004 are to be read in conjunction with each other. •P-P-003 indicates the built development zones and their upper and lower limits of ground level. The Parameter Plan defines the parts of the site proposed for development, including new and Movement, access and circulation •P-P-005 sets out the primary and secondary road system and footpaths proposed for the site, allowing for tolerance on the alignment of the roads. Massing and building scale • Parameter drawings P-P-006 and P-P-007 are to be read in conjunction with one another. retained built areas of the Studios. This shows the ‘footprint’ of •P-P-006 defines the location of each proposed building plot land within the site that is proposed for siting the buildings and within the site, and the upper and lower limits of height, length, facilities of the Studios. and width of each building using a set of height ranges, building •P-P-004 cross references the numbered zones to give type codes and horizontal limits of deviation maximum floor areas in sqm GEA format for buildings to be • P-P-007 contains a schedule and diagrams to be read with developed in each one. the Parameter Plan drawing, tabulating these dimensions for each of the main building types and each building plot. Further Green space, landscape and ecology •P-P-001 shows the green space where there is no built development •P-P-002 defines the proposed uses and functions of the landscape and open areas of the site, including those areas designated for ecological enhancement, sustainable drainage, amenity and landscape buffers for visual screening. explanation is set out within Section 3 of this document. PARAMETERS EXPLANATION 34 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 5.3 Development zones, land use and site levels P-P-003 defines the development zones, uses, and the upper and lower limits of horizontal deviation and of ground surface. Also shown are colour coded limits of deviation for the edges of the development zones which allow for a small amount of flexibility while providing a commitment to containing the building positions within a set area. Limits of deviation have been informed by the assessed level of sensitivity of any particular edge in relation to ecology and visual impact. Site levels are used in conjunction with upper and lower limits of building height explained in P-P-006 and P-P-007 to ascertain maximum effect building envelopes used in the Environmental Statement. The building height parameters are measured from the top of the ‘Finished Floor Level’ (FFL - the internal floor surface) to the highest part of the roof envelope. The FFL is assumed generally to be 150mm above the site levels, shown Above Ordnance Datum (AOD). P-P-004 lists the maximum footprints and GEA’s permitted by types of building. Even though a development cell may expand or contract within its limit of deviation, the total area is fixed. PARAMETER PLAN P-P-003 PARAMETERS EXPLANATION Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 35 +5M +10M -10M -10M -10M +5M A -10M +2M DIAGRAM SHOWING HOW DEVIATION CODING IS APPLIED +5M A1 +5M -5M A2 -10M +0M -5 M +10M +2M ENLARGED AREA OF SHEET DEMONSTRATING APPLICATION OF LIMITS OF DEVIATION AREA A = AREA A1 = AREA A2 THE TABLE SHOWN IN P-P-004 (SEE AT FULL SCALE EARLIER IN THE DOCUMENT) PARAMETERS EXPLANATION 36 5.4 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS Green space and landscaping and ecology The Green Space and Landscaping and Ecology parameter plans outline how the development will commit to providing green space within which a range of landscaping and ecological measures will provide amenity as well as ecological and visual mitigation. The defined limits of deviation allow for small amounts of flexibility as demonstrated in the diagram (right). P-P-001 (Green Spaces) defines the areas of the site in which there will be no built development. The treatment of these areas are then Parameter Plan P-P-001 detailed in P-P-002. P-P-002 defines the manner in which areas within the overall (green) space area will be treated in terms of landscaping, in particular to provide the proposed level of screening and ecological enhancement for the framework. Parameter Plan P-P-002 PARAMETERS EXPLANATION Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS Enlarged Area of Sheet demonstrating application of varying limits of deviation 37 PARAMETERS EXPLANATION 38 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 5.5 Site access and circulation P-P-005 is the site access and circulation plan defining the road layout structure, with upper and lower limits of deviation. Where road layouts are close to ecological habitat corridors they have a smaller allowable deviation. It also shows the areas where access points to the application site will be situated and the approximate locations of pedestrian and cycle routes where they are not incorporated into the roads (reference proposed site access plan). The entrance access from the public highway is described in more detail in the transport and landscape drawings. Road positions have a compatible relationship with building plots and development zones whereby the allowable deviations for each are linked, as described later in this chapter. Parameter Plan P-P-005 PARAMETERS EXPLANATION Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 39 LIMIT OF DEVIATION +/- 2 LIMIT OF DEVIATION +/- 5 LIMIT OF DEVIATION +/- 10 THE GREY LINES DEFINE THE MOST LIKELY ROAD POSITIONS AND THE BOUNDING COLOURED LINES DEFINE UPPER AND LOWER LIMITS OF DEVIATION. width, ‘w’ can vary within the limits of deviation Road width zone of deviation w 5 w 2 2 5 2 5 ALLOWABLE POSITION MOVED PARALLEL THE MAXIMUM DEVIATION ALLOWED IN THAT DIRECTION w 2 5 w ALLOWABLE POSITION MOVED PARALLEL IN THE OPPOSITE DIRECTION TO THE MAXIMUM DEVIATION ALLOWED IN THAT DIRECTION ALLOWABLE ROAD POSITION WITHIN THE LIMITS SET PARAMETERS EXPLANATION 40 5.6 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS Building layout and massing The development Parameter Plans include provision for site massing which meets the quantum set out in the planning application while imposing control measures on building height, length and width and location to control landscape and visual impact on the surrounding area. Within these parameters, the separation of buildings has been considered to allow for fire safety and to ensure that the functional requirements for internal working and external filming are met. A colour coded set of tolerances are applied to the edge of building plots to allow for limited flexibility of building position, orientation and size, to meet future demands. P-P-006 defines the building plot locations and upper and lower limits of deviation for those plots. It also codes each plot by height category and building type, which in turn restricts length and width. P-P-007 is read alongside P-P-006 and provides further detail regarding maximum and minimum footprints, and GEA floor areas for each plot, as well as maximum and minimum eaves and ridge heights, lengths and widths. PARAMETER PLAN P-P-006 ENLARGEMENT PARAMETERS EXPLANATION Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS PARAMETERS TABLE P-P-007 41 PARAMETERS EXPLANATION 42 5.7 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS How the parameters are applied 3 - Equilibrium 1 - Plot Area, P The sum of all of the plot areas, multiplied by the maximum numbers of storeys would make an implied GEA far higher than the maximum GEA’s Each building plot is demarcated by a blue zone. The tone of blue is an easy short-hand reference to set by the Development Zone Parameter Table P-P-004. P the buildings upper and lower limit of height. The maximum GEA’s for each zone are calculated by totalling the likely GEA’s for each building plot. A plot reference number and building type code are also shown. The plot area is P and can vary within the tolerances x shown (explained below) 2 - Likely Footprint, L The likely building outline shown illustratively will sit within that plot. + Total + L Plot Area Total Plot Area >> Maximum GEA Non Permitted It may be the full extent of the building plot area is utilized, but in most cases the likely footprint is slightly smaller. The likely building outline has an area, L. Likely Footprint + + = Maximum GEA PARAMETERS EXPLANATION Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 43 4 - Flexibility The illustrative drawings show a realistic view of the scheme as fully A building which is within the lower and upper limits of deviation developed but within the zonal GEA maximums set by the Parameter of footprint area, but smaller than the Plot Area could be situated Plans. anywhere within that plot, and could also be rotated within the plot if Thus, if a building is developed to its maximum allowable GEA on a there is enough space. single plot, the amount it exceeds its likely GEA by would have to be compensated for elsewhere in the scheme by developing one or more other plots to a lesser extent. PARAMETERS EXPLANATION 44 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 5.7 5 - Maximum footprint How the parameters are applied Each building has a maximum footprint of area, A. The proportion of the footprint can change providing it fits within the maximum and minimum width, height and length defined in the General case “Building heights, widths and lengths, upper and lower limits” table. P > A > L ( Maximum Length) Throughout this document, the use of the word ‘maximum’ is equivalent to ‘upper limit’ and the word ‘minimum’ is equivalent to ‘lower limit’. P>L A In some cases the Maximum footprint A L is equal to the Likely footprint, L P and also equal to the Plot Area, P. P P > A > L ( Maximum Depth) In general though, Plot Area (P) is greater than Likely Area (L) P is greater than A is greater than L. A Key If a building maximum footprint is less than the plot area, it could be Plot Area (P) Maximum Area (A) Likely Area (L) P placed anywhere within the plot area. It could also be extended to the maximum length - providing it does Maximum Area (A) is greater than Likely Area (L) not exceed the maximum footprint area but smaller than Plot Area (P) OR It could be extended to the maximum width of the plot providing it does not exceed the maximum width in the table. PARAMETERS EXPLANATION Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 6 - Minimum Footprint Each building has a minimum footprint of area, A. It can change proportion providing it fits within the maximum and minimum widths and lengths defined in the “Building heights, widths and lengths, upper and lower limits” table In most cases a building minimum width is 9m if the plot is less than 20m in total width. In most cases a building minimum length is 20m shorter than the maximum length of the plot. 7 - Plot edge deviation On the building plots parameter plan, each plot has colour coded edges indicating upper and lower limits of deviation. Three margins of deviation are proposed. +2/-10m : meaning the edge can move outwards 2m and inwards 10m - applied to building plots with high level of sensitivity to ecological and visual impact +5m/-10m : meaning the edge can move outwards 5m and inwards 10m - applied to building plots with moderate levels of sensitivity +/-10m : meaning the edge can move outwards and inwards 10m - applied to building plots assessed to have low levels of sensitivity 45 PARAMETERS EXPLANATION 46 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS LIKELY POSITION 8 - Road and plot interaction All roads and plots are drawn in their most likely location. Limits of deviation of plots and their adjacent primary and secondary roads are designed to be compatible. Three examples are shown on the opposite page. LIMIT OF DEVIATION +/- 2 LIMIT OF DEVIATION +2/-10 LIMIT OF DEVIATION +/- 5 LIMIT OF DEVIATION +5/- 10 LIMIT OF DEVIATION +/- 10 LIMIT OF DEVIATION +10/-10 PLOT LIMITS OF DEVIATION ROADS LIMITS OF DEVIATION PARAMETERS EXPLANATION Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 47 Example 1 Example 2 Example 3 In this example one road moves away from the centre of the In this example a road moves towards the centre of the The roads in question could move up to 5m from their plot by 10m and another moves towards the centre of the plot by up to 10m, and the other road moves away from intended position but the constraints on the building are plot by 10m. the plot centre by 5m. more onerous meaning it can only move 2m beyond its originally intended position. The result is a plot where the orientation has changed but The result is likely to be a smaller overall plot size but could be of a comparable area to its originally intended of the same orientation as the originally intend plot Highly constrained limits of deviation like this have been size. position. used in the scheme where the sensitivities of the site necessitate a particular building scale and location. The edge of the plot moving outwards by 10m is a degree The edge of the plot moving out by 5m is a degree of of deviation that is not applicable in a visually sensitive deviation that is applicable in an area of moderate location. sensitivity, and will be a low building with adequate screening for this to be of insignificant consequence. EXAMPLE 1 EXAMPLE 2 EXAMPLE 3 PARAMETERS EXPLANATION 48 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 9 - The ‘maximum effect’ As stated in the opening part of this explanation the limits of deviation do not allow for a bigger development than is described by the development zones parameter table. Nevertheless it has been important to understand the plot area deviations as part of landscape and visual impact assessment. Likely Footprint (L) In theory, a plot could expand by up to 20m along its length and Maximum area (A) width. In practice, the limits set in the parameter tables prevent Plot area (P) building masses from occupying their entire building plot. The maximum effect has been modelled along the principles set out MAXIMUM EFFECT VOLUME below for the development of verified views. Refer to the ES for verified views. LIKELY CASE The maximum effect envelope for buildings in any plot is defined by extending the edges of the volume to the points of maximum deviation. The likely building mass has been modelled and sits within that volume. Alternative building positions and shapes could exist maximum effect Volume anywhere within that theoretical envelope - but only up to the maximum footprint area, and maximum GEA allowed within the parameter tables. It would not possible to develop a scheme where all plots are built to their maximum effect envelope because of the principle of equilibrium outlined above. MAXIMUM EFFECT VOLUME IS GREATER THAN OR EQUAL TO LIKELY CASE AND IS EXAGGERATED FOR THE PURPOSES OF THESE DIAGRAMS PARAMETERS EXPLANATION Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 49 The illustrations here demonstrate the likely building volumes used in the Illustrative Masterplan, the maximum effect volumes generated from maximum building heights and plot offsets and the two overlaid. It should be noted that the ‘maximum effect volume’ infers a scale of development which would be impossible to achieve under the constraints imposed by the parameter tables in P-P-004 and P-P-007. What the representation of the maximum effect volume is useful for is providing an outline in three dimensions which has been used to generate verified views from multiple locations which are consistently showing the maximum effect. These views have also been used to develop mitigation strategies which THE LIKELY BUILDING ENVELOPE GENERATED FROM THE MASSING AND SITE LEVEL PARAMETER PLANS THE MAXIMUM BUILDING ENVELOPE GENERATED FROM THE MASSING AND SITE LEVEL PARAMETER PLANS landscape parameters achieve. THE LIKELY AND MAXIMUM BUILDING ENVELOPE GENERATED FROM THE MASSING AND SITE LEVEL PARAMETER PLANS Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS 51 S 52 Pinewood Studios Development Framework | PRINCIPLES AND PARAMETERS PINEWOOD STUDIOS DEVELOPMENT FRAMEWORK FEBRUARY 2013