Subido por menanator

E4131 1YR TNK225 VIS INSP RUN

Anuncio
Maintenance Work Instruction
PV-P-PRM-001-0
Code:
Revision #
Issue Date
Next Revision Date
Page
E4131 1YR TNK225 VIS INSP
RUN
0
2023-05-11
TBD
1 of 4
E4131 YEARLY TNK225 VIS INSP RUN
Assigned Dept: 135
(PM6;CBM)
Frequency: 1 YR
PV area: 4131
This work is covered by:
□
An open work permit
Main Work Center: 10RL-TAB
(PRPDM)
Shutdown Required: NO
Open Permit #: ____________
□
A new work permit
Permit Board #: ____________
Time to Complete: 6 hours
SAFETY INSTRUCTIONS & INFORMATION
** Complete an FLRA **
•
•
•
•
•
•
Complete a proper walk around before entering any work
area when conducting the workplace exam.
Note all hazards and conditions fixed on the workplace
examination template.
Report all hazards that could not be fixed to your
immediate supervisor.
Exercise your ‘Stop Work’ Authority if conditions are not
suitable for working.
Do NOT conduct a task or operate equipment you are not
trained and proven competent on.
Review any JSA’s with all personnel involved with this job.
Acceptance:
I have reviewed the work permit and carried out the required risk assessment. I have received the
necessary training and have been deemed competent to accomplish safely and correctly the required
tasks associated with this work instruction.
Accepted by: __________________Signature: ______________ Date:(yyyy-mm-dd) ____________
Maintenance Work Instruction
Code:
Revision #
Issue Date
Next Revision Date
Page
PV-P-PRM-001-0
E4131 1YR TNK225 VIS INSP
RUN
0
2023-05-11
TBD
2 of 4
Documents and References:
PV-P-PRM-101-X_Process Plant Work Permit_revX_PVDC_date
PV-P-PR-031-X_Process Plant Field Level Risk Assessment_revX_PVDC_date
PV-P-PRO-xxx-0_Process Plant Job Hazard Analysis_revX_PVDC_date
Document Register
Register identification
Type
Location
Retention period
Process Plant MWI Register
Copy/filing cabinet
Maintenance Planning
office
Livelink
Electronic
IT server
RCMCost
Electronic
IT server
Permanent.
Latest version is kept.
Permanent:
All versions are kept.
Permanent
Latest version is kept
Revision History
Revision
Date (yyyy-mm-dd)
Description of changes and/or modifications
Maintenance Work Instruction
PV-P-PRM-001-0
Code:
Revision #
Issue Date
Next Revision Date
Page
E4131 1YR TNK225 VIS INSP
RUN
0
2023-05-11
TBD
3 of 4
Task Details
PV3-4131-TNK0225 (TANK - CIL 2)
Task Description
Inspeccionaar visualmente el tanque paracumplir con los
requisitos de la API. Realizar esta actividad con el
procedimiento de inspección visual de PVDC.
Visually inspect the tank to meet API requirements. Carry
out this activity with the PVDC visual inspection procedure.
OK
Not
Not
OK Complete
□ □ □
Observations
Maintenance Work Instruction
PV-P-PRM-001-0
Line Ref #
Code:
Revision #
Issue Date
Next Revision Date
Page
E4131 1YR TNK225 VIS INSP
RUN
0
2023-05-11
TBD
4 of 4
Observations - Notes - Comments
Spares, PPE & Special Tools
Spares description
Times used in this PM
PPE & Special Tools
Times used in this PM
Work Instruction - Final Comments
Additional Resources:
Actual Hours:
Date:
Sign off: ____________________________________
Descargar