INFORMACIÓN GENERAL GENERAL INFORMATION ACTUACIONES PLANIFICADORAS PLANNING ACTIONS Consolidation and impulse of planning mechanisms Consolidación e impulso de los instrumentos de planificación The Infrastructure Planning Directorate, to which the Director Plans Directorate belongs, is structured in seven large areas whose final objective is to establish the reference framework in which the airports of Aena’s network are developed. La Dirección de Planificación de Infraestructuras, en la que se These areas are focused on: Definition and Analysis of Director Plans, Technical Developments, Airport Developments, Land Management, Environment, Madrid’s New Airport Studies Planning and Geographical Information Systems. Estas áreas se concretan en: Definición y Análisis de Planes Once approved the Director Plans of the general interest airports during the year 2001 (MadridBarajas and Barcelona approved in 1999 and Tenerife Sur and Monflorite-Alcalá in 2002) and once began the processing on the Special Plans of most of these airports during the year 2002, the activity developed in 2003 can be summarised in the following large development areas. integra la Dirección de Planes Directores, se estructura en siete grandes áreas cuyo objetivo final es establecer el marco de referencia en el que se desarrollan los aeropuertos de la red de Aena. Directores, Desarrollos Técnicos, Desarrollos Aeroportuarios, Gestión del Suelo, Medio Ambiente, Planificación Estudios Nuevo Aeropuerto de Madrid y Sistemas de Información Geográfica. Aprobados los Planes Directores de los aeropuertos de interés general durante el año 2001 (Madrid-Barajas y Barcelona se aprobaron en 1999 y Tenerife Sur y Monflorite-Alcalá en 2002) e iniciada la tramitación de los Planes Especiales de la mayor parte de estos aeropuertos durante el año 2002, la actividad desarrollada durante el año 2003 se puede resumir en los siguientes grandes With the publication of all airports Director Plans, Aena has continued with the traffic forecast update on a short, medium and long term basis for all airports; moreover it has made an exhaustive monitoring of the activities included in the Director Plans, basically focused on the prioritisation of investments and based on both the comparison and analysis of the supply / demand parameters. Likewise, Aena has made specific studies on adaptation of action requests in each airport to the airport development defined by its Director Plan. ámbitos de desarrollo. Moreover, the beginning of the Special Plans processing during the year 2002, made this approval process to continue in 2003 and it achieved, on the 31st December, the definite approval of 3 special plans (Burgos, Fuerteventura and Logroño); the provisional approval for the Special Plans of Granada, Valencia and Vitoria; and the initial approval of the Special Plans of Asturias, Málaga, Melilla, Palma de Majorca, Santander and Zaragoza Airports. to al desarrollo aeroportuario definido por su Plan Director. Con la publicación de los Planes Directores de todos los aeropuertos, se ha continuado realizando la actualización de las previsiones de tráfico a corto, medio y largo plazo de todos los aeropuertos; así como un exhaustivo seguimiento de las actuaciones contenidas en los Planes Directores, fundamentalmente enfocado a la priorización de inversiones y basado en la comparación y análisis de los parámetros de oferta / demanda. Además se han realizado estudios puntuales de adecuación de solicitudes de actuación en cada aeropuer- Así mismo, el inicio de la tramitación de los Planes Especiales durante el año 2002, llevó a que durante el año 2003 continuase este proceso de aprobación, consiguiendo, a 31 de diciembre, tener aprobados con carácter definitivo 3 planes especiales (Burgos, Fuerteventura y Logroño); a disponer de aprobación provisional para los Planes Especiales de Granada, Valencia y Vitoria; y contar con la aprobación inicial de los Planes Especiales corresMemoria / Annual Report 2003 49 ACTUACIONES PLANIFICADORAS PLANNING ACTIONS pondientes a los aeropuertos de Asturias, Málaga, Melilla, Palma de Mallorca, Santander y Zaragoza. Junto con estos dos instrumentos de planificación (planes directores y planes especiales), es necesario desarrollar y estructurar en documentos más específicos las líneas marcadas en ellos. Para realizar esta labor se continuó la elaboración de los PLANES DE ACTUACIÓN de todos los aeropuertos de Aena y se han realizado los DISEÑOS FUNCIONALES DE LAS ÁREAS TERMINALES que la Dirección de Infraestructuras solicitó, en concreto se finalizaron los trabajos correspondientes a los aeropuertos de Gran Canaria, El Hierro, Córdoba y Badajoz, iniciándose los trabajos para el área terminal de Vigo. En líneas generales, podemos definir el PLAN DE ACTUACIÓN de un aeropuerto como el documento que presenta, de una manera integrada, actualizada y resumida la información procedente del Plan Director, del Plan Especial, del Diseño Funcional (si se ha elaborado), Proyectos de Infraestructuras previstos, Programa de Actuaciones Plurianual (P.A.P.) aprobado por el Ministerio de Fomento, así como los datos de la capacidad de terminales y plataformas. El DISEÑO FUNCIONAL de un área terminal tiene como principal objetivo el análisis de la situación actual del aeropuerto, detectar las carencias del presente, así como calcular las infraestructuras e instalaciones necesarias para atender la demanda prevista con los niveles de calidad adecuados, basándose en las prognosis de tráfico, facilitando así la elaboración de los proyectos constructivos que realiza la Dirección de Infraestructuras. Por último, en el ámbito internacional, la Dirección de Planificación de Infraestructuras también ha comenzado, durante el año 2003, a Together with these two planning instruments (director plans and special plans), it is necessary to both develop and structure in more specific documents the guidelines highlighted in the aforementioned instruments. In order to carry out this task, Aena continued with the elaboration of the ACTION PLANS of all its airports and it has made the FUNCTIONAL DESIGNS OF TERMINAL AREAS requested by the Infrastructures Directorate, in particular, Aena finished the works corresponding to the airports of Gran Canaria, El Hierro, Córdoba and Badajoz, and it started the works for Vigo’s terminal area. In general, we can define the ACTION PLAN of an airport as the document presenting, in an integrated, updated and summarised way, the information derived from the Director Plan, Special Plan, Functional Design (if made), expected Infrastructures Projects, Multiannual Actions Programme (P.A.P.) approved by the Ministry of Development, as well as the data of terminal and apron capacity. The main objective of the FUNCTIONAL DESIGN of a terminal area is the analysis of the airport’s current situation, to detect its lacks, as well as to evaluate the necessary infrastructures and facilities to meet the expected demand with appropriate quality levels, basing on traffic forecast, thus facilitating the elaboration of the constructive projects made by the Infrastructures Directorate. Finally, on an international basis, in 2003 the Infrastructure Planning Directorate has also started to work on the updating of the Master Plans of the Pacific Airport Group (Mexico). These works are requested by Aena International and they will be finished by the first term of 2004. trabajar en la actualización de los Planes Maestros del Grupo Aeroportuario del Pacífico (México). Estos trabajos son encargados Land availability por Aena Internacional y tendrán su finalización durante el primer One of the Directorate’s most significant areas is the one in charge of providing the infrastructures executory units with the necessary land for the airports development mentioned in its director plans. trimestre del año 2004. Puesta a disposición de Suelo Una de las áreas más significativas de la Dirección es la encargada de poner a disposición de las unidades ejecutoras de infraestructuras el suelo necesario para el desarrollo de los aeropuertos previsto en sus planes directores. Durante el año 2003 se ha continuado con la ingente labor de disponer de los terrenos necesarios y previstos por el plan director de cada aeropuerto, mediante el procedimiento de expropiación forzosa. 50 Memoria / Annual Report 2003 During the year 2003, Aena has continued with the huge task of having the necessary land requested by the director plan of each airport, by means of expropriation. ACTUACIONES PLANIFICADORAS PLANNING ACTIONS The expropriation enquiries are executed by phases, adapting the land requirement to the projects expected by the infrastructures development units. This year’s most remarkable actions have been executed in the following airports, reaching an investment volume of 78,145,000 €. Los expedientes de expropiación se ejecutan por fases, adecuando las necesidades de suelo a los proyectos previstos por las unidades de desarrollo de infraestructuras. Las actuaciones más destacadas en este año se han ejecutado en los siguientes aeropuertos, alcanzando un volumen inversor de 78.145.000 €. Aeropuerto / Instalación Inversión en terrenos realizada en 2003 Airport / Facility Land investment made in 2003 Asturias Barcelona Fuerteventura Granada Huesca Madrid / Barajas Málaga Melilla Pamplona Vejer - Cádiz (Radar) Vigo TOTAL Once occupying the lands subject to the expropriation enquiry, and with the aim to incorporate them to Aena’s patrimony on a definite basis, it is necessary to register them in the corresponding Land Registry. During the year 2003 the following lands have been registered with their corresponding area in the following airports: 73.000 56.528.000 1.753.000 256.000 710.000 15.145.000 444.000 2.138.000 180.000 18.000 900.000 78.145.000 Una vez ocupados los terrenos objeto del expediente de expropiación, y con el fin de incorporarlos definitivamente al patrimonio de Aena, se hace necesario proceder a su inscripción en los Registros de la Propiedad correspondiente. Durante el año 2003 se han registrado las siguientes fincas, con su correspondiente superficie en los siguientes aeropuertos: Aeropuerto Número de fincas Superficie en m2 Airport Number of lands Area in square metres Asturias Barcelona Granada Madrid / Barajas Otros TOTAL Another relevant function of this Land Management unit is the so-called Patrimony Regulation, which makes the prove, enquiry and physical and legal identification of public domain goods forming the airport facilities, which have been transferred to Aena, on a legal basis, for the fulfilment of its goals. 16 98 10 42 2 168 49.163 1.210.207 27.278 282.278 85.778 1.654.704 Otra importante faceta de esta unidad de Gestión del Suelo es la denominada Regularización Patrimonial, en ella se realiza la comprobación, depuración e identificación física y jurídica de los bienes de dominio público que conforman los recintos aeroportuarios y que, por Ley, han sido transferidos a Aena para el cumplimiento de sus fines. Memoria / Annual Report 2003 51 Asturias. Importante avance en desarrollo del Plan Director Asturias. Important progress on the development of the Director Plan 52 Memoria / Annual Report 2003 ACTUACIONES PLANIFICADORAS PLANNING ACTIONS After the subsequent co-ordination with the Ministries of Defence and of the Treasury and in its case, the Public Administrations involved (autonomous, insular or local), the corresponding “Adherence to Aena” of those lands integrating the airport facility is signed. The process end with the registration and grouping of all in the Land Registry. During the year 2003, the patrimony legalisation of the airports of: Asturias, Córdoba, La Gomera, Granada; Ibiza, Jerez, Minorca and Vitoria. Tras la preceptiva coordinación con los Ministerios de Defensa, Hacienda y, en su caso, las Administraciones Públicas implicadas (autonómicas, insulares o locales), se firma el correspondiente “Acta de Adscripción a Aena” de aquellas fincas que integran el recinto aeroportuario. El proceso finaliza con la inscripción y agrupación de todas ellas en el Registro de la Propiedad. Durante el año 2003 ha finalizado la regularización patrimonial de los recintos aeroportuarios de: Asturias, Córdoba, La Gomera, Granada, Ibiza, Jerez, Menorca y Vitoria. Studies for a new airport in Madrid Within the infrastructures planning works, during the year 2003, the works of the ENAM project continued (Madrid’s New Airport Study). Two alternative development possibilities were analysed in detail and from different points of view. Estudios para un nuevo aeropuerto en Madrid Dentro de los propios trabajos de planificación de infraestructuras, durante el ejercicio del año 2003 se continuaron los trabajos del proyecto ENAM (Estudio Nuevo Aeropuerto de Madrid), en los que se analizaron, con detalle y desde diversos puntos de vista, dos posi- Geographical information systems Finally, an essential aspect of the service and products provided by this Directorate to Aena as a whole, is the one corresponding to the Geographical Information Systems, whose main activity is focused on the updating, homogenisation, modernisation and monitoring of Aena’s carto-geographical information quality. In this sense, during the year 2003, a new cartography exterior to all Aena’s airport has been made from the orthoimages sent via satellite; thus, an approximate area of 10 x 10 square km. is available in the surroundings of all airports of Aena’s network. Aena has continued providing support and training to the users of SAOS application (Airport System of Satellite Orthoimages). It has also fulfilled the orthoimages requests, geo-reference, co-ordinates study or general airport system production, both in hard and soft copy, for the different Directorates of Aena. bles alternativas de desarrollo. Sistemas de información geográfica Finalmente, un ámbito esencial en los servicios y productos prestados por esta Dirección al conjunto de Aena, es el que corresponde a los Sistemas de Información Geográfica, cuya principal actividad se centra en la actualización, homogeneización, modernización y control de la calidad de la información carto – geográfica de Aena. En este sentido, durante el año 2003, se ha realizado una nueva cartografía exterior a todos los aeropuertos de Aena, a partir de las ortoimágenes obtenidas vía satélite; con ello se dispone de una zona aproximada de 10 X 10 Km. cuadrados alrededor de todos los aeropuertos de la red Aena. Se ha continuado dando soporte y formación a los usuarios de la aplicación SAOS (Sistema Aeroportuario de Ortoimágenes Satélite), a la vez que se ha dado cumplida entrega a las peticiones de ortoimágenes, georeferenciación, estudio de coordenadas o montaje del sistema general aeroportuario, en formato digital y papel, para las diferentes Direcciones de Aena. Memoria / Annual Report 2003 53 ACTUACIONES PLANIFICADORAS PLANNING ACTIONS Dentro de este ámbito, también se ha generado la versión 7 del Sistema de Información DIACAE (a definir), adaptando la Metodología de Organización y Explotación del Sistema de Información DIACAE para la mejora de la representación de los sistemas eléctricos de Aena y se ha mejorado esta aplicación diseñada para el entorno de AutoCAD. También se ha realizado la normalización de la información gráfica de los aeropuertos de: Bilbao, Gerona-Costa Brava, Logroño, Málaga, Murcia-San Javier, Pamplona, San Sebastián, Santiago y Valladolid. Por otra parte, se iniciaron los trabajos para establecer una Red de Control Topográfica en cada aeropuerto de la Red, que sirva de referencia y apoyo a todos los trabajos de topografía que realice cualquiera de las Direcciones de Aena, con sistemas de referencia ED50, WGS84 y local. A esto se debe añadir que se están determinando las coordenadas de un conjunto de puntos de interés en cada aeropuerto. Durante el año 2003 se han entregado los aeropuertos de Córdoba, Granada, Logroño, Pamplona, Sevilla y Vitoria. Se ha realizado el prototipo de un GIS en el aeropuerto de Jerez, ofreciendo un continuo soporte a los usuarios para su adecuado funcionamiento. Este Sistema de Información Geográfica de Jerez será la base y prototipo del GIS de carácter genérico que se desarrollará a partir del año 2004 para el conjunto de Aena. 54 Memoria / Annual Report 2003 Within this scope, Aena has also created version 7 of the DIACAE Information System (to be defined), adapting the DIACAE Information System’s Organisation and Exploitation Methodology for the improvement of the representation of Aena´s electric systems and this application designed for the AutoCAD environment has also been improved. Moreover, Aena has made the normalisation of the graphical information of the airports of: Bilbao, Gerona-Costa Brava, Logroño, Málaga, Murcia-San Javier, Pamplona, San Sebastián, Santiago and Valladolid. On the other hand, the works to establish a Topographical Control Network in each airport of the Network started. It would be a reference and support for all topographical works to be made by any Directorate of Aena, with reference systems ED50, WGS84 and local. It is worth mentioning that the co-ordinates of a points of interest group are being determined in each airport. During the year 2003, the airports of Córdoba, Granada, Logroño, Pamplona, Seville and Vitoria have been delivered. The prototype of a GIS in Jerez airport has been made. It offers a continuous support to the users for its adequate use. This Geographical Information System of Jerez will be the basis and prototype of a generic GIS to be developed from January 2004 for Aena as a whole. El Plan Director del Aeropuerto de Barajas tuvo un desarrollo notable The Director Plan of Barajas Airport experienced a remarkable development Memoria / Annual Report 2003 55